Tender For Rear Camera And Screen, Foam, Army Cdr Photo With Frame 25 X 30, Spring, Inverter Battery, Fuel Filter And Cleaner Funnel, Spring Door Closure, Manual Pump Fuel, Jharana, Palta, Chopping Bard, Dustbin, Repair Of Grinder, Solid Wood Cube Tv Unit, Repair Of Gas Chula, Electrical Cooker 50 Ltr, Idli Machine, Double Bed Hydraulic Pump Set, Repair Of Bukhari, Electrical Weighing Machine, Repair Of Bukhari Carborater Repair And Pipe Replacement
Supply of 415 Volts Ac Pre-Cooling Cum 110V. Dc Battery Charging Box Shall Be Fabricated With Ms Sheet 3Mm Thick And Ms Angle Of Size 40X40x5 Mm. The Box Shall Be Out Door Type, Floor Mounted Weather, Dus T & Vermin Proof With Degree Of Protection Ip54. It Shall Be Divided Into Two Compartments Of Equal Size Whi Ch Shall Have Independently Hinged Doors For Both The Compartments Lockable And Double Earthing Terminal Proper Canopy Shall Be Provided On The Top To Prevent Rain Water Entering Inside The Box. Separate Detach Able Plate 3Mm Thick Ms Sheet For Both Compartment Shall Be Provided 100 Mm Dia. Hole With Groomet For Incoming And Outgoing Cable. Incoming & Out Going Cable Shall Be Connected With The Bus-Bar From Bottom Side. The Box Shall Be Finished With Powder Coating Of Approved Colour Thickness Not Less Than 40 Microns. A1st Compartment Shall Be Suitable For Accommodating 1 No. 100 A. 4 Pole Mccb Fixed Type Thermal Mag Netic Release 35 Ka Breaking Capacity And Conforming To Is:13947/Part-2 & Iec: 60947/2, One 63A 5Pin 3P+ N+E415 V. Panel Mounted Socket With Spring Locked Cover & One 63A. 5 Pin 3P+N+E 415 V. Plug Conformi Ng To Iec 309/1&2, One No.16A.3Pin2p+E 250 V. Panel Mounted Socket With Spring Locked Cover & 1No. 16A 3 Pin2p+E 250 V. Plug Conforming To Iec 309/1&2 And 200A. Aluminium Bus-Bar For Phases & Neutral Shoul D Be Fixed On Fiber Sheet With Pvc Sleeve Colour Coded. 2Nd - Compartment Shall Be Suitable For Accommo Dating 1 No. 32 A. Dc Series Mcb Dp Suitable For 130 V Dc Supply, One No. Panel Mounted 32A 3 Pin 2P+E Socket With Spring Locked Cover A One No. 32A 3 Pin 2P+E Plug Conforming To Iec 309/1&2 And 200A. Alum Inium Bus-Bar For Two Positive & One Negative Should Be Fixed On Fiber Sheet With Pvc Sleeve Colour Code D. B Mccb & Mcb Should Be Operated Without Opening The Front Cover Inter- Connection With Suitable Siz E Pvc Insulated Copper Conductor Cable Conforming To Is:694/1990 From Bus Bar To Mccb/Mcb To Socket. 3 Core & 4 Core Pvc Insu- Lated And Pvc Sheathed Copper Conductor Flexible Cable Up To 110 V-Shall Be Co Nfirmed To Is:694 With Plugs. Proper Visible Indication Plate Fluorescent Screen Printed On The Front Of Both C Ompartments Shall Be Provided For 415V. Ac Pre-Cooling Box And 110V Dc Battery Charging Box As Approved By Railway. Cthe Box Shall Be Grouted In Ground With Cement Morter Mixing 1:2:4 With Muffing As Per Rail Way Drawing. Note:- It Should Be Ensured: 1 All Cable Connections To Be Db S J.Box Panel Etc. Should Be M Ade Through Proper Size Of Cable Glands/End Fittings No Space Should Be Left Open To Avoid Entry Of Insect S/Lizards Etc. If Necessary, Blanking Plate Should Be Provided In Dbj. 2 Flexible/Rigid Conduits Wherever Provi Ded Should Be With Suitable End Fittings/Clamps Conduit Should Be Secured On Surface Through Suitable Clamps At Regular Interval As Per Is Spec. 3 Sitc As Per Attached Drawing. Warranty Period: 30 Months After The Date O F Delivery
Design, Manufacture, Supply, Installation, Integration, Testing And Commissioning Of Rolling Stock, Communication Based Signaling And Train Control, Telecommunication, Platform Screen Doors Systems And Depot Machinery And Plant Including 15 Years Of Comprehensive Maintenance After 2 Years Of Defect Liability Maintenance Period Of Line 4 And Extension Corridor 4A Wadala-Kasar- Vadavali-Gaimukh Of Mumbai Metro Rail Project Of Mmrda
Design, Manufacture, Supply, Installation, Integration, Testing And Commissioning Of Rolling Stock, Communication Based Signalling And Train Control, Telecommunication, Platform Screen Doors And Depot Machinery And Plant Of Line 5 Phase 1 - Kapurbawadi - Kasheli - Dhamankar Naka And Phase 2 - Dhamankar Naka -Bhiwandi - Kalyan Apmc Of Mumbai Metro Rail Project Of Mmrda Including 15 Years Of Comprehensive Maintenance After 2 Years Of Defect Liability Maintenance Period