Gem Bids For 2387 Led Luminaire For Road And Street Lights V2 Conforming To Is 10322 Part 5 Section 3 Q3 Led Luminaire For Floodlight V2 Conforming To Is 10322 Part 5section 5 Q3 Led Batten Q2 Self Ballasted Led Lamps For General Lighting Services V2 Conforming To Is 16102 Q2 Led Luminaire Recessed Luminaire V3 Conforming To Is 10322 Part 5section 2 Q3
Gem Bids For 500 Self Ballasted Led Lamps For General Lighting Services V2 Conforming To Is 16102 Q2
Supply Of 36 Watts High Frequency Electronic Ballast.
Supply Of 400 Watt Hpsv Copper Ballast For Light Fittings Procurement Of 400 Watt Hpsv Copper Ballast For Light Fittings
Provision Of Construction Of Ballast Less Track For Line 1, 2 And 3 Of Abu Road Yard Of Ajmer Division
Supply Of Ballast At Miyn, Kuq, Pqd, Lav, Dnq, Si, Jau, Sri For Yard Improvement Work Under The Jurisdiction Of Sr. Den/Ii/Kir.
Bangalore -Jolarpettai Section: Sw-I: Through Ballast Recoupment For A Length Of 22.0Kms From 313/000 - 322/000, 330/000-333/300, 340/000-341/300 On Up Line And 325/400-332/200, 337/400-339/000 On Down Line In Sse/P.Way/Whitefield Section. Sw-Ii: Through Turn Out Renewal Ttr Fs + Tws + Wcms - 49 Sets And Ttr Tws + Wcms - 10 Sets In Connection With The Work Of Increasing Speed From 110 To 130Kmph. Sw-Iii: Through Ballast Recoupment Of Points And Crossings 15Nos In Sr.Den/East/Sbc Section.
S&T Work In C/W Provision Of Ballast Siding At Hafizpur Station Of Mb Div.
Miscellanious Track Work Including Dismantling Of Existing Track, T/outs, Insertion Of New T/outs, Laying & Linking Of Track, Supply & Spreading Of Ballast, Deep Screening, Cess Formation, Transportation Of P-way Material And Other Connected P-way Activities In Connection With Phase Ii&iii Yard Remodelling Work Of Prayagraj Station Of Prayagraj Division.
Aden/Mys Subdiv: Safety Works Of Track During Pre-Monsoon & During Monsoon And Ballast Unloading In Sse/Pway/Krnr, Mys-Cmnr & Mys Sections. Sw-I:- Sse/Pway/Krnr Sec. Safety Works Of Track During Pre-Monsoon & During Monsoon And Ballast Unloading Sw-Ii:- Sse/Pway/Mys-Cmnr Sec. Safety Works Of Track During Pre-Monsoon & During Monsoon And Ballast Unloading Sw-Iii:- Sse/Pway/Mys Sec. Safety Works Of Track During Pre-Monsoon & During Monsoon And Ballast Unloading
Aden/Dvg Sub Div: Safety Works Of Track During Pre-Monsoon & During Monsoon And Ballast Unloading In Sse/P.Way/Dvg, Rnr & Hphi Sections Sw-I-Sse/P.Way/Dvg Section : Safety Works Of Track During Pre-Monsoon & During Monsoon And Ballast Unloading Sw-Ii-Sse/P.Way/Rnr Section : Safety Works Of Track During Pre- Monsoon & During Monsoon And Ballast Unloading Sw-Iii-Sse/P.Way/Hphi Section : Safety Works Of Track During Pre-Monsoon & During Monsoon And Ballast Unloading
Aden/cta Sub Div: Safety Works Of Track During Pre-monsoon & During Monsoon And Ballast Unloading In Sse/p.way/shv, Cta & Momu Sections Sw-i- Sse/p.way/shv Section : Safety Works Of Track During Pre-monsoon & During Monsoon And Ballast Unloading Sw-ii-sse/p.way/cta Section : Safety Works Of Track During Pre-monsoon & During Monsoon And Ballast Unloading Sw-iii- Sse/p.way/momu Section : Safety Works Of Track During Pre-monsoon & During Monsoon And Ballast Unloading
Signalling Electronic Interlocking Alteration Work And Other Outdoor Works In Connection With Extension Of Dn Yard Reception & Dispatch Lines Five Lines And Development Of Goods Shed With Shifting Of Ballast Siding At Titoli Station Of Mumbai Division.
Supplying And Stacking Of Hard, Durable, Machine Crushed, Track Ballast Of Approved Quality And As Per Railways Latest Specification And Stacking The Same On Cess Alongside /formation From Meramundali Excluding To Budhapank Including In Connection With 3rd & 4th Line Project Between Salegaon To Budhapank Of East Coast Railway
Execution Of Earthwork In Formation, Minor Bridges, Execution Of P.way Linking Works Including Workshop, Supply Of Ballast And Other Allied Works In Connection With Setting Up Of Electric Loco Periodical Over Hauling Poh Workshop At Kalahandi Norla Under Sambalpur Division Of East Coast Railway.
Various P.way Works Such As Casual Sleeper Renewal, Rail Renewal, Lifting & Packing Of Psc Sleepers, Distressing, Cut Rail Welding, Boxing Of Ballast, Cleaning Of Jungle, Shifting Of Materials From Section Etc. And Other Enabling Works In Sse/p.way/jjkr Unit Under The Jurisdiction Of Aden/jjkr Of Khurda Road Division.
Various P.way Works Such As Casual Sleeper Renewal, Rail Renewal, Lifting & Packing Of Psc Sleepers, Distressing, Cut Rail Welding, Boxing Of Ballast, Cleaning Of Jungle, Shifting Of Materials From Section Etc. And Other Enabling Works In Sse/p.way/ Bhc Unit Under The Jurisdiction Of Aden/jjkr Of Khurda Road Division.
Pre During, And Post Bcm Works For Deep Screening, Of Ballast In Points And Crossing And Plain Track And De-Stressing In The Jurisdiction Of Sr.Den/N/Jhs
Gem Bids For 270 High Pressure Sodium Vapour Lamps Hpsv Lamps As Per Is 9974 Part 1 And 2 Q3 Lamp Starter Ignitors - Starting Device For Hpsv Lamps Metal Halide Lamps As Per Is 12449 Part 1 And Part 2 Q3 Lamp Ballast For Hpsv Lamps As Per Is 15882:2009 Is 15885 Q3
Hubballi Division:Sw1:Dharwad-Alnawar Dwr-Lwr Section Provision Of W- Beam Crash Barrier For Total Length Of 5.3Rkm Between Dharwad-Alnawar Dwr- Lwr Section. Sw-Ii:Dharwad-Alnawar Dwr-Lwr Section Proposed Improvements Mugad Ballast Depotmaintenance Period-06Months