Construction Of Fair Price Shop At Lukung Village - Excavation Earth Work Excavation Upto 12 Inch, Retaining Wall Providing And Laying Of Retaining Wall, Back Filling And Filling With Available Excavated Earth, Ppc Flooring Providing And Laying Concrete With 40Mm, Masonary Work In Super Structure Providing And Laying Cement Brick Masonry, Internal Plastering, External Plaster Providing And Applying, Putty And Base With Obd, Painting Providing And Applying Two Or More Coats, Roof Steel Structure With Gi Sheet, Flooring Cement Flooring With 1 4 Cement Sand Ratio With Smooth Finish, Doors Doors Of Size 7Ft X 3 Ft With Hardware, Windows Windows Of Size 5Ft X 4Ft With Accessories And Hardware, Electrical Fitting Providing And Fixing, Providing And Supply Tubelight, Curtain For Windows, False Ceiling Including Providing And Fixing, Development Of Stage, Iron Rack With Installation For Display, Toilet Hardware And Plumbing Work
Earth Work, Laying Plain Cement Concrete, 1St Class Brick Work With Bricks In Foundation, 1St Class Brick Work With Bricks In Superstructure, Supply And Fixing Tmt Bars Of 500D, 15 Mm Thick Cement Plaster, Neat Cement Punning, Reinforced Cement Concrete, Demolishing Pcc, Demolishing Rcc, Structural Steel, Filling Available Excavated Earth, Providing And Fixing Straight Shuttering, Supplying And Applying Two Coats Of General Purpose Synthetic Enamel, Snowcem Painting, White Washing, Finishing Walls Acrylic Emulsion, Providing And Laying Bitumen Mastic 25 Mm, Providing And Laying Bitumen Mastic 40 Mm
Supply, Installation And Termination Of 100 Pair Pijf 0 Point 5 Mm Armoured Telecom Cable, 50 Pair Pijf Ug Cable 0 Point 5Mm Armoured, 100 Plus 100 Pair Pillar Box Including 10 Pair Insulation Displacement Modules With Full Capacity, 100 Pair Jointing Kit, Route Marker And Joint Indicator, Digging And Back Filling Of Trench In Soil 3169 Meters, Digging In Tar Road Cutting Closing And Consolidation Of Trench 122 Meters, Laying Of Pijf Cable In Soil With Sand And Brick Protection 3500 Meters, Laying Of Pijf Cable In Culverts With Hdpe Pipes And Clamps 122 Meters, Laying Of Pijf Cable In Tar Road Cutting With 4 Inches Gi Pipe 87 Meters, Erection Of The Pillar Boxes 5 Nos, Erection Of The Route Markers And Joint Indicators 40 Nos