Rebuilding Of Major Bridge No.46 7X12.2 M-Psc Slab Between Gularbhoj-Bazpur Station Of Lalkuan-Kashipur Section
Ukai Songhad- Jalgaon - Section. Rep. Of Corroded Steel Girders By Precast Rcc/Psc Slab At Br. No.292 Total 3 Spans In Connection With Sanctioned Works Of Churchgate -Jalgaon Section Total 11 Nos Bridges.
Signaling Work In Connection With 1 Ukai Songadh-Jalgaon Section- Replacement Of Stone Slab Bridges By Providing Box Culverts .Total 21 Nos 2Churchgate-Jalgaon Sec. Repl. Of Corroded Steel Girders By Precast Rcc/Psc Slab On Bridges Total Bridge 11 Nos. & Span 50Nos.
Special Repairs Of Foot Over Bridge Especially Foot Steps, Deck Slabs, Protection Jali Etc. And Others
Proposed Renewal Of Existing Culverts With Rail / Joist & Slab, Stone Slabs With Rcc Box - 8 Bridges . Qln - Tvc Section
Replacement Of Steel Girder Of Bridge Of Br.No. 61-A 2X3.66M At Km 16/13-14 With Psc Slab Between Ngwn-Nmda On Sir-Dlpc Section Under Aden/Sir. Ii Strengthening Of Return Walls Of Bridge No. 322-A And Jacketing Of Piers Of Bridge No. 385 On Umb-Ldh Section Under Aden/Rpj.
Construction Of Road Over Bridge 3 Lane With Bridge Proper 1X30m Composite Girder + 1X60m Bow String Girder + 1X30m Composite Girder And Bridge Approaches 17X24.6M Psc Girder + 3X20.6M Psc Girder At Km: 15/22-24 In Lieu Of Lc No. 13 Between Andul- Sankrail Station And Construction Of Road Over Bridge 2 Lane With Bridge Proper 1X18m Composite Girder + 1X60m Bow String Girder + 1X36m Composite Girder And Bridge Approaches 18X25.36M Psc Girder + 2X10.0M Rcc Slab At Km: 23/17-19 In Lieu Of L.C No. 18 Between Nalpur-Bauria Stations Of Howrah
Balance Work Of Replacement Of Steel Girder Bridges 15 Bridges; Phase-Iii, Replacement Of Steel Girder With Rcc Slab At Br No-350Up Span-5X6.10M
Replacement Of Steel Girder With Psc Slab For Bridge No. 490 1X12.20M At Km 29/800-900 Between Rajanukunte And Dodballapur Stations Of Baiyappanahalli - Dharmavaram Section. Sw-Ii: Replacement Of Steel Girder With Psc Slabs Of Size Above 9.15M And Up To 12.20M Span Bridges For Bridge No. 448 At Km 8/398 Between Nayandahalli Nyh - Jnana Bharati Halt Gnb Stations Of Bengaluru - Mysuru Section. Maintenance Period Is 6 Months Or One Monsoon Period Whichever Is Later.
Replacement Of Existing 5X9.15M Girders With 25T Axle Loading Standard Psc Slabs For Bridge No.413A At Km 108/7-8 Between Kcd - Dkd Stations
Scr Construction Organization: Engineering Procurement And Construction Epc Contract In Connection With Proposed Doubling Of Mahbubnagar - Dhone Section Proposed Construction Of Important Bridges I Bridge No.353 Over Mareddypalli Vagu At Ch.165379.00M With 15X12.20M Clear Span Psc Slab, Ii Bridge No.375 Over Okachetty Vagu At Ch.173523.00M With 21X12.20M Clear Span Psc Slab And Iii Bridge No.398 Over Krishna River At Ch.182034.0M With 34X24.40M Clear Span Psc Box Girder Iv Bridge No.442 Over Tungabhadra River At Ch.241415.82M With 45X18.30M Clear Span Psc U- Girder And V Bridge No.450 Over Handrineeva River At Ch.244347.30 M With 14X12.20M Clear Span Psc Slab Including Earthwork On Approaches Of The Bridges, Bridge Protective Works And Other Miscellaneous Works In In The State Of Telangana.