Supply Of Pneumatic Air Blasters With All Accessories Like Solenoid Valves, Mounting Bracket, Safety Chain, Nozzles Etc., Local Control Panel Or Pneumatic Panels Or Jbs With Required Stainless Steel Impulse Or Pneumatic Tubing, Solenoid Valves, Filter-Regulator-Lubricator Unit, Sequential Timer And Accessories., Piping, Fittings, Valves And Instruments Etc, Erection And Commissioning Spares Including Fill Of Lubricants And Consumables, Maintenance Tools And Tackles, Any Other Item Not Indicated Above, But Required To Make The System Complete In All Respects., Control Panels-Air Break Switch, Control Panels-Aux Relays, Contactors - Auxiliary, Control Panels-Clustered Type Leds Of Different Colours, Control Panels-Push Buttons, Control Panels-Mcbs For Power And Control Circuits, Control Panels-Power Contactors, Control Panels-Timers, Control Panels-Thermal Over Load Relays, Control Panels-Power Fuses Of Each Type And Rating, Control Panels-Control Fuse Of Each Type And Rating, Control Panels-Current Transformer, Control Panels- Control Transformer, Control Panels-Control Switches, Control Panels-Indicating Meters, Control Panels-Terminal Blocks, Field Instrument -Complete Solenoid Valve Assembly, Field Instrument -Coil -Single Or Double Coil Type, Field Instrument -Gauge -Pressure, Differential Pressure, Temperature, Level, Field Instrument -Air Filter Regulator Complete Set With Pressure Gauges, Total Lump Sum Prices For Visits Should Include Travel Expenses To Or Fro Site Visa Or Insurance If Applicable. Also Refer Item Description For Details., Total Lump Sum Prices For Supervision Of Assembly, Erection And Commissioning Including Local Transportation, Boarding, Lodging And Other Related Expenses
Supply Of Tool Kit For Dismantling And Assembly, Tool Holder Box, Trolley Store-Storage Rack, Wallchart For Demonstration And Training, 2 Wheeler Simulator With Complete Working Model And Data Extraction, Electric Schooty Training Model With Battery And Charger, Retrofitted Hybrid 2 Wheeler, 4 Wheeler Model Ev Training System With Test Rig With Advanced Controller Feature And Iot And Embedded System, 4 Wheeler Electric Buggy Simulator With Complete Working And Ev Training Facility With Display Board, 15 Ah, 48 Volt Liion Phosphate Battery Pack Compatible With The 2 Wheeler, 4 Wheeler Test Rig And Simulator With Charger Set, Smps Charger, Ac Charging Station, Battery Manufacturing Raw Material 2 Set Of Cells, Packing Material, Battery Pack Testing Machine With Charging And Dischanging System, Regenerative Charging And Braking Training System, Hybrid Vehicle Model Training And Simulator Set Up, Bldc Cut Section With Description And Lnformation Charges 1000- Watt, Hub Motor Cut Section, Controller Cut Section With Description And Lnformation Charges, Bms Cut Section, Dcdc Converter Cut Section, Ev Battery Charger Cut Section, Instrumentation Cluster Cut Section, Ev Differential
Design, Manufacture, Inspection And Testing, Packing And Delivery Of Scs Complete With All Accessories Including E And C Spares As Applicable- Scs F-Nw S-150 C-Dcs, Installation Checks And Commissioning At Site- Lump Sum Visit Charges For Engineer Including Travel Except Daily Charges, Installation Checks And Commissioning At Site- Lump Sum Daily Charges For Engineer Including Boarding Lodging, Local Conveyance, Medical, Insurance Etc, Mandatory Sparesmeasuring Instruments - All Type Of Transmitters Including Sensors Of Each Type And Model, Mandatory Sparesmeasuring Instruments - Limit Switches For Isolation Valvesof Each Type, Mandatory Spares- Measuring Instruments - Local Indicators Like Temperature Gauges, Pressure Gauges, Differential Pressure Gauges, Flow Gauges, Flow Meters Etcof Each Make, Model And Type, Etc
Numerical Differential Over Current Protection Relays For 6.6Kv Ht Boards Of Unit#9 & 10