Handling Transport And Other Mining Services - Percentage Quote Based - Handling & Transport Service Loading And Transportation Of Rom Coal From Coal Stockyard To Semi Mobile Crusher And Loading Of Curshed Coal Into Tippers At Amalgamated Gondegao..
Rate Contract For Repairing Of Damaged/ Torn Out / Burnt Nnfire Resistance Conveyor Belt And Replacement Of Connected Parts, Lifting And Releasing Of Take Up And Replacement Etc. At Coal Handling Plant Of 1X800 Mw Wtps # 8.
Annual Rate Contract For Various Works Related To Operation Of Various Tripper Trolleys, Drive End Conveyor, Flap Gates At Transfer Towers/Transfer Chutes And Cleaning At Various Locations Of Coal Handling Plant At Tps-Ukai. Fuel
Work Of Repairing And Rewinding Of 12 Kw, Cbms-1A Cross Belt Magnetic Separator Of Conveyor-2A At Coal Handling Plant, Gsecl Wanakbori Tps.
Providing Of Water Tanker With Water For Sprinkling Water On Various Roads In Coal Handling Plant
Various Maintenance Works Of Wagon Tippler -1 To 3 In Coal Handling Plant At Tps – Ukai On As And When Required Basis
Supply Of 330Kw, 6.6Kv Coal Crusher Motor For Coal Handling Plant
Handling Transport And Other Mining Services - Percentage Quote Based - Handling & Transport Service Loading And Transportation Of 6 Lakh Te Coal From Stockpile Heap No 16 And 17 Of Religara Oc To Gidi A Chpcrusher For A Period Of 03 Three Years
Handling Transport And Other Mining Services - Percentage Quote Based - Handling & Transport Service Loading Transportation Of Coal From Different Coal Heaps Of Potanga Heap To Chp Silo Of Birsa Project Of Barka Sayal Area Via Potanga And Birsa ..
Procurement Of Rollers And Roller Frames For Strategic Replacement In The Coal Handling Plant, Roll Ms 152Mm 530Mm 35Mm A Idler Roll V Return 0270 155 Pvm B 504, Idler Assy Single Roll Return, Roll Ms 152Mm 2200Mm 35Mm B, Roll Impact 139X190mm 530Mm 35Mm A, Guide Roller Skf 63X120mm M20x75, Guide Roller Skf 88X175mm M20x50, Guide Roller Skf 88X120mm M20x50, Guide Roller 50X100mm Skf M20x50, Idler Frame Self Align Return Str 1400Mm, Idler Frame Bracket 1400 1043 5520 002, Idler Frame Return 2 Roll 10 Deg 1400Mm, Idler Frame Self Align Train Cary 1400Mm, Idler Frame Carry Impact 1400Mm 1650Mm, Idler Frame Carry 35 Deg 1400Mm 1690Mm, Idler Frame Transition 20Deg 1400, Idler Assy Return Adj 1400Mm,
Annual Comprehensive Operation And Maintenance Contract For Plc Based Pressurized Air Close Coal Mills Reject Handling And Conveying System At U -8 And 9 Tps For 2 Year
Handling Transport And Other Mining Services - Percentage Quote Based - Ob Removal Coal Extraction Hiring Of Hemm For Removal Of Ob Including Rh Ob And Extraction Transportation Coal To Kuju New Siding Kedla Washery Stockyards From Pundi Ocp For..
Design Engineering Supply Packing And Forwarding, Erection Startup And Commissioning And Fulfillment Of Performance Guarantees Of 150 Tph Coal Handling Plant And Auxiliaries At Tnpl Unit I
Supply And Apply Of One Coat Of Epoxy Primer / Red Oxide And Two Coat Synthetic Enamel Oil Paint Anti Corrosive At Various Structure As Per Site Requirement At Coal Handling Plant –Gtps
Biennial Rate Contract For Repairing Of Damaged/Torn Out/Burnt Nn Fire Resistance Conveyor Belt And Replacement Of Connected Parts, Lifting And Releasing Of Take Up And Replacement/Refitting Of Rollers/Roller Stands Etc. At Coal Handling Plant Of Unit#1 To 7, Wtps And Gtps.
Providing Painting To The Corroded Steel Galleries Of Internal Coal Handling Plant From Jnt-4 To Bunkers Of Unit I & Unit Ii For The Year 2024-25
Procurement Of Control Junction Boxes In The Coal Handling Plant Area
Maintenance And Repair Of Ht 11/3.3Kv Power Distribution Boards And Maintenance Of Ht Transformers Upto 5 Mva Of Battery, Coke And Coal Handling Plant And By- Product Plant Of Cob 10 Complex
Supply of Draw Out Modules For Coal Handling Plant In Cob 1 To 5, 20 Item 10 51110901000055 30Kw Draw Out Module With Mccb Item 20 51110901000056 45Kw Draw Out Module With Mccb Item 30 51110901000057 55Kw Draw Out Module With Mccb Item 40 51110901000058 90Kw Draw Out Module With Mccb Item 50 51110901000059 125Kw Draw Out Module With Mccb
Mega Contract For Coal Handling Plant Covering Mechanical Maintenance Of Coal Handling Plant Along With Related Sub Systems And Auxiliaries.