Engagement Of User Fee Collection Agency On The Basis Of Cb Through E-Tender For Thirpali Badi Fp At Ch. 32.350 Existing Chainage/33.850 At Two Lane Flexible Pavement With Paved Shoulder From Km. 3.650 To Km. 58.325 Of Nh-709 In Rajasthan
Dismantling of flexible pavements and disposal of dismantled Materials upto a lead of 1000 mtrs. Stacking serviceable and unserviceable Materials separately. (MoRTH specification : Clause 202) BY MECHANICAL MEANS Bituminous Courses
Formation Of Industrial Layout Including Formation Of Road No.D-11 And Road No.D-12 Of 30M Wide Roads Of Flexible Pavement, Construction Of Rcc Side Drains, Rcc Box Culverts, Rcc Utility Ducts, Rcc Retaining Wall, Drain Crossings, Etc., At Sector-8 Of Phase-3
Formation Of Industrial Layout Including Formation Of Road No. E-10 Of 24M Wide Roads And 30M Wide Roads Of Flexible Pavement, Construction Of Rcc Side Drains, Rcc Box Culverts, Rcc Utility Ducts, Rcc Retaining Wall, Drain Crossings, Etc., At Sector-7 Of Phase-3
Formation Of Industrial Layout Including Formation Of Road No.D-10 Of 30M Wide Roads And 30M Wide Roads Of Flexible Pavement, Construction Of Rcc Side Drains, Rcc Box Culverts, Rcc Utility Ducts, Rcc Retaining Wall, Drain Crossings, Etc., At Sector-6 Of Phase-3
Formation Of Industrial Layout Including Formation Of Roadno.C-05 Of 32M Wide Roads Of Flexible Pavement, Construction Of Rcc Side Drains, Rcc Box Culverts, Rcc Utility Ducts, Rcc Retaining Wall, Drain Crossings, Etc., At Sector-5 Of Phase-3
Formation Of Industrial Layout Including Formation Of 32M Wide Roads And 30M Wide Roads Of Flexible Pavement, Construction Of Rcc Side Drains, Rcc Box Culverts, Rcc Utility Ducts, Rcc Retaining Wall, Drain Crossings, Etc., At Sector-4 Of Phase-3
Formation Of Industrial Layout Including Formation Of Road No C-06 Of 32M Wide Road And 60M Wide Road Of Flexible Pavement, Construction Of Rcc Side Drains, Rcc Box Culverts, Rcc Utility Ducts, Rcc Retaining Wall, Drain Crossings Etc At Sector-3 Of Phase-3
Formation Of Industrial Layout Including Formation Of Road No A-04 Of 60M Wide Road Of Flexible Pavement, Construction Of Rcc Side Drains, Rcc Box Culverts, Rcc Utility Ducts, Rcc Retaining Wall Etc At Sector-2 Of Phase-3
Formation Of Industrial Layout Including Formation Of 60M Wide Road Of Flexible Pavement, Construction Of Rcc Side Drains, Rcc Box Culverts, Rcc Utility Ducts, Rcc Retaining Wall Etc At Sector-1 Of Phase-3
Consultancy Services For Authoritys Engineer For Supervision Of Construction Of 6 Lane Flyover From Khapari Rob To Mihan Existing 4 Lps Road To 6 Lps With Service Road By Flexible Pavement In Section Of Nagpur - Hyderabad In The State Of Maharashtra.
Construction Of 6 Lane Flyover From Khapari Rob To Mihan Interchange And Upgradation Of Existing 4 Lps Road To 6 Lps With Service Road By Flexible Pavement In Section Of Nagpur - Hyderabad In The State Of Maharashtra On Epc Mode