Service Contract For Painting Of Fly Ash System Equipment And Equipments supporting Structure And Piping Of Stage 2 On Supply And Apply Basis
Supply Of Y Piece, Aci Bend And Pipe In Pipe For Fly Ash Conveying System At Ahp, Sikka Tps.
Annual Maintenance Work Contract Of Fly, Coarse And Bottom Ash Evacuation System Of Unit -5 And 6 And Esp Internal Works Of Unit -5, 6 And 7 For 2 Years
Design, Engineering, Manufacturing, Supply Erection, Installation, Testing & Commissioning With One Year O & M Of 02 Two Sets Of Dense Phase Dry Fly Ash Collection/ Conveying / Unloading System With Silos Of Unit No. 3 & 4 Of Gandhinagar Tps On Epc Basis ”.
Expression Of Interest For Infrastructure Development For Increasing Ash Evacuation Efficiency Of Existing Ash Handling System Of Rtps And Utilization Of Fly Ash Through Operating The System On Boot Mode Basis