Supply of Job Order 542 Opening The Radiator Assembly Including Replacement The Following Items Rubber Hose Radiator Radiator Cap Coolant Radiator Clean Service Charge Opening The Brake System Of Front Wheels Checking It Replacement Of Following Items Brake Liner Brake Spring Break Oil Master Cylinder Kit Brake Pipe Line Opening The Complete Wheels Of Veh Greasing The Hub Bearings Of All Four Wheels And Nipple Grease To Veh For Smooth Running Veh Including Material Grease Making Complete Wheels Alignment Balancing Of Veh By Adjusting Tie Rod Wheel Drum King Pin Testing On Computerized System Replacement Of Following Brake Light Assy Complete Fog Lamp Complete Including Lamp Oil Seal Kit Complete Rear View Mirror Side Door Lock Engine Oil Gtx Oil Filter Element Fuel Filters Primary Secondary Differential Gear Oil Gtx Opening The Propeller Shaft Of Veh Remove The Play Between Joint Cross And Propeller Shaft Of Rear Side Replacement With New Joint Cross Nut Joint Pin Etc Minor Denting And Painting Including Change Of Markers Repair Of Wheel Steering Assembly Including Change Of Power Steering Belt Greasing Of Steering Shaft Complete Cleaning Of Diesel Tank Labour
Annual Maintenance Of Lt Swgr Buses Modules Breakers Electronic Controller Panels Auxiliary Control Panels Power Transformer Over Hauling Of Lt Motors Cleaning And Painting Of 144 Nos Insulators Replacing Of Shaft And Support Insulator
Cleaning And Removal Of Hard Deposited Material From 150 Mm Gi Pipe Lines 2 No In Parallel Leakage Water Pipe Line And From Drains Along The Way Of Approach Tunnel To Machine Hall And From Existing Fibre Channels, Pvc Pipes Of Bus Shaft At Pench H
Repairing Of Main Rollers By Cleaning, Washing, Repairing Worn Out Roller Shaft By Straightening, Remetalling, Turning, Finishing, Polishing And Tempering Etc At Tones Weir