Supply of Pcb Japs Make Panel Main Pcb With Small Pcb And 15 Pin 25 Pin Connectors 60 Amps Suitable For Japs Make Auto Changeover Panel Warranty Period: 30 Months After Th E Date Of Delivery
Supply of Cls Panel 60 A Mp Capacity Control And Distribution Panel Automatic With Three Source Supply S Ystem For Colour Light Signaling Confirming To Rdso Specification No: Ti/Spc/Psi/Cls/0020 And Rdso Drg No: Eti/Psi/035.2 With The Following Additional Requirements.1. The Power Wiring Shall Have Facility To Switch Both Pha Se And Neutral Of All The Three Sources Such That Only The Phase And Neutral Of The Sources Selector For The Time B Eing Auto/Manual Gets Either Of The Following Configuration A.Provision Shall Be Made To Change The Priority Of E Ach Source By The User Through A Selector Switch Or B. The Source Selector For The Time Being Shall Continue In Se Rvice Unit A Changeover Is Necessitated Due Failure Of Voltage Limit Violation Abnormal Fluctuation Of That Source. Make: Japs, Suntron, Systems & Services Pc Supreme. Warranty Period: 30 Months After The Date Of Delive Ry
Shifting Of Existing Dg, Restoration Servicing Commissioning Of 20 15 Kva Dg Set, Shifting Of Existing 15 Kva Avr, Installation Testing And Commissioning Of 15 Kva 3 Phase 415 Volts Automatic Voltage Stabilizer, Installation Testing And Commissioning Of Bye Pass Cum Lt Panel, Supplying And Fixing 88 Ah Capacity Dg Starting Battery For Base Sanjy 2024 Sites, Shifting Of Dg Parts Of 10 Kva Water Cooled Silent Type Dg Set From Sheesh Mahal To Sanjy 2024 Bts Site Holy Cave, Shifting Of Dg Parts Of 10 Kva Water Cooled Silent Type Dg Set From Panjtarni To Sanjy 2024 Bts Site Sangam, Restoration Servicing Commissioning Of 10 15 Kva Dg Set Installed At Sh Amarnathji Yatra Upper Sites, Supplying And Fixing 88 Ah Capacity Dg Starting Battery For Upper Sanjy 2024 Sites, Supplying And Laying Of 2 Core 10 Sq Mm Pvc Insulated Pvc Sheathed Unarmoured Copper Conductor Cable, Supplying And Fixing Of 63 A Double Pole Side Handle Type On Load Type Change Over Switch, Supplying And Fixing Of Pendent Holder, Supplying And Fixing Of Power Strip Of 6 Amp Rating, S F Of 40 Amp Rating Mcb Type Double Pole Changeover Switch, Replacement Of Faulty 3 Pole Power Contactor, Providing Labour Charges For Repairs Top Overhauling To Faulty Diesel Engine Of 10 15 20 Kva Dea Set, Replacement Of Piston Ring Set For One Piston Required In Major Overhauling Top Overhauling Of 10 15 20 Kva Dg Sets Complete As Required At Sites, Replacement Of Piston Pin, Replacement Of Sleeve Cylinder, Replacement Of Gasket Cylinder Head, Replacement Of O Ring Sleeve Cylinder, Replacement Of Hose Outlet, Replacement Of Hose Inlet, Replacement Of Damaged Faulty Battery Charger, Replacement Of Faulty Stop Solenoid, Repairing Of Defective And Stuck Injector, Repairing And Servicing Of Defective And Stuck Fuel Pump, Repairing Of Defective Self Starter Motor, Repairing Of Defective Charging Alternator Dynamo, Replacement Of Defective Avr Of Alternator, Replacement Of Defective Coupling, Replacement Of Defective Moulded Rectifier In The Excitation Circuit, Supplying Filling Topping Up Of Transformer Oil, Replacement Of Damaged Faulty Burnt Servo Motor 3 Kg Cm, Replacement Of Damaged Faulty Burnt Control Card Of The Avr, Replacement Of Damaged Faulty Burnt Dimmer Coil 60 A, Replacement Of Damaged Faulty Burnt Buck Boost Transformer 5 Kva Rating, Supplying And Laying Of 3 5 X 25 Sq Mm, Round The Clock Operation And Comprehensive Maintenance Rangamore
Supply, Installation And Commissioning Of Universal Fail Safe Block Instr Ument Ufsbi For Single Line Operation As Per Rdso Spn No Irs: S-105/2012 With Latest Ver & Amdt. Each Set Consisting Of Following: Universal Fail Safe Block Inter Face F Or Single Line As Per Rdso Spn No Irs:S 104/2012 With Latest Version And Amendement. I T Shall Comprise Of Auto Change Over Facility For Quad And Ofc Working. Necessar Y Modem For Quad And Ofc Should Be Supplied Along With Auto Changeover Arrang Ement. Qnty-02 Nos Block Panel Complete With All Accessories As Per Rdso Drg No R Dso/S/32019 With Latest Amdt. Qty-02 Nos Relay Rack With Dual Locking And Sealing Arr Angement As Per Rdso Drg No Rdso/S/32020 In Ncluding Relays For Each Relay Rack Qni-22 Nos, Qnai-06 Nos, Qli-02 Nos, And Timer-01 Nos. Qty-02 Nos Block Telephone With Ac Cessories As Per Rdso Spn Rdso/Spn/191/2006The Block Phone Should Work Without A Ny Interruption After Auto Changeover. Qty-02 Nos. Supply Of Reliability Improveme Nt Kit Suitable To Work With Ufsbi As Per Rdso/Spn/147/2005 Or Latest. It Comprise Iau Tomatic Media Changeover Of Modems Working On Redundant Channels For Data Tr Ansmission On Ofc/Quad /Microwave Radioany Two Media- 01 Pair Ii Secondary Mode M For Ufsbi For Use With Secondary Media Ofc/Quad -01 Pair Iii Type C & D Power Line Vf24ac/Dc-02 No, V20c/3Ph 150 V -02 Nos & Data Line Spd 4 Pm 4D/5T-02 Nos Suitable To Wo Rk With One Pair Ufsbi -01 Set Iv Power Moniter & Soft Start Unit Pmss- 01 Pair. Including Installation And Commissioning. Bidder Has To Submit The Supply And Installation Charges Separately . Inspection B Y Rdso Warranty Period: 30 Months After The Date Of Delivery Supply, Installation, Transportation & Commissioning Of Complete Set Of Block Proving By Axle Count Er Bpac Using Block Panel And Ufsbi For Double Line Operation As Per Rdso Specification No. Irs:S-105/20 12, Ver-0 Or Letest. Each Set Consists Of A Universal Fail Safe Block Interface Complete With All Accessories A S Per Rdso Spec.No. Irs-S-104/2012 Ver.0 2Nos. B Block Panel Complete With All Accessories As Per Rds O Drawing No. Rdso/S/32017 2Nos. C Wired Relay Rack With Due Locking And Sealing Arrangements Consisting Of Rdso Approved & Pre Inspected Ufsbi And Rdso Approved & Pre Inspected Relays With Bases As Per Rds O Drawing No. Rdso/S/32018 02Nos. D Block Telephone With All Accessories As Per Rdso Spec. No. Rdso/ Spn/191/2006 2Nos. E Universal Fail Safe Interface 02Nos. F Modems & Auto Media Changeover. Warrant Y Period: 30 Months After The Date Of Delivery Supply, Installation, Transportation & Commissioning Of Complete Set Of Block Proving By Axle Cou Nter Bpac Using Block Panel And Ufsbi For Double Line Operation As Per Rdso Specification No.Irs:S-105/2 012, Ver - 0 Or Latest. Each Set Consists Of A Universal Fail Safe Block Interface Complete With All Accessories As Per Rdso Spec. No.Irs-S-104/2012 Ver.0 2Nos. B Block Panel Complete With All Accessories As Per Rd So Drawing No. Rdso/S/32017 2 Nos. C Wired Relay Rack With Due Locking And Sealing Arrangements Consis Ting Of Rdso Approved & Pre- Inspected Ufsbi And Rdso Approved & Pre- Inspected Relays With Bases As Per Rdso Drawing No.Rdso/S/32018 2 Nos. D Block Telephone With All Accessories As Per Rdso Specn. No. Rdso/Spn/191/2006 2 Nos. E Universal Fail Safe Block Interface 2 Nos. F Modems And Automatic Media Changeover. Warranty Period: 30 Months After The Date Of Delivery Supply, Installation And Commissioning Of Universal Fail Safe Block Interface As Per Rdso Specifi Cation No. Irs:S-104/2012 Ver.0 With Latest Amendment Suitable To Work On Ofc/1 Quad Cable As 16 Input-16 O Utput Multiplexer For Ib Signalling Including 68 Nos. Of Qn18f/8B Relay For System Commissioning. System Sho Uld Consist Of One Ofc Channel Modem And One Quad Channel Modem With Auto-Changeover Facility. Warranty Period: 30 Months After The Date Of Delivery Supply, Installation And Commissioning Of Complete Set Of Block Proving Axle Counter Bpac Using Ufsbi For Double Line As Per Irs:S-105/2012, Ver-0 Or Latest Consists Of A Block Panel As Per Rdso Drawing No. Rdso/S/32017 2Nos.B Wired Relay Rack Consisting Of Rdso Approved & Pre-Inspected Ufsbi And Rdso Approved & Pre Inspected Relays With Bases As Per Rdso Drawing No. Rdso/S/32018 2Nos.C Block Telephon E As Per Rdso Drawing No. Rdso/Spn/191/2006 2Nos.Duniversal Fail Safe Block Interface 2Nos.Eunivers Al Fail Safe Block Interface 2Nos. Warranty Period: 30 Months After The Date Of Delivery Supply Installation And Commissioning Of Complete Set Of Bpac Using Ufsbi For Single Line As Per Rdso Spec No. Irs.S-105/2012 Or Latest Along With Automatic Media Change Over. Warranty Period: 30 Mont Hs After The Date Of Delivery Supply, Installation, Transportation & Commissioning Of Complete Set Of Block Proving By Axle Cou Nter Bpac Using Block Panel And Ufsbi For Double Line Operation As Per Rdso Specification No.Irs:S-105/2 012, Ver - 0 Or Latest. Each Set Consists Of A Universal Fail Safe Block Interface Complete With All Accessories As Per Rdso Spec. No.Irs-S-104/2012 Ver.0 2Nos. B Block Panel Complete With All Accessories As Per Rd So Drawing No. Rdso/S/32017 2 Nos. C Wired Relay Rack With Due Locking And Sealing Arrangements Consis Ting Of Rdso Approved & Pre- Inspected Ufsbi And Rdso Approved & Pre- Inspected Relays With Bases As Per Rdso Drawing No.Rdso/S/32018 2 Nos. D Block Telephone With All Accessories As Per Rdso Specn. No. Rdso/Spn/191/2006 2 Nos. E Universal Fail Safe Block Interface 2 Nos. F Modems And Automatic Media Changeover. Warranty Period: 30 Months After The Date Of Delivery Supply Of Block Proving By Axle Counter Bpac Using Ufsbi For Single Line Operation Comple Te With All Accessories And From Sr. 1 I To 1 Iv All As Per Rdso Specification No.Irs:S- 105/2012 Ver-0 I Uni Versal Fall Safe Block Interface Ufsbi With Complete Accessories As Per Rdso Specn.No.Irs:S-104/2012 Ii Block Panel As Per Rdso S- 32019 Iii Relay Rack With Locking And Sealing Arrangement Duly Wired As Per Rd So /S/ 32020 Along With Complete Relays. Iv Block Telephone With Accessories As Per Rdso Drg. No.Rdso/ Spn/191/2005. 2 Supply Of Automatic Media Changeover Along With Additional Modem As Per Manufacturers Sp Ecification For Bpac Using Ufsbi In Item 1. One Set Consisting Of All Items Required To Commission One Block Se Ction Except Ssdacs Warranty Period: 30 Months After The Date Of Delivery Supply Of Block Proving By Axle Counter Bpac Using Ufsbi For Single Line Operation Comple Te With All Accessories And From Sr. 1 I To 1 Iv All As Per Rdso Specification No.Irs:S- 105/2012 Ver-0 I Uni Versal Fall Safe Block Interface Ufsbi With Complete Accessories As Per Rdso Specn.No.Irs:S-104/2012 Ii Block Panel As Per Rdso S- 32019 Iii Relay Rack With Locking And Sealing Arrangement Duly Wired As Per Rd So : S: 32020 Along With Complete Relays. Iv Block Telephone With Accessories As Per Rdso Drg. No.Rdso/ Spn/191/2005. 2 Supply Of Automatic Media Changeover Along With Additional Modem As Per Manufacturers Sp Ecification For Bpac Using Ufsbi In Item 1. One Set Consisting Of All Items Required To Commission One Block Se Ction Except Ssdacs Warranty Period: 30 Months After The Date Of Delivery
Supply of Lt Panel Board With Copper Busbar Of 400 A, 3 Phase & Neutral 416V Floor Mounted Type Comprisin G Of 3 Nos X 400 Amp 4- Pole Mccb Adjustable Thermal And Adjustable Magnetic Setting Type & 2 No X 400 A Mp, 4 Pole 416 Volt Changeover Switch As Incoming And 2 Nos. X 250 Amp, 4 Pole Mccb Adjustable Thermal And Adjustable Magnetic Setting Type & 4 Nos. X 100 Amp 4 Pole Mccb & 10 Nos. X 63 Amp 4 Pole Mccb As Outgoing Including Hrc Type Back Up Fuses With Each Mccbs As Per Their Rating Electronic Frequency Meter, Ef & Oc Relay, Digital Voltmeter & Ammeter Etc With Selector Switch, Led Indication Lamp On Each Incoming & Outgoi Ng Circuit Fitted In Suitable Size Duly Pointed Crca Steel Box Powder Coated Enclosure. Warranty Period: 30 M Onths After The Date Of Delivery