Supply of Spares And Consumables Of Bomb Calorimeter Model 6100 Make Parr Instrument For Dstps Dvc Andal, 17 Thermistor 6100 6300 6400 Mfor Bomb Calorimeter Heat Wire 60 Inch L 2.0 Per Usefor Bomb Calorimeter Ignition Thread Lead Wire Ignition For Bomb Calorimeter Thermistor Bucket 6200 For Bomb Calorimeter
Custom Bid For Services - Supply and Installation of One (1) set of Filter Press Bomb Door as per Drawing at Beneficiation Plant.
Supply of Emu Bogie Frame For Bombardier Motor Coaches Phase-2 As Per Drawing No. Icf/Mrvc/M/Bt-0-3 -001. Warranty Period: 30 Months After The Date Of Delivery
Custom Bid For Services - Single Visit For Servicing Of Bomb Calorimeter C2000 With Chiller Installed At Area Coal Laboratory Piparwar Area
Supply of O Ring, Id 100Mm X Cs 7Mm, Make:- Bombay Oil Seal Company Bosco. Warranty Period: 30 Months After The Date Of Delivery
Supply of Notching Spring With Eyes Complete For Air Motor Of Tc-32To M/S Bombadi Er Part No.A 2215, Drg No.3 Eyc400037 R1. To Be Procured On Pac Basis From M/S Bombadi Er Nos. Warranty Period: 30 Months After The Date Of Delivery
Supply of Se Of Circlip For Air Motor Of Tc-32. One Set Consists Of A Circlip Part No.A 3207- 6 Nos B Circlip Part No.A 4514-1 No. C Circlip Imported Part No. A 1314.61-8 Nos One Set 3 Items 15 Nos. To Be Procured From M/S Bombardier Only On Pac Basis Set.
Supply Of Diet Items - Turmiric Powder, Bombay Rava, Wheat Rava, Pesara Pappu, Minapa Gullu, Ground Nuts, Putnalu, Pachi Sanaga Pappu, Mustards, Sai Minapappu, Black Pepper, Red Chillies Dry, Kandipappu, Tamarind, Chilli Powder, Salt Powder, Inguva 100 Grams, Sugar, Sunflower Oil, Sonamasoori Rice 26 Kg, Idli Ravva, Atta, Jaggery, Ragi Flour, Jonna Ravva, Vim Bars 250 Gms, Steel Scrubbers, Crystal Salt
Procurement Of Bomb Calorimeter For Coal Lab Of Pb-Nw Cmp Q3
Comprehensive Annual Maintenance Contract For 25Kv Ac Microprocessor Control Igbt Based 3-Phase Propulsion System And Equipment For Memu Rolling Stock Icf Memu And Beml Memu Rakes For Two Years Through Oem M/S Alstom Bombardier Transportation India Pvt. Ltd.
Supply Of Cleaning Material - Scented Phenyl Make Lizol, Floor Cleaner Make Lizol, Toilet Cleaner Make Harpic, Hand Wash Make Dettol, Good Quality Acid, Glass Cleaner Make Colin, Dish Wash Bar Make Vim, Detergent Bar Make Surf Excel, Detergent Powder Make Tide, Steel Scrubber Make Gala, Normal Scrubber Make Gala, Napthalene Balls , Garbage Bags L Make Pearl, Garbage Bags Xl Make Pearl, Rat Pad Make Hit , Aer Air/Room Freshner Make Godrej, Aer Power Pack Bathroom Freshner Make Godrej, Spin Mopping Kit Pocha Make Gala, Double Lip Floor Wiper Make Gala, Sink Wiper Make Gala, Toilet Brush Make Gala, Sink Brush Make Gala, Good Quality Coconut Broom, Bombay Broom , Good Quality Dusting Cloth , Good Quality Long Handle Hard Broom , Sky Broom Jala Broom, Pvc Bucket 15 Ltrs Make Chetan, Mug 1.5 Ltrs Make Chetan, Dustbin Large Size Make Chetan, Dustbin Small Make Chetan, Dust Pan Make Chetan, Hand Towels Make Bombay Dyeing, Mosquito Repellent Make Good Knight Express, Toilet Roll Make Premier, Non-Woven Kitchen Towels Make Origami
Supply of 50 Vipstrolly, Vipcabinbag, Bombaydyeingblanket Hawkinscooker, Laopaladinnerset
Supply of Selector Switch For 3 Phase Bombardier Bt Rake As Per Alstom Part No. Tc1007869900000. Mak E- Alstom Transport India Limited. Warranty Period: 30 Months After The Date Of Delivery
Supply of Hall Effect Speed Sensor, Btil Make Type 3 Eyp401277r0001 3 Pin + 5 Pin Coup Ler For Wag9 Igbt Based 3 Phase Locomotive Bombardier Maketm Type 6Fra 6068. W Arranty Period: 30 Months After The Date Of Delivery
Supply of Set Of Speed Sensor Item Suitable For Igbt Based Converter, Make Bombardier Transport, One Set Consist Of 1 Speed Sensor Assembly Of Bombardier Transport Id No. 3Ehm232327p0001 Qty-01 No. Ii Pgr 200 Teeth As Per Id No. 3Eyp400905p001 Qty-01 No. One Set Consists Of 02 Items In 02 Nos..
Supply of A Set Of High Pressure Hydraulic System-2800 Bar For Pinion Mounting And Extraction For Three Ph Ase Medhatme48-45-6 Type & Bombardier Mjc 280-1 Type Traction Motor As Per Attached Specification An D Special Condition. Warranty Period: 30 Months After The Date Of Delivery
Supply of Main Gear Machined As Per Bombardier Part No. 3Ejd000001-0785 For Bombardierwheel Set. Wa Rranty Period: 30 Months After The Date Of Delivery
Supply of Look Out Glass Made Of Silicone Hard Coated Poly Carbonate Sheet As Per Icf. Str No. Icf / M.D. Specification 159. Rev-1. Amendments Slip No. 3 Dt. 27.11.2020 Or Latest. As Per Drg. No: Icf /Mrvc/D/Bt- 9 - 0 - 033-Alt.A, Phase Ii For Bombardier Emu Rake Warranty Period: 30 Months After The Date Of Delivery
Supply Of Software For Bomb Calorimeter Instrument