Construction Of Arch And Landscape Works Adjaccent To Arch At Moshin Bridge Approach Near H 8 Drive House In Port Area With One Year Maintenance
Sw-1: Replacement Of Steel Girder Up Line Bridge No.34 At Km: 303/940-962 Span 1x12.20m Steel Girder+2x3.05m Rcc Slab Land Arch Closed By Rcc Twin Box Of Size 2x5.0x4.451m Cast-in-situ. Sw-2: Ancillary Track Work
Decoration Of Park Circus Rail Over Bridge Rob On Maa Flyover By Supply, Installation, Testing And Commissioning Of Led Rgbw Architectural Light And Allied Works Including Mandatory 5 Years Operation And Maintenance Comprehensive O And M
Construction Of Bow String Steel Arch Major Bridge 2nos Across River Iravanjippuzha In The Kozhikode District Of Kerala State Anakkampoyil Kalladi Meppadi Package I Constr Of Bow String Steel Arch Major Bridge
Construction Of 125 Mtr Span Arch Bridge At Rd 42 410 On Nh 154A Sh 125 Mtr Span Through Arch Bridge Formation Cutting And Filling Protection Work Metalling And Tarring Road Side Drain Road Furniture
Construction Of Bow String Steel Arch Major Bridge 2nos Across River Iravanjippuzha In The Kozhikode District Of Kerala State Anakkampoyil Kalladi Meppadi Package I