Construction Of Fair Price Shop At Lukung Village - Excavation Earth Work Excavation Upto 12 Inch, Retaining Wall Providing And Laying Of Retaining Wall, Back Filling And Filling With Available Excavated Earth, Ppc Flooring Providing And Laying Concrete With 40Mm, Masonary Work In Super Structure Providing And Laying Cement Brick Masonry, Internal Plastering, External Plaster Providing And Applying, Putty And Base With Obd, Painting Providing And Applying Two Or More Coats, Roof Steel Structure With Gi Sheet, Flooring Cement Flooring With 1 4 Cement Sand Ratio With Smooth Finish, Doors Doors Of Size 7Ft X 3 Ft With Hardware, Windows Windows Of Size 5Ft X 4Ft With Accessories And Hardware, Electrical Fitting Providing And Fixing, Providing And Supply Tubelight, Curtain For Windows, False Ceiling Including Providing And Fixing, Development Of Stage, Iron Rack With Installation For Display, Toilet Hardware And Plumbing Work
Earth Work In Excavation Exceeding 30Cm In Depth 1.5 Mtr. In Width Or 10 Sq.M. On Plan By Mech/Manual Means Including Dressing Of Sides And Ramming Of Bottoms, Lift Upto 1.5 Mtr Including Getting Out The Excavated Soil And Disposal Of Surplus Excavated Soil As Directed, Within A Lead Of 50 Mtr. All Kinds Of Soil, Cleaning Jungle Including Uprooting Of Rank Vegetation, Grass, Brush Wood, Trees And Sapling Of Girth Upto 30Cm. Measured At A Height Of 1 M Above Ground Level And Removal Of Rubbish Upto A Distance Of 2Km Out Side The Periphery Of The Area Cleared By Your Own Vehicle. Providing And Laying In Position Plain Cement Concrete 1- 3 - 6 1 Cement - 3 Coarse - 6 Graded Stone Aggregates 20 Mm Nominal Size Excluding The Cost Of Centering, Shuttering In Foundation, Footings, And Bases Of Column As Per Specifications And Drawings And Direction Of Engineer In Charge, B Suspended Floors, Roofs, Landings, Balconies, Shelves Etc.
Providing Laying Of Wbm Including Construction Of Cement Concrete Drain On Fci Godown Mir Bazar
Earth Work, Laying Plain Cement Concrete, 1St Class Brick Work With Bricks In Foundation, 1St Class Brick Work With Bricks In Superstructure, Supply And Fixing Tmt Bars Of 500D, 15 Mm Thick Cement Plaster, Neat Cement Punning, Reinforced Cement Concrete, Demolishing Pcc, Demolishing Rcc, Structural Steel, Filling Available Excavated Earth, Providing And Fixing Straight Shuttering, Supplying And Applying Two Coats Of General Purpose Synthetic Enamel, Snowcem Painting, White Washing, Finishing Walls Acrylic Emulsion, Providing And Laying Bitumen Mastic 25 Mm, Providing And Laying Bitumen Mastic 40 Mm