Providing Consultancy Services For Third Party Inspection & Quality Assurance For The Work Of Dadhal Char Rasta Road K.M. 0/0 To 10/080 Cc Road, Tal. Ankleshwar
Providing Consultancy Service For Third Party Inspection & Quality Assurance For The Work Of Ankleshwar Rajpipla Road K.M. 1/500 To 4/260 And 5/650 To 5/950 Cc Road, Ta. Ankleshwar,
Strengthening Of Bhavnagar Koliyak Hathab Sosiya Road Km 8/ To 46/780, Dist. Bhavnagar Resurfacing Profile Correction, Cc Road, Road Furniture & Misc. Road Work In Chainage Km 14/600 To 33/800.
Temporary Electrical Works Of Dc And Cc Vanue At Indas High School In Connection With 18Th Parliamentary General Election 2024, 257 Sc Indas A.C
Maintenance And Repairs To Sanitary Lines, Drains Including Re-Construction Of Damaged Drains At Rk-5 Colony, Teachers Colony, Ccc Township For The Year 2024-25 In Srirampur Area, Mancherial Dist, T.S. Invited Under Earmarked Work - Sccl Registered Contractors Belonging To Sc Community Only Are Eligible To Participate
Replacing The Faded Glass Panels And Its Corroded Frames Surrounding The Capsule Lift And Laying Gi Pipe For Cctv Network And Connected Works General High Court
Supply of Led Driver 9W Suitable To Work Led Light Fitting Type-N, M, D, K And Type-B1 Of Lhb Ac Coaches And Non-Ac Coaches Confirming To Rdso Specification No. Rdso/Pe/Spec/Tl/0091-2016 Rev-1 And As Per Rc F Drawing No. Lw76099, Lw76071, Lw76092, Icf/Std-7-6048 & Cc 76453. Warranty Period: 30 Months Afte R The Date Of Delivery
Work Of Comprehensive Annual Maintenance Contract Camc For Cctv In Lhb Ac Coaches Maintained At Lokmanya Tilak Terminus Coaching Depot Of Central Railway For A Period Of One Year.
Renovation Works Of Dc And Cc Vanue At Indas High School In Connection With 18Th Parliamentary General Election 2024, 257 Sc Indas A.C
Rate Contract For Work Of Servicing, Calibration And Maintenance Of Weather Monitoring Station Wm 271 At Ccpp On As And When Required Basis For The Year 2023 And 2024
Maintenance Contract For Works Of Complete Servicing / Overhauling / Attending Fault / Repairing / Checking Of Various Types Of Hoists And Cranes Of Ccpp # 1, 2 & 3 At Dgbps On As And When Required Basis For 11 Month.
Setting Up The Cctv Control Room At 8Th Floor Of Main Building- Drawing Electrical Main Cables To Ups Room And From Ups Room To Cctv Monitoring Room.-General Electrical Work
Work Of Atmospheric Blow Down Tank, Hrsg Safety Valve Cws, Gt Air Intake Filter House Drain Line Bellow, Fabrication & Installation Of Pump Base Frame & Arv Of Ccpp-Iii, Dhuvaran.
Work Of Restoration, Overhauling, Servicing & Re Strengthening Air Washery System Of Gt Building & 6.6 Kv Of Ccpp Iii, Dhuvaran.
Signalling Work In Connection With Tsrp 62.700 Tkm M/L 10.130 Tkm And Suburban 52.57 Tkm.In Ccg-Vr Section Of Mumbai Division, Western Railway. 2.Signalling Work In Connection With Ctrs/P 11.224Tkm And Trrs 5.020Tkm In Ccg-Vr Section Of Mumbai Division, Western Railway. 3.Signalling Work In Connection With Churchgate-Virar - Trr P 0.392 Kms On Br. No. 75 On Dn Th Line Of Mumbai Division, Western Railway. 4. Signalling Work In Connection With Churchgate-Virar - Trr P 1.438 Kms On Br. No. 73 On Dn Th Line.
Balance Work For Cctv Camera-Balance Work For Cctv Monitoring Hall And Plug Point To Cctv Camera At High Court Complex And Ram Mohan Palace In Connection With Security. -General Electrical Work
Signalling Work In Connection With 1. Tbrp&Cs - 136 Sets 1:12 - 113 Sets & 1:8.5 - 23 Sets & Sejs - 63 Sets 2. Providing 6 M Wide Fob Between Bvi-Dic At Km 35/1003-11004 To Prevent Trespassing Through Railway Track. In Ccg-Vr Section
Rnx:Upgradation Of Goods Yard Facilities Like Cctv, Lighting Arrangement, Circulating Area Development And Drainage Along With Other Ancillary Works
Supply Of Thermal Insulation, Metal False Ceiling, Epoxy Flooring, 75 Mm Height Epoxy Coving, Expansion Joint By Rasin And Hardener, Earth Work In Excavation, Pcc 1 4 8, Rcc 1 1 5 3, Mild Steel Tmt Bar Fe 500 D Or More, Demolishing Cement Concrete Work Manually Or Mechanical Means, Demolishing Brick Work Manually Or Mechanical Means, Structural Steel Work Riverted Bolted Or Welded Detail Specification As Per Annexure A, Synthetic Enamel Paint, Precoated Galvanised Iron Profile Sheet Point Five Mm Thick, Precoated Galvanised Steel Profile Sheet Point Five Mm Thick Gutter 600 Mm Over All Grith, Plinth Protection 50 Mm Cc 1 3 6 And 75 Mm Thick Lean Concrete Detail Specification As Per Annexure A, Dismantling Of Old Plaster Detail Specification As Per Annexure A, 12 Mm Thick Cement Plaster 1 Is To 4 Detail Specification As Per Annexure A, Removing Dry Or Oil Bound Distemper Detail Specification As Per Annexure A, Pointing Work Detail Specification As Per Annexure A, Acrylic Smooth Exterior Paint Old Work Detail Specification As Per Annexure A, White Cement Based Putty Detail Specification As Per Annexure A, Distempering With 1St Quality Acrylic Detail Specification As Per Annexure A, 150 Mm Rain Water Pvc Pipe Detail Specification As Per Annexure A, Aluminium Partition Fixed Portion Powder Coated Aluminium Detail Specification As Per Annexure A, Aluminium Door Window Powder Coated Aluminium Detail Specification As Per Annexure A, Manual Sliding Device With Rail And Wheel Detail Specification As Per Annexure A, Aluminium Door Fitting 200 Mm Long Door Handle Detail Specification As Per Annexure A, Godrej And Equivalent Lock Detail Specification As Per Annexure A, Aluminium Door Fitting Tower Bolt 300X10 Mm Detail Specification As Per Annexure A, Glazing 8 Mm Thick Plain Glass With Epdm Rubber Detail Specification As Per Annexure A, 12 Mm Thick Prelaminated Partical Board Detail Specification As Per Annexure A, Making Joint Free And Hole By Butyl Adhesive Tape Detail Specification As Per Annexure A, Led 36 Watts Input False Light Of 600 X600 Mm Light And Wiring Detail Specification As Per Annexure A, Fixing Acp Curtain Wall For Duct And False Ceiling With Base Frame Detail Specification As Per Annexure A, 50 Mm Thick Sandwich Puf Panel With Both Point Five Mm Thick Sheet Both,
Annual Maintenance Contract Of Cci Private Railway Siding At Bokajan Cement Factory For 2Plus 1 Years As Per The Scope Of Work Detailed In The Tender Amc Of Railway Siding