Cable Harness Tenders

(Select any tender from the list to send an email)
Ref. No #31642234 Central Government/Public Sector Live   GeM Tender

Supply of Automatic Tester With Camc For 3 Years Q3

Location
Maharashtra
Due Date
29 Apr, 2024
Amount
Refer Document
Ref. No #31609994 Central Government/Public Sector Live   GeM Tender

Supply Of Ste Mode On Hvf - Lv1 R72 Pg-01-15Sb Power Cylinder, Lv1 R72 172-36- 001Sb-1 Pre-Heater, Lv1 R72 172-65-107 Bolt, Lv1 R72 5315720071512 Contact Drg No 432-23-214, Lv1 R72 5310252153 Washer Drg No 172-11-104, Lv1 R72 Gost7798-70 37 Bolt M10-6Gx25.46.016, Lv1 R72 Etu 500 6- 1000095 Bearing 6-1000095, Lv1 R72 5365182300 Plug Drg No 434-03-132, Lv1 R72 176.65.021 Strip, Lv1 R72 Gost 23360-78 Key 4X4x8, Z6 R72 4720-014858 Hose Assy Bk6-450-241, Z6 R72 2A46-Sb-10-19 Roh-1223 Connector Unit, Z6 R72 3120-105470 Bushing Sleeve 172-74-329-3, Z6 R72 Misc-175-70-115Sb Roh 88 Bracket, Z6 R72 6150-006388 Cam Control 172-74-414, Z6 R72 Bk-2-968-097 Replenishing Tank Traverse, Z6 R72 1430-000053 Control Indicator P11-5, Z6 R72 Rus-T-72-Oyuo-360-058Tu Micro Switch P1m10-2V, Z6 R72 5995-72-033-9523 Wiring Branched 172- 70-055Sb-1, Z6 R72 5995720339532 Wiring Branched Assy No10, Z6 R72 3010-000413 Actuator Electro Mech Linear Gun Lock, Z6 R72 6110-72-004-4759 Regulator Voltage P10-Tmy-1S-000, Z6 R72 5995-003130 Wiring Branched Assy No.20, Y3 R72 5970-000057 Tape Insulating, X2 R72 Misc -H10-481-017 Fuse Pm 2A, X5 R72 Pz 27V 200W Lamp Bulb, Z6 R72 5995-003128 Wiring Branched Assy No 1, Z1 R72 5945-001439 Relay Armature24v18a Mitsuba Type Braket, Z6 R72 5970- 042944 Tape Insulating Electrical Gost-16214-70, X5 R72 6240-001209 3 Lamp Filament 28V 5W Scc Clear, X2 R72 Vpi-1-0.5A Fuse Link Vp1-1-0.5A, Y3 R72 6145- 000564 Braid Tinned Copper 6.5 Mm Wide, Z1 R72 Misc2020-090-4570 Cg-1127 0.11M Rf , Z1 R72 Misc2020-09249-90 Cx-8120 S 1.5M Power , X2 R72 Gao-364-126Tu Roh-861 Socket 2 Rm 24B 19 Givi W3, Z1 R72 Misc-Tadiran-2051-90710-00 Ant Base Mx-6808 A

Location
Maharashtra
Due Date
29 Apr, 2024
Amount
Refer Document
Ref. No #31584680 Central Government/Public Sector Live

Supply of Of Underframe And Roof Arrangeme For Power Car. For Lhb Ac 3 Tier Type Coaches, As Per Drawing: Edts253, Rev-J, Corr-1, 2, 3, 4, 5, 6, 7& 8., Packing Instruction: : Complete One Coach Set To Be Protected With Biodegradable Transparent Polythene Sheet And Packed In A Wo Oden Box. Soft Eco-Friendly Packing Material Hay, Straw, Etc Be Provided Inside The Wooden Box To Protect Any Damage To Insulation While Packing/Unpacking.Bo Ttom Frame To Be Made Of Wooden Planks 20Mm Thick & Should Have Support Of Atlea St 3 Wooden Battons Of Size 100X100mm Of Suitable Length To Facilitate Lifting By For K Lifter. Rigid Pvc Conduit Supplied Loose Along With Should Be Packed As P Er Instructions .The Material Used For Product Packaging Shall Be Eco-Friendly.A Li St Should Be Pasted On Each Packing Showing Order No, Pl No, Description Of The Ite M, Drg.No/Spec.No, Qty, Firms Name &Address And Date Of Despatch Etc. Warranty Peri Od: 30 Months After The Date Of Delivery Of Underframe And Roof Arrangement For Lhb Power Car Type C Oaches, As Per Drawing: Edts257, Rev-K, Corr-1, 2, 3, 4, 5, &6, Packing Instruction: : Co Mplete One Coach Set To Be Protected With Biodegradable Transpar Ent Polythene Sheet And Packed In A Wooden Box. Soft Eco-Friendly Packing Materia L Hay, Straw, Etc Be Provided Inside The Wooden Box To Protect Any Damage To Insulation While Packing/Unpacking.Bottom Frame To Be Made Of Wooden Planks 20M M Thick & Should Have Support Of Atleast 3 Wooden Battons Of Size 100X100mm Of Sui Table Length To Facilitate Lifting By Fork Lifter. Rigid Pvc Conduit Supplied Loose Al Ong With Should Be Packed As Per Instructions .The Material Used For Pro Duct Packaging Shall Be Eco-Friendly.A List Should Be Pasted On Each Packing Showi Ng Order No, Pl No, Description Of The Item, Drg.No/Spec.No, Qty, Firms Name &Addre Ss And Date Of Despatch Etc. Warranty Period: 30 Months After The Date Of Delivery For Hog Compliant Lhb Eog High Capacity Parcel Van Coaches., As Per Drawing: Edts406, Rev-Nil, Am-2, Corr-1&2, Packing Instruction: : Complete One Co Ach Set To Be Protected With Biodegradable Transparent Polythene Sheet And Packed In A Wooden Box. Soft Eco-Friendly Packing Material Hay, Straw, Et C Be Provided Inside The Wooden Box To Protect Any Damage To Insulation Whi Le Packing/Unpacking.Bottom Frame To Be Made Of Wooden Planks 20Mm Thick & Shou Ld Have Support Of Atleast 3 Wooden Battons Of Size 100X100mm Of Suitable Length T O Facilitate Lifting By Fork Lifter. Rigid Pvc Conduit Supplied Loose Along With Harn Ess Should Be Packed As Per Instructions .The Material Used For Product Packagin G Shall Be Eco-Friendly.A List Should Be Pasted On Each Packing Showing Order No, Pl No, Description Of The Item, Drg.No/Spec.No, Qty, Firms Name &Address And Date O F Despatch Etc. Warranty Period: 30 Months After The Date Of Delivery For Hog Compliant Lhb Eog Non Ac Lslrd31 Seater Coaches., As Pe R Drawing: Edts410, Rev-0, Corr-1 With Am-1, 2., Packing Instruction: : Complete One Coach Set To Be Protected With Biodegradable Transparent Polythe Ne Sheet And Packed In A Wooden Box. Soft Eco-Friendly Packing Material Hay, Straw, Etc Be Provided Inside The Wooden Box To Protect Any Damage To Insulation W Hile Packing/Unpacking.Bottom Frame To Be Made Of Wooden Planks 20Mm Thick & Sho Uld Have Support Of Atleast 3 Wooden Battons Of Size 100X100mm Of Suitable Length To Facilitate Lifting By Fork Lifter. Rigid Pvc Conduit Supplied Loose Along With Harn Ess Should Be Packed As Per Instructions .The Material Used For Product Packagin G Shall Be Eco-Friendly.A List Should Be Pasted On Each Packing Showing Order No, Pl No, Description Of The Item, Drg.No/Spec.No, Qty, Firms Name &Address And Date O F Despatch Etc. Warranty Period: 30 Months After The Date Of Delivery

Location
Punjab
Due Date
01 May, 2024
Amount
Refer Document