Repair Renovation Of Left Side Foot Path Of Old Abdullah Bridge Including Providing And Fixing Gi Pipe Railing Fixed In Cement Concrete Under Mh 3054 Ard
Supply Of Ready Mix Concrete - Ordinary Cement Concrete, Rmc M20 For Bridge And Structure, Rmc M20 For Sub Structure, Rmc M25 For Solid Slab, Rmc M25 For Bridge And Structure, Rmc M25 For Sub Structure, Rmc M30 For Wearing Coat
Custom Bid For Services - R And M Of Jyotipuram Dhyangarh And Talwara Road From Concrete Dam Left Cisf Post To Dabri Bridge By Way Of Cleaning Of Drains Removal Of Grass And Sweeping Roads Etc At Salal Power Station For The Period Of Two Year
Fabrication, Manufacturing, Testing And Its Allied Works For The Shuttering Required For The Casting Of Pre-Stressed Concrete Slabs At Bridge Workshop
Contract For Fiber Bragg Grating Based Optic Sensors, Interrogators And Data Acquisition System For Long Term Monitoring Of A Pre-Stressed Concrete Box Girder Bridge
Supply Of Fiber Bragg Grating Based Optic Sensors, Interrogators And Data Acquisition System For Long Term Monitoring Of A Pre-Stressed Concrete Box Girder Bridge
Supply of Manufacturing, Supplying, And Field Trial Of I Pre-Stressed Concrete Wider Base Sleepers Fitted With Under Sleeper Pad For 60 Kg 1 In 12 Turn Out To Rdsos Drg. No. T - 4218 General Layout With Latest Alteration /Amendment And To Irs Specifications No. T-454Th Revision March 2021 Each Set Consists Of 96 Sleepers As Per Rdso Layout Drg. No. T- 4218 .Iipre-Stressed Concrete Wider Base Sleepers Fitted With Under Sleeper Pad For Bridge Approach Sleepers For 25T Axle Load As Per Rdsos Drawing No. T-8970 To T- 8978 With Latest Alteration /Amendment And To Irs Specifications No. T - 39 - 2021 6Th Revision March 2021 With Corrigendum No. 1Iiipre-Stressed Concrete Normal Wider Base Sleepers Beyond 100Mt. Of Bridge Approach Fitted With Under Sleeper Pad To Drawing No. Rdso/T-8746 With Latest Alteration /Amendment And To Irs Specifications No. T - 39 - 2021 6Th Revision March 2021 With Corrigendum No. 1 .. Manufacture And Supply Of Pre-Stressed Concrete Wider Base Sleepers Fitted With Under Sleeper Pad For 60 Kg 1 In 12 Turn Out To Rdsos Drg. No. T - 4218 General Layout With Latest Alteration /Amendment A Nd To Irs Specifications No. T-454Th Revision March 2021 Each Set Consists Of 96 Sleepers As Per Rdso Lay Out Drg. No. T-4218 . Warranty Period: 60 Months After The Date Of Delivery Manufacture And Supply Of Pre-Stressed Concrete Wider Base Sleepers Fitted With Under Sleeper Pad For Bridge Approach Sleepers For 25T Axle Load As Per Rdsos Drawing No. T-8970 To T- 8978 With Latest Al Teration /Amendment And To Irs Specifications No. T-39 6Th Revision March 2021 With Corrigendum No. 1.T-89 70-3 Nos. Sleepers And T-8971 To T-8978 - 8 Nos. Sleepers Warranty Period: 60 Months After The Date Of Delive Ry Manufacture And Supply Of Pre-Stressed Concrete Normal Wider Base Sleepers Beyond 100Mt. Of Bridge Approach Fitted With Under Sleeper Pad To Drawing No. Rdso/T-8746 And To Irs Specifications No. T-39 6Th Revision March 2021 With Corrigendum No. 1. Warranty Period: 60 Months After The Date Of Delivery