Construction Of Fair Price Shop At Lukung Village - Excavation Earth Work Excavation Upto 12 Inch, Retaining Wall Providing And Laying Of Retaining Wall, Back Filling And Filling With Available Excavated Earth, Ppc Flooring Providing And Laying Concrete With 40Mm, Masonary Work In Super Structure Providing And Laying Cement Brick Masonry, Internal Plastering, External Plaster Providing And Applying, Putty And Base With Obd, Painting Providing And Applying Two Or More Coats, Roof Steel Structure With Gi Sheet, Flooring Cement Flooring With 1 4 Cement Sand Ratio With Smooth Finish, Doors Doors Of Size 7Ft X 3 Ft With Hardware, Windows Windows Of Size 5Ft X 4Ft With Accessories And Hardware, Electrical Fitting Providing And Fixing, Providing And Supply Tubelight, Curtain For Windows, False Ceiling Including Providing And Fixing, Development Of Stage, Iron Rack With Installation For Display, Toilet Hardware And Plumbing Work
Supply of Hot Finish Seamless Hfs Pipe Nominal Bore 25 Mm, Heavy Painted With Two Coats Of Red Oxide Zin C Chrome Priming To Is: 2074/2023 After Grit Blasting Or Mechanical Brushing For Air Brake Coaching Stock To Is: 1 239 Pt. I-2004 Re-Affirmed In 2019. Warranty Period: 30 Months After The Date Of Delivery
Supply of Hot Finish Seamless Hfs Pipe Nominal Bore 25 Mm, Heavy Painted With Two Coats Of Red Oxide Zin C Chrome Priming To Is: 2074/2015 Reviewed In 2020 After Grit Blasting Or Mechanical Brushing For Air Brake Coa Ching Stock To Is: 1239 Pt. I-2004 Reviewed In 2019 Warranty Period: 30 Months After The Date Of Delivery
Supply of Hydraulic Trolley. Capacity: 3Mt, Platform Size: 1400 X 750 Mm, Maximum Lift: 1000 Mm As Per Dbws Sk No. 1290, Technical Specification: Loading Capacity:3000 Kgs, Maximum Height 1000 Mm From Grou Nd Level, Minimum Height: 350 Mm From Ground Level, Platform Size: 1400 X 750 Mm, Lifting Power Manual Hydr Aulic, Wheels 100 Mm Solid Block Wheels- C.I. Platform Surface: Anti Skid Chequered Plate, Paint 2 Coats Of Paint And One Coat Of Primer Applied On Metal Parts Of Machine. Warranty Period: 30 Months After The Date Of Deliver Y
Earth Work, Laying Plain Cement Concrete, 1St Class Brick Work With Bricks In Foundation, 1St Class Brick Work With Bricks In Superstructure, Supply And Fixing Tmt Bars Of 500D, 15 Mm Thick Cement Plaster, Neat Cement Punning, Reinforced Cement Concrete, Demolishing Pcc, Demolishing Rcc, Structural Steel, Filling Available Excavated Earth, Providing And Fixing Straight Shuttering, Supplying And Applying Two Coats Of General Purpose Synthetic Enamel, Snowcem Painting, White Washing, Finishing Walls Acrylic Emulsion, Providing And Laying Bitumen Mastic 25 Mm, Providing And Laying Bitumen Mastic 40 Mm
Supply Of Miscellaneous Items Like Rain Coats, Shoes, Umbrellas, Plastic Gallons And Other Items For Smooth Conduct Of Sanjy 2024
Supply of Water Cooled Panel No.1 Type-Eas Per Rwf Drg.No.771200111330 & Special C Onditions. Note:Supplies Shall Be Guaranteed For Quality, Workmanship And Perfor Mance For Minimum Period Of 12 Months From The Date Of Fitment. I Pre-Qualificatio N For Tenderers. A Only Manufacturers Fo Electric Arc Furnaces Or Their Sub Con Tractors Who Manufacture Structuals For Oems Of Electric Arc Furnaces Shall O Nly Quote. Such Tenderers Shall Also Produce Evidence Of Having Supplied The Sam E. B The Required Raw Materials Shall Be Sourced Through Reputed Sources Such A S M/S Sail, Tisco, Isp&T, Ismt, Jindal, Msl, Kalyani, Tata. Tenderers Shall Furnish Mtc Fo R Raw Materials Including The Source. C The Tenderers Should Have Sufficient Qual Ified Welders For Manufacturing And Supplying The Water Cooled Panels On Time. Th Ey Shall Produce Certificates Of Qualified Welders On Their Rolls. Dthe Tenderers Shall Submit A Detailed Qap As Indicated Below On Receipt Of Order. Ii Scope Of Wor K For Manufacturing, Testing And Supply Of Water Cooled Panels. A Submission Of R Aw Materials Procurement Invoices From Reputed Sources To M/S. Rites. B Welding S Equence Plan And Selection Of Electrodes - E 7018 Quality Of M/S. Advani/L&T/Esab. C S Ubmission Of Drawings Of Jigs And Fixtures Proposed To Be Used. D Marking, Sizing A Nd Surface Preparation. E Preparation Of Weld Joints. F Welding By Qualified Welde Rs. G Stress Relieving, Time Temperature Graph Shall Be Enclosed. F Non-Destructiv E Testing Of Weldments. Test Certificate Shall Be Enclosed. I Pressure Testing Shal L Be Done At 10 Kg/Cm2 For 2 Hours And The Water Cooled Panels Shall Be Free From A Ny Water Leakage. J Painting Of Water Cooled Panels By One Coat Of Red Oxide Paint Followed By Two Coats Of Heat Resistant Aluminium Paint. K A Metal Tag Shall Be Tac K Welded On The Outer Surface Of The Panel In The Centre Location Containing Manu Facturers Name, Po No. And Date For Identification For Traceability. L Dispatch Of W Ater Co Warranty Period: 12 Months After The Date Of Delivery Water Cooled Panel No.Ii, Iii, Iv, Ix, X & Xitype-A As Per Rwf Drg No. 771200111330 & Special Conditions: Note:Supplies Shall Be Guaranteed For Quality, Workmanship A Nd Performance For Minimum Period Of 12 Months From The Date Of Fitment. I Pre-Qu Alification For Tenderers. A Only Manufacturers Fo Electric Arc Furnaces Or Thei R Sub Contractors Who Manufacture Structuals For Oems Of Electric Arc Furnace S Shall Only Quote. Such Tenderers Shall Also Produce Evidence Of Having Supplied The Same. B The Required Raw Materials Shall Be Sourced Through Reputed Source S Such As M/S Sail, Tisco, Isp&T, Ismt, Jindal, Msl, Kalyani, Tata. Tenderers Shall Furnis H Mtc For Raw Materials Including The Source. C The Tenderers Should Have Suffici Ent Qualified Welders For Manufacturing And Supplying The Water Cooled Panels O N Time. They Shall Produce Certificates Of Qualified Welders On Their Rolls. Dthe Te Nderers Shall Submit A Detailed Qap As Indicated Below On Receipt Of Order. Ii Scop E Of Work For Manufacturing, Testing And Supply Of Water Cooled Panels. A Submis Sion Of Raw Materials Procurement Invoices From Reputed Sources To M/S. Rites. B Welding Sequence Plan And Selection Of Electrodes - E 7018 Quality Of M/S. Advani Oe Rlicon/L&T/Esab/Meta Fusion/Weldcraft/Ador Only. C Submission Of Drawings Of Jigs And Fixtures Proposed To Be Used. D Marking, Sizing And Surface Preparation. E Pre Paration Of Weld Joints. F Welding By Qualified Welders. G Stress Relieving, Time Tem Perature Graph Shall Be Enclosed. F Non-Destructive Testing Of Weldments. Test Ce Rtificate Shall Be Enclosed. I Pressure Testing Shall Be Done At 10 Kg/Cm2 For 2 Hou Rs And The Water Cooled Panels Shall Be Free From Any Water Leakage. J Painting O F Water Cooled Panels By One Coat Of Red Oxide Paint Followed By Two Coats Of Hea T Resistant Aluminium Paint. K A Metal Tag Shall Be Tack Welded On The Outer Surfac E Of The Panel In The Centre Location Containing Manufacturers Name, Po No. And D Warranty Period: 12 Months After The Date Of Delivery Water Cooled Panel No.V & Viii Type - B As Per Rwf Drg. No. 761200111310 & S Pecial Conditions: Note:Supplies Shall Be Guaranteed For Quality, Workmanship And Performance For Minimum Period Of 12 Months From The Date Of Fitment. I Pre-Quali Fication For Tenderers. A Only Manufacturers Fo Electric Arc Furnaces Or Their S Ub Contractors Who Manufacture Structuals For Oems Of Electric Arc Furnaces S Hall Only Quote. Such Tenderers Shall Also Produce Evidence Of Having Supplied Th E Same. B The Required Raw Materials Shall Be Sourced Through Reputed Sources S Uch As M/S Sail, Tisco, Isp&T, Ismt, Jindal, Msl, Kalyani, Tata. Tenderers Shall Furnish M Tc For Raw Materials Including The Source. C The Tenderers Should Have Sufficient Qualified Welders For Manufacturing And Supplying The Water Cooled Panels On Ti Me. They Shall Produce Certificates Of Qualified Welders On Their Rolls. Dthe Tend Erers Shall Submit A Detailed Qap As Indicated Below On Receipt Of Order. Ii Scope O F Work For Manufacturing, Testing And Supply Of Water Cooled Panels. A Submissio N Of Raw Materials Procurement Invoices From Reputed Sources To M/S. Rites. B Wel Ding Sequence Plan And Selection Of Electrodes - E 7018 Quality Of M/S. Advani Oerlic On/L&T/Esab/Meta Fusion/Weldcraft/Ador Only. C Submission Of Drawings Of Jigs And Fixtures Proposed To Be Used. D Marking, Sizing And Surface Preparation. E Prepara Tion Of Weld Joints. F Welding By Qualified Welders. G Stress Relieving, Time Tempera Ture Graph Shall Be Enclosed. F Non-Destructive Testing Of Weldments. Test Certifi Cate Shall Be Enclosed. I Pressure Testing Shall Be Done At 10 Kg/Cm2 For 2 Hours An D The Water Cooled Panels Shall Be Free From Any Water Leakage. J Painting Of Wat Er Cooled Panels By One Coat Of Red Oxide Paint Followed By Two Coats Of Heat Res Istant Aluminium Paint. K A Metal Tag Shall Be Tack Welded On The Outer Surface Of T He Panel In The Centre Location Containing Manufacturers Name, Po No. And Date Fo Warranty Period: 12 Months After The Date Of Delivery Water Cooled Panel No.Vi Type-C As Per Rwf Drg.No.771200111340 And Speci Al Conditions.Note:Supplies Shall Be Guaranteed For Quality, Workmanship And Perf Ormance For Minimum Period Of 12 Months From The Date Of Fitment. I Pre-Qualificat Ion For Tenderers. A Only Manufacturers Fo Electric Arc Furnaces Or Their Sub Co Ntractors Who Manufacture Structuals For Oems Of Electric Arc Furnaces Shall Only Quote. Such Tenderers Shall Also Produce Evidence Of Having Supplied The Sa Me. B The Required Raw Materials Shall Be Sourced Through Reputed Sources Such As M/S Sail, Tisco, Isp&T, Ismt, Jindal, Msl, Kalyani, Tata. Tenderers Shall Furnish Mtc F Or Raw Materials Including The Source. C The Tenderers Should Have Sufficient Qu Alified Welders For Manufacturing And Supplying The Water Cooled Panels On Time. They Shall Produce Certificates Of Qualified Welders On Their Rolls. Dthe Tendere Rs Shall Submit A Detailed Qap As Indicated Below On Receipt Of Order. Ii Scope Of W Ork For Manufacturing, Testing And Supply Of Water Cooled Panels. A Submission O F Raw Materials Procurement Invoices From Reputed Sources To M/S. Rites. B Weldin G Sequence Plan And Selection Of Electrodes - E 7018 Quality Of M/S. Advani Oerlicon /L&T/Esab/Meta Fusion/Weldcraft/Ador Only. C Submission Of Drawings Of Jigs And Fix Tures Proposed To Be Used. D Marking, Sizing And Surface Preparation. E Preparati On Of Weld Joints. F Welding By Qualified Welders. G Stress Relieving, Time Temperat Ure Graph Shall Be Enclosed. F Non-Destructive Testing Of Weldments. Test Certific Ate Shall Be Enclosed. I Pressure Testing Shall Be Done At 10 Kg/Cm2 For 2 Hours And The Water Cooled Panels Shall Be Free From Any Water Leakage. J Painting Of Water Cooled Panels By One Coat Of Red Oxide Paint Followed By Two Coats Of Heat Resist Ant Aluminium Paint. K A Metal Tag Shall Be Tack Welded On The Outer Surface Of The Panel In The Centre Location Containing Manufacturers Name, Po No. And Date For Id Entifica Warranty Period: 12 Months After The Date Of Delivery