Construction Of Two Rcc Sluice Gate At Kushamara Gp And Jamjuri Gp And One Anti Erosion Work Along The Left Bank Of Gomati River Under Udaipur Municipal Council Part Xi Implementation Of Sna Sparsh Model Sh Dredging Of Jamjuri Cherra Starts Fro
Gem Bids For Custom Bid For Services - Hiring Of One Number 55mt Minimum Basic Capacity Crawler Mounted Hydraulic Crane With Operator Along With Heavy Duty Clamshell Grab For Desilting Or Dredging Purpose For A Period Of Two Years At Lock Entrance Of Haldia Dock ..
Dredging Work, Construction Of River Training Walls, Groynes. Clearing Of Water Way And Constructon Of River Training Wall With Associated Structure In Bahana Nalla Near Markandi
Construction Of Embankment, Dredging Of Nayanjuli, Walking Pathway, Plantation, Bio Diversity Park Along With Fencing Work At Debi Ghat At Ch. 0.50 Km Of Kazi Nazrul Islam Avenue Of V.i.p Road Under Barasat Highway Division No. I
Maintenance Dredging Of Mahanadi River Channel Of Paradip Port Authority For The Year 2025-26 To Dredge A Total In-Situ Quantity Of 1.5 Lakhs Cu.Mtr. Up To Its Desired Depth Of 3.5 Metre