Supply, Installation, Testing And Commissioning Of Smps Based Integrated Power Supply Ips Sys Tem As Per Rdso Spec. No.Rdso/Spn/165/2012 Ver.-3.0 Along With Surge Protection Device, Status Monitorin G Panel, Spares, Tool Kit, Lmla Battery Consisting Of 55 Plus 5 Cells Cells As Per Rdso Spec. Irs:S-88/2004 Alo Ng With Battery Stand.The Configuration Of Ips Should Be As Per Ncr/Hq Drawing No. Typ/2017 /0002-10 For Ibs With Lc Gate .This Includes Transporation To Consignee Depot, From Consignee Depot To Site. Warranty Period: 3 0 Months After The Date Of Delivery Supply, Installation, Testing And Commissoning Of Smps Based Integrated Power Supply Ipssys Tem As Per Rdso Spec. No. Rdso/Spn/165/2012 Ver 3.0 Aiong With Surge Protection Device, Status Monitoring Panel, Spares, Tool Kit, Lmla Battery Consisting Of 55 Plus 5 Sells Cellsas Per Rdso Spece.Irs:S-88/2004 Along With Battery Stand . The Configuration Of Ips Should Be Per Ncr/Hq Drawing No. Typ/2017/0002-11 For Relay Hu T /Lsc With Aftc, Axle Counter And Lc Gate.This Includes Transportation To Consignee Depot, From Consignee Dep Ot To Site, Installation And Commissioning Of Integrated Power Supply System After Duly Filling Precommissioning C Heck List Jointly By Rdso Approved Vendor And Railway Representative.Item Shall Be Procured Though Store Wi Th Gst, Frieght And Commissioning Charges.This Includes Transporation To Consignee Depot, From C Onsignee Depot To Site. Warranty Period: 30 Months After The Date Of Delivery Supply And Comissioning Of Smps Based Integrated Power Supply System For Interlocked Lc Gate In Re Section As Per Rdso Specn.No. Rdso/Spn/165/2023 Ver. 4. 0 Amdt.1 As Per Drawing Attached Of Along With Battery Set Of 110V/300Ah.This Includes Tr Ansporation To Consignee Depot, From Consignee Depot To Site. Warranty Period: 30 Months After The Date Of Del Ivery Supply Installation Testing And Commissioning Of Smps Based Integrated Power Supply Ips Syst Em, As Per Rdso Spec. No. Rdso/Spn/165/2012 Ver.3.0 Along With Surge Protection Device, Status Monitorin G Panel, Spares, Tool Kit, Lmla Battery Consisting Of 55 Plus 5 Cells Cells As Per Rdso Spec. Irs:S-88/2004 A Long With Battery Stand. The Configuration Of Ips Should Be As Per Ncr/ Hq Drawing No. Typ/2017/0002-06 For Ei Station Up To 04 Lines With Block Panel And Lc Gate. This Includes Transportation To Consignee Depot From Consi Gnee Depot To Site, Installation And Commissioning Of Integrated Power Supply System After Duly Filing Pre Commi Ssioning Check List Jointly By Rdso Approved Vendor And Railway Representative.This Includes Transporation To C Onsignee Depot, From Consignee Depot To Site. Warranty Period: 30 Months After The Date Of Delivery Supply, Installation Testing And Commissioning Of Smps Based Integrated Power Supply System I Ps , As Per Rdso Spec. No. Rdso/Spn/165/2012 Ver.3.0 Along With Surge Protection Device, Status Monitori Ng Panel, Spares, Tool Kit, Lmla Battery Consisting Of 55 Plus 5 Cells Cell As Per Rdso Spec. Irs-S-88/2004 Al Ong With Battery Stand. The Configuration Of Ips Should Be As Per Ncr/Hq Drawing No. Typ/2017/0002-08 For Ei Station Up To 6 Lines With Block Panel And Lc Gate.This Include Transporation To Consignee Depot To Site, Installatio N And Commissioning Of Integrated Power Supply System After Duly Filling Pre Commissioning Checklist Jointly By Rdso Approved Vendor And Railway Representative.This Includes Transporation To Consignee Depot, From Consig Nee Depot To Site. Warranty Period: 30 Months After The Date Of Delivery
Supply of Internal Handling Of Urea In Bagging Plant For The Year 2024 25, 514850 Filling Stitching And Loading Of Filled Urea Bags In Closed Wagons Or Open Wagons Or Trucks Filling Stitching Stacking And Re-Loading Of Filled Urea Bags In Closed Wagons Or Open Wagons Or Trucks Including Placement Or Pushing Of Wagons Delivery Of Empty Bags From Empty Bags Storage Area Cleaning And Reclamation Of Good Urea And Off Grade Urea From Storage System Ie Conveyor Pjd-101 To Pjd-103 Gear Boxes Motors Cleaning And Reclamation Of Good Urea And Off Grade Urea From Reclamation System Ie Conveyor Pjd-106 To Pjd-109 Gear Boxes Motors Scrapping Of Off Grade Urea From Silo Floor And Shifting Or Collecting At An Approved Location In Silo Including Floor Cleaning Or Sweeping Handling Of Off Grade Urea And Dissolving The Same In A Tank Provided In Urea Plant Counting And Weighment Of Sampled Bales Of Empty Bags Unloaded From Trucks And Assistance In Complete Sampling As Directed By Committee