Operation And Maintenance Of Dorb Silo System And Conveying System By-Pass Protein Plant And Clearing The Chocked Materials From Silos
Annual Comprehensive Operation And Maintenance Contract For Plc Based Pressurized Air Close Coal Mills Reject Handling And Conveying System At U -8 And 9 Tps For 2 Year
Design, Engineering, Manufacturing, Supply Erection, Installation, Testing & Commissioning With One Year O & M Of 02 Two Sets Of Dense Phase Dry Fly Ash Collection/ Conveying / Unloading System With Silos Of Unit No. 3 & 4 Of Gandhinagar Tps On Epc Basis ”.