Laying Of Ofc And Other Cables At Airport - Supply Of Telephone Junction Box 50 Pair Fully Loaded With Krone Modules, Supply Of Telephone Junction Box 20 Pair Fully Loaded With Krone Modules, Light Interface Unit Liu For 24 Core Ofc, Ofc Patch Cord 3 Meter Length, Ofc Patch Cord 1 Meter Length, Laying Of Armoured 24 Core Ofc, Laying Of 50 Pair Armoured Telephone Copper Cable, Laying Of Armoured 6 Core Ofc, Laying Of 20 Pair Telephone Copper Cable, Laying Of Semi Rigid Rf Cable, Erection Of Dipole Antenna With Pole, Miscellaneous Charges For Other Items I.E. Clamps, Cable Tie Etc. Required To Complete The Work, Sitc Charges For All The Works Defined In Scope Of Work In Atc Document
Supply and Erection of Security Fence (Anti Climb) system with Weld Mesh Panel, Circular Hollow steel fence post, clamp with MS angle iron vertical posts, galvanized steel barbed wire 2.24 mm dia 2 strands twisted design, Punched Tape Concertina Coil incl all accessories of security fencing as per design and drgs att as Appx 'E'.
Supply, Installation And Termination Of 100 Pair Pijf 0 Point 5 Mm Armoured Telecom Cable, 50 Pair Pijf Ug Cable 0 Point 5Mm Armoured, 100 Plus 100 Pair Pillar Box Including 10 Pair Insulation Displacement Modules With Full Capacity, 100 Pair Jointing Kit, Route Marker And Joint Indicator, Digging And Back Filling Of Trench In Soil 3169 Meters, Digging In Tar Road Cutting Closing And Consolidation Of Trench 122 Meters, Laying Of Pijf Cable In Soil With Sand And Brick Protection 3500 Meters, Laying Of Pijf Cable In Culverts With Hdpe Pipes And Clamps 122 Meters, Laying Of Pijf Cable In Tar Road Cutting With 4 Inches Gi Pipe 87 Meters, Erection Of The Pillar Boxes 5 Nos, Erection Of The Route Markers And Joint Indicators 40 Nos