Comprehensive Annual Service Maintenance Contract Of 21 Nos. Lifts Of Omega Make, Located At Churchgate, Grant Road, Mumbai Central, Jagjivanram Hospital & Bandra Pali Hill, For A Period Of 3 Years.
Comprehensive Annual Service Maintenance Contract Of 16 Nos. Lifts Of Monarch Make, Located At Badhwar Park/ Colaba, Churchgate, Mumbai Central, Jagjivanram Hospital & Matunga Road, For A Period Of 3 Years.
Signalling Work In Connection With Tsrp 62.700 Tkm M/L 10.130 Tkm And Suburban 52.57 Tkm.In Ccg-Vr Section Of Mumbai Division, Western Railway. 2.Signalling Work In Connection With Ctrs/P 11.224Tkm And Trrs 5.020Tkm In Ccg-Vr Section Of Mumbai Division, Western Railway. 3.Signalling Work In Connection With Churchgate-Virar - Trr P 0.392 Kms On Br. No. 75 On Dn Th Line Of Mumbai Division, Western Railway. 4. Signalling Work In Connection With Churchgate-Virar - Trr P 1.438 Kms On Br. No. 73 On Dn Th Line.
Supply Installation Testing And Commissioning Sitc Of Fire Escape Staircase At Gic Re Head Office, Suraksha, 170. J Tata Road, Churchgate, Mumbai Construction Of Fire Escape Stairacse At Gic Re Head Office
Seeking Labour Assistance In Workshop For Day To Day Working For Material Handling For 01Year 365 Days Of Churcha Mine Ro.
Ohe Work In Connection With Provision Of 12 Metre Wide Fobs In Connection With Amrit Bharat Station Scheme At Marine Lines, Charni Road, Grant Road, Lower Parel, Prabhadevi, Jogeswari And Malad In Churchgate-Virar Section.
Signalling Work In Connection With 1. Trrp 33.705Tkm M/L 12.278Tkm And Suburban 21.427Tkm 2. Churchgate-Marine Line Section- Signalling Work In Connection With Dismantling & Re-Building Of Wankhede Stadium Fob South & North Foot Over Bridges At Km 0/11-12 & 0/16-17 2 Nos. In Ccg-Vr Section
Construction Of Cc Road Near Chalsa Railgate To Mercy Fellowship Church Under Matiali Block Within Length- 1.335 Km Sl No - 01 Construction Of Cc Road Near Chalsa Railgate To Mercy Fellowship Church Under Matiali Block
Handling Transport And Other Mining Services - Percentage Quote Based - Maintenance Of 12001000 Mm Wide Main Belt Conveyor Namely Double Storey Belt G Belt And Mandir Belt E And C Belt And H Belt Conveyor In Surface At West Block Of Churcha Mine Ro
Welcome maintenance Including Repair/ Replacement Of Internal Wiring, Db, Mcb Of And Certain Misc Works At Church Road, Artrac, Cc Hut, Gym Road, Ciu, Sabre Mess, Green Mendows Ichhamati Line, Mainamati Line And Adjoining Area Under Ge Central
Comprehensive Annual Maintenance Contract Camc For Complete Train Management System Tms Installed At Central Control Office Including System Software, Tms Application Software Modules, Field Equipments With System Software And Application Software Installed Over Churchgate-Virar Section Of For A Period Of One Year.