Removal & Re-Fixing Of Aluminum Insulation Sheeting On Water Wall Tubes Around Soot Blowers And Burner Panels, Hot Venturi Ducting Of Mills, Hot Air Bus Ducts, Inter Connecting Duct Over Aph And Id Fan To Chimney Areas Of Boiler In Unit-7 During Annual Overhaul Period 2025-26 Dr.Nttps
Supply Of Boiler Air Preheater Tubes
Labour Contract For Co-gen Boiler Side Wall Tubes, Front Wall Tubes, Primary And Secondary Superheater Coils And Air Preheater Tubes Are To Be Externally And Internally Cleaning Work.
External Cleaning Of Boiler Tubes In Co-Generation Power Plant
Gem Bids For Custom Bid For Services - Replacement Of All The Fire Tubes Of Boiler No Mp 4966 And Annual Overhauling Of 02 Nos Oil Fired Boilers Reg No Mp 4965 And Mp 4966 Capacity 12 Tph Each For Open Inspectiondry Test And Hydraulic Test As Per Indian Boiler ..
Overhaul Works On Boiler Pressure Parts For Replacement Of Eroded Water Wall, Dnp, Sh, Platen Sh Tubes, Carrying Out Cracked Fin Welding Where Ever Required During D Meter Survey, Cleaning And Clearing The Debris And Inspecting The Orifices Inside The Bottom Ring Header Of Boiler Of Unit-7/stage-iv/dr.nttps During Annual Overhaul Period 2025-26
Gem Bids For Custom Bid For Services - 200142193 Corrosion Mapping Of Boiler Water Wall Tubes Using Rfet At Ntpc Sipat
Gem Bids For Facility Management Services - Lumpsum Based - Industrial; Replacement Of Bed Coil Tubes Of Afbc Boiler At Reep; Consumables To Be Provided By Service Provider Inclusive In Contract Cost
Fabrication And Replacement Of Primary And Secondary Superheater Tubes With New Of Service Boiler Of Cpp.
Supply Of Boiler Tubes For 210 Mw Unit