Supply of Export Quality Pwi Tool Kit Model Tk-1 For Rgm Machine Consisting Of Following Items- 1. Cleara Nce Gauge Bg 2. Shim Feeler Gauge. 3. Stepped Feeler Gauge 4. Tapered Gauge. 5. Gap Gauge. 6. Rail Ther Mometer Similar To Model Mfmbt-A. 7. Pair Of Versine Holder. 8. Versine Scale. 9. Nylon Cord On Winder. 10. Ma Gnifying Glass. 11. Adjustable Mirror For Checking Cracks. 12. Vertical Wear Measuring Gauge Similar To Model V Wg-1. 13. Vernier Caliper. 14. Track Square. 15. Rail Profile Plotting Curve. 16. Steel Scale 12 Inch /300 Mm. 17. Outside Caliper 150 Mm. 18. Inside Caliper 150 Mm. 19. Spirit Level Similar To Model Sl-2. 20. White Clad Pocket S Teel Tape 3 Meters Long. 21. White Clad Pocket Steel Tape 20 Meters. 22. Straight Edge 10 Cm. 23. Pocket Torch. 2 4. Data Book With Pen. 25. Calculator Scientific. 26. Glass Fiber Safari Well Padded Box With Lock & Key Arrangem Ent Provided With Well Cushioned Double Decker System To Avoid Loss & Damage Of Instruments Make- Pie/Lor Am Warranty: 01 Year From The Date Of Supply Against Any Manufacturing Defects Or Use Of Substandard Material.
Making Of Boulder Check Dam Across The Drain Near K-Drift At Tikak Colliery
Draining And Cleaning Kunnar Dam, Check Dam And Kumbalamthodu In The Year 2024
Providing Armed Security Guard At Security Check Post Of Gandhisagar Dam Project Is Maintenance For Period Of 12 Months Year 2024-25
Supply of Kit For Preventive Maintenance C/M2+M3-Check Items For Greaves Make Di Esel Engine 12V14tag23.Firm Shall Also Quote Item Wise Rates For Kit Items As Per S Chedule-B Of Edml-224.Periodicity Of Schedule As Per Railway Bd Letter No. 2006/Ele Ctg/138/1Pt Dated 11.01.2023, As Per Drawing: As Per Schedule- B Of Edml - 224, Packing Instruc Tion: As Per Standard Packing. It Should Be Ensured That Item Should Not Rub During Transportation. The Item Should Be Packed With Adequate Strength. Transit Damage, If Any, Shall Be At The Cost Of Supplier. Warranty Period: 30 Months After The Date Of Delivery Unscheduled Maintenance Items For Greaves Make Diesel Engine 12V14tag 23.Firm Shall Quote Item Wise Rates As Per Schedule-C Of Edml-224., As Per Drawing: As P Er Schedule-C Of Edml-224, Packing Instruction: As Per Standard Packing. It Should Be Ens Ured That Item Should Not Rub During Transportation. The Item Should Be Packed Wi Th Adequate Strength. Transit Damage, If Any, Shall Be At The Cost Of Supplier. War Ranty Period: 30 Months After The Date Of Delivery Kit For Preventive Maintenance B/M1-Check Items.Firm Shall Also Quote I Tem Wise Rates For Kit Items For Greaves Make Diesel Engine 12V14tag23 As Per Sche Dule-A Of Edml-224. Periodicity Of Schedule As Per Railway Bd Letter No. 2006/Electg /138/1Pt Dated 11.01.2023, As Per Drawing: As Per Schedule-A Of Edml -224, Packing Instruction: A S Per Standard Packing. It Should Be Ensured That Item Should Not Rub During Tran Sportation. The Item Should Be Packed With Adequate Strength. Transit Damage, If A Ny, Shall Be At The Cost Of Supplier. Warranty Period: 30 Months After The Date Of Delivery
Supply of Kit For Koel Enginefor App Code Dvo.9019, Dvo90921, Dvo9026, Dvo9027 Prev Entive Maintenance B-Check Items.Firm Shall Also Quote Item Wise Rates For Kit Item S As Per Schedule-A Of Edml-223., As Per Drawing: As Per Schedule-A Of Edml-223, Packing In Struction: As Per Standard Packing. It Should Be Ensured That Item Should Not Rub Duri Ng Transportation. The Item Should Be Packed With Adequate Strength. Transit Dam Age, If Any, Shall Be At The Cost Of Supplier. Warranty Period: 30 Months After The Date Of Deliv Ery Kit For Koel Enginefor App Code Dvo.9019, Dvo90921, Dvo9026, Dvo9027 Prev Entive Maintenance C-Check Items.Firm Shall Also Quote Item Wise Rates For Kit Item S As Per Schedule-B Of Edml-223., As Per Drawing: As Per Schedule-B Of Edml-223, Packing In Struction: As Per Standard Packing. It Should Be Ensured That Item Should Not Rub Duri Ng Transportation. The Item Should Be Packed With Adequate Strength. Transit Dam Age, If Any, Shall Be At The Cost Of Supplier. Warranty Period: 30 Months After The Date Of Deliv Ery Unscheduled Maintenance Items For Koel Enginefor App Code Dvo.9019, Dv O90921, Dvo9026, Dvo9027.Firm Shall Quote Item Wise Rates As Per Schedule-C Of Edml- 223, As Per Drawing: As Per Schedule-C Of Edml-223, Packing Instruction: As Per Standard Packi Ng. It Should Be Ensured That Item Should Not Rub During Transportation. The Item Should Be Packed With Adequate Strength. Transit Damage, If Any, Shall Be At The C Ost Of Supplier. Warranty Period: 30 Months After The Date Of Delivery
Removal Of Slippage/Debris At Talwara Road Near Salal Dam Trt Area During Monsoon Period. Rd Approx. 5500 Meter To Rd 5590Meter And Nearby Areas From Cdl-Cisf Check Post At Salal Dam
Renovation Of Kalabani Check Dam At Mouza-Kalabani, Jl No-157, Within Ranibandh Block