Selection Of A Contractor For Carrying Out Composite Work Post Audit Structural And Miscellaneous Civil Repairing, Electrical, Ac Etc. Of Bank’S Owned Office Building, Turbhe.
Day To Day Operational Maintenance Of Electrical Works At Pmg Office Campus And Postal Staff Qtr. Colony, Manning, Materials And Additional Work
Special Repairs To Replacement Of Ber Declared Dg Set 160 Kva At Thirumalpur Pump House And Provision Of 6 In Number Street Lights In Various Location And Provision Of Electrical Points At Post Office And Flame Proof Fittings To Be Installed For Po
Design, Engineering, Supply, Fabrication, Installation And Commissioning Of On Grid Solar Photovoltaic Power Plant Along With Associated Electrical Jobs Over Car Parking Sheds And Post Warranty Annual Maintenance Contract
50 Item Category/?? ?????? Supply Of Pre Fabricated Gurad Post With Att Toilet Of Size Mentioned In Store List For Erection Made Of Puf Wall Panel Of 60Mm Thicck With L Shape Corned Panel Complete Set As Per Store List, Building Material For Guard Post With Att Toilet Complete Set As Per Store List, Hardware Material For Guard Post With Att Toilet Complete Set As Per Store List, Electrical Stores For Guard Post With Att Toilet Complete Set As Per Store List, Earthing Material For Guard Post With Att Toilet Complete Set As Per Store List, Plumbing Stores Material For Guard Post With Att Toilet Complete Set As Per Store List, Sanitary Stores Material For Guard Post With Att Toilet Complete Set As Per Store List, Water Tank Staging Material For Guard Post With Att Toilet Complete Set As Per Store List, Soakage Well 2.1M Dia And 1.8M Fluide Depth Including 06 Nos Man Hole Material For Guard Post With Att Toilet Complete Set As Per Store List, Material For Septic Tank For Guard Post With Att Toilet Complete Set As Per Store List, Lighting Protection Material For Guard Post With Att Toilet Complete Set As Per Store List, Furniture For Guard Post With Att Toilet Complete Set As Per Store List, Tools And Plants For Guard Post With Att Toilet Complete Set As Per Store List
Procurement Of Electrical Heat Treatment Furnace Stress Relieving Capacity-6 Ton. Post Warranty Camc 5 Years With Spare As Per Technical Specification Attached Electrical Heat Treatment Furnace Stress Relieving Capacity-6 Ton Warranty Period: 30 Mont Hs After The Date Of Delivery