Replacement Of Old Design Damaged Border Security Fence To New Design Fence At Various Locations In Punjab Sector Along Indo-Pakistan Border Length Of-134.561 Km. Sh: Replacement Of Old/Damaged Existing Border Security Fence With New Design Fencing At Various Locations Under The Aor Of Sector Length-44.225 Km And Gurdaspur Sector Length-21.225 Km In Engineering Procurement And Construction Epc Mode-Iii
Replacement Of Old Design Damaged Border Security Fence To New Design Fence At Various Locations In Punjab Sector Along Indo-Pakistan Border Length Of - 134.561 Km Sh:- Replacement Of Old/Damaged Existing Border Security Fence With New Design Fencing At Various Locations Under The Aor Of Sector Length - 36.410 Km And Abohar Sector Length - 32.701 Km In Engineering Procurement And Construction Epc Mode-Iii.
Conversion Of Border Security Fencing From Phase-Ii/Iii To New Design Fence In West Bengal Between Bp No. 243/Mp To 764/2-S Length - 210.028 Km. Sh: Between Bp No. 436/10-S To 742/9-S 36.19 Km Including Intermediate Bops, Riverine Structures Like Bridges, Culverts Including Gaps In Fences And Length Of Existing Old Fences Which Are Not In The Scope Of This Works Etc Along Indo-Bangladesh Border In The Of Uttar Darjeeling And Jalpaiguri Package-Ii In Epc Mode-Iii.
Conversion Of Border Security Fencing From Phase-Ii/Iii To New Design Fence In West Bengal Between Bp No. 243/Mp To 764/2-S Length - 210.028 Km. Sh: Between Bp No. 742/9-S To 764/2-S 35.03 Km Including Intermediate Bops, Riverine Structures Like Bridges, Culverts Including Gaps In The Fences And Length Of Existing Old Fences Which Are Not In The Scope Of This Work Etc. Along Indo-Bangladesh Border In The District Of Package-Iii In Epc Mode-Iii.
Conversion Of Border Security Fencing From Phase-Ii/Iii To New Design Fence In West Bengal Between Bp. No. 243/Mp To 764/2-S Length 210.028Km. Sh- In Various Stretches From Bp. No. 355/2-S To 357/1-S 4.725 Km 361/M To 365/M 6.2329 Km, 385/2-S To 385/5-S 0.800Km, Near Bp. No 399/8-R 0.030 Km, 401/6-S To 402/2-S 0.180 Km And 409/5-S To 417/8-S 15.383 Km Total Length 27.447 Km Including Intermediate Bops, Reverine Structures Like Bridges, Culverts, Including Gaps In Fences And Length Of Existing Old Fences Which Are Not In The Scope Of This Work Etc. Along Indo Bangladesh Border In The District Of Uttar Pakage-V In Epc Mode-Iii.
Conversion Of Border Security Fencing From Phase-Ii/Iii To New Design Fence In West Bengal Between Bp No. 243/Mp To 764/2-S Length 210.028 Km. Sh: Between Bp No. 290/Mp To 325/1-S Length-22.510 Km. Along Indo Bangladesh Border In The District Of Dakshin Package-Vii In Epc Mode-Iii
Conversion Of Border Security Fencing From Phase-Ii/Iii To New Design Fence In Between Bp No. 243/Mp To 764/2-S Length 210.028 Km. Sh: Between Bp No. 243/8-S To 290/Mp Length-24.88 Km. Along Indo-Bangladesh Border In District Of Dakshin Package-Vi In Epc Mode-Iii
Conversion Of Border Security Fencing From Phase-Ii/Iii To New Design Fence In Between Bp. No. 243/Mp To 764/2-S Length 210.028 Km Sh Between Bp. No. 328/4-S To 332/7-S And 347/2-S To 355/2-S 27.709 Km Including Intermediate Bops Reverine Structures Like Bridges, Culverts, Including Gaps In Fences And Length Of Existing Old Fences Which Are Not In The Scope Of This Work Etc Along Indo Bangladesh Border In The District Of Uttar Package-Iv In Epc Mode-Iii.
Conversion Of Border Security Fencing From Phase-Ii/Iii To New Design Fence In Between Bp No. 243/Mp To 764/2-S Length 210.028 Km. Sh: Between Bp No. 417/8-S To 436/10-S 36.26 Km Including Intermediate Bops Reverine Structures Like Bridges, Culverts Including Gaps In Fences And Length Of Existing Old Fences Which Are Not In The Scope Of This Work Etc. Along Indo-Bangladesh Border In The District Of Uttar Package - I In Epc Mode-Iii