Annual Maintenance Works Of Fire Hydrant, Mulsifier Systems And Air Lines And Overhaul Of Instrument Air Compressors, Air Drying Units, & Fire Hydrant Booster Pumps Of Stage-Iii As And When Required During The Year 2024-25.
Supply of 17 Cover Assy Clutch Cable Kilometer Head Brake Booster Assy Master Cyl Assy Horn Hyd Clutch Cable Assy Spark Plug Frt Brake Cable Solenoid Switch Relay Fd Coil Assy Pressure Plate Clutch Plate Bearing
Supply of Pump And Motor Assembly, Booster Pump 3/4 Hp 115 Volts Single Phase 9000 Rpm Including 2 Nos. Of 16 Awg Leads 3 Ft. Long To Emd Part No. 40030890, Dlw Part No. 1 6241526. Make New Kessler Engineering, /Progress Rail Innovations Private Limited/Hill Ton Electronics Kolkata /Top Grip Instruments Company-Kolkata Only. To Be Procured Fro M Oem/Authorized Dealer Of Oem Only. Warranty Period: 30 Months After The Date Of Delivery
Maintenance Of Equipment - Aluminum Checker Platefor Two Semi Trailer 5Mm, Aluminum Cheq Rebate, Air Suspension Bladdar, Diaphragm Assembly, Obsolete Suspension System 200Mm, Break Boosters, Pneumatic Valves, Palm Coupling, Hoses And Fittings, Tool Box, Spare Wheel Carriers, Lifting Ropes, Spare Wheel Rim, Pneumatic Brake And Suspension Line For Two Semi Trailer, Retro Reflective Sticker, Shelter Cabinet Twist Lock, Mounting Plate, Bushes, Bolts And Nuts, Air Tanks, Electrical Lines And Accessories For Two Semi Trailer, Tail Lamp Assembly, 7 Pin Sockets, Side Marking Lights, Air Compressor For Industrial Ac, Circuit Breaker Relay Contactor For Industrial Ac, Paint White, Paint Black, Silicon, Primer, Thinner, Cleaning Brush, Detergent, Grease, Painting Denting And Repair Charges, Cutting Welding, All Wheels Overhauling Axle Lack Greasing And Repairing, Fitment Of Air Suspension Systems, Maintenance Of Three Ac, Fitting Of Electrical Line, Any Other Costs Of Items Or Job
Supply of Ip Mpls Router Edge Router Fiber Aggregation L3 Switch Mar Distribution L2 Switch Mer In Line Amplifier Edfa Booster Firewall Optical Le Iad Voip Gateway 24 Ports Fxs Voip Gateway Video Phone Voip Phone
Supply Installation And Commissioning Of Water Water Pressure Booster Pump Isi Markminium Cap- 10 Hp, 7.5 Kw, 41 5 Volt 50 Hzrated Current 14.7 Ampapprox, Water Pressure 6Kg/Sqcm.As Per Specification Attached. Warranty Period: 30 Months After The Date Of Delivery
Supply, Installation, Testing, Commissioning Of 80W Led Floodlight Luminaire, Sitc Of 50W Rgbw Surface Mounted Medium Beam Square Projector, Supply, Installation, Testing, Commissioning Of 20W Rgbw Surface Mounted Narrow Beam Square Projector, Sitc Of Dmx Controller System, Sitc Of 4 Port Splitter Cum Booster, Supplying And Fixing 8 Way Dd Spn Mcb Db, Supply And Fixing Of Sp Mcb, Supply And Fixing Of Dp Mcb, Group C Point Wiring
Supply of LV7/HMV/8X8/AL/ P7809639 CLUTCH BOOSTER ASSY,LV7/TMB 3110-003190 BRG TAPERED ROLLER(IN REAR BRAKE DRUM HU,LV7/T-815 443-611-004-001 MAIN CYLINDER DIA 22.2,LV7/TMB 2641-2910-0117 CLUTCH MASTER CYLINDER (19.05 DIA),LV7/TMB 2654-2910-0157 MAJOR KIT SLAVE CYLINDER
Supply of Mt Item WATER PROOF STARTER, clutch cover,clutch booster,speedometer vdo turbo charger distributor head,pump assy fuel,disc clutch,cover assy clutch
Supply Of Piston Ring Set, Oil Cooler Gasket, Oil Filter Assy, Clutch Cyl Rep Kit, Pipe Injection, Cover Assy Rbl 353 Dia, Clutch Plate, Brake Booster, Air Comp Top Assy, Air Comp Valve Plate, Air Comp Gasket, Fuel Multistage Filter
Supply Of Clutch Plate, Air Drier, Air Filter Element Primary, Diaphragm Chamber Brake, Delivery Hose Canvas 38Mm X 30M With Mal, Canopy, Trailer Brake Valve, Pump Rotary Power Driven , Centrifugal Oil Filter Rho 2D 3929 , Brake Valve , Pump Assy, Clutch Booster Knorr Vg 3283
Electrical Work In Connection With Provision Of 1 Lakh Liter Capacity Ug Tank, Pump House Along With Electrical Booster, Sprinkler & Jockey Pump Including Pipe Line Network In Compliance Of Fire Audit Carried Out
Hiring Of Staff For Operation, Watch And Ward Of Booster Pumping Station At 1024 Ews House Sector-C Mayur Vihar Phase-Iii
Hiring Of Various Categories Manpower For Watch And Ward Of Booster Pumping Station At Lig Flats Mayur Vihar Phase-Iii
Hiring Of Staff For Operation, Watch And Ward Of Booster Pumping Station At 976 Sfs Flats Mayur Vihar Phase-Iii
Hiring Of Staff For Operation, Watch And Ward Of Booster Pumping Station At 480 Mig Flats Mayur Vihar Phase-Iii
Deployment Of Staff For Operation, Watch And Ward Of Booster Pumping Station At New Kondli
Maintaining Of Water Supply By Deployment Of Staff Operation, Watch And Ward Of Booster Pump Houses Of Hari Nagar Constituency Ac-28
Hiring Of Staff For Operation, Watch And Ward Of Booster Pumping Station At Mix Houses Kondli Gharoli Mayur Vihar Phase-Iii
Hiring Of Staff For Operation, Watch And Ward Of Booster Pumping Station At 1040 Ews House Sector-D Mayur Vihar Phase-Iii