Annual Contract For Picking Up Of Stones/Shales Extraneous Materials From Coal On Running Conveyors At Strategic Points In Chp1 & 2 At Rtps And Disposing The Same
Picking Of Shale, Stone, Oversize Coal And Foreign Material From The Coal On Running Conveyor Belts Running At The Speed Of Around 3.5Metres Per Second Pertains To Stage-1 & 2 Of Chp And Transport Of Shale To Dump Yard Within The Premises Of Chp Distance: 0 To 5 Km As And When Required During The Period From 01-4-2024 To 31-03-2025 Or Till The Exhaust Of Quantity