Lifting & Transportation Of Ash, Soot Etc., Collected In Unit-2 Cd Pass Esp Hoppers And Conveying Lines Of Esp Fly Ash System And Other Areas And Disposal Of The Same At Suitable Place As Per The Instructions Of The Engineer In Charge During The Financial Year 2024-25
Lifting & Transportation Of Ash, Soot Etc., Collected In The Unit-2 Ab Pass Esp Hoppers And Conveying Lines Of Esp Fly Ash System And Other Areas And Disposal Of The Same At Suitable Place As Per The Instructions Of The Engineer In Charge During The Financial Year 2024-25
Supply of Bhel- Microcontroller Vfd And Esp System Q3
Annual Maintenance Work Contract Of Fly, Coarse And Bottom Ash Evacuation System Of Unit -5 And 6 And Esp Internal Works Of Unit -5, 6 And 7 For 2 Years
Preventive And Breakdown Maintenance Of Fgd, Scr And Awrs System And Round The Clock Routine Operation Of Epms Of Esp System Of 1X660mw Htps
Supply Of Make Energo /Kay /Roots /Wam /Kirloskar Fluidizing Air Blowers For Esp System Of Ahp During The Year 2023-24
Annual Maintenance Contract Of Esp And Ash Handling System, Including Dredge Pump House - 2 Of Cpp Boilers.
Overhauling Job Of The Air Washery System For U 5 And 6 Esp Swgr Under Emiph Dept