Supply of Eot Crane, Capacity 45/6T, 19.707 Mtr. Span Center To Center Of Gantry Rail As Per The Attached L Eading Parameters And Technical Specifications Of The Crane. All Specified Parameters Under The Technical Specific Ation Document Should Be Complied With And Must Have Provision Of Synchronisation With Crane/Item 2. Warran Ty Period: 30 Months After The Date Of Delivery
Supply of Design, Supply, Erection, Testing And Commissioning Of Supervisory Control And Data Acquisition Scada System For Provision Of Scada And Rtu Installations Across Various Locations As Per Rdso Specifications Ti/Spc/Rcc/Scada/0133 Or Latest For 25 Kv Ac Traction Power Supply System In Connection With Electrification Work In Northern Railway.. Item No.1 - Designs And Drawings For Scada System For Section Of Delhi, Division, Of Northern Railway As Per Rdso Specification No.Ti/Spc/Rcc/Scada/0133 Or Latest. As Per Explanatory Notes For Schedule Of Quantiti Es Enclosed With The Nit Warranty Period: 30 Months After The Date Of Delivery Item No.2-Supply Erection, Testing And Commissioning Of Rtus As Per Latest Rdso Specification At Sp/Ssp/Gantry As P Er Explanatory Notes For Schedule Of Quantities Enclosed With The Nit. Warranty Period: 30 Months After The Date O F Delivery Item No.3 - Modification/Up Gradation, Testing & Commissioning In Existing Standard Scada Software At Rcc Equipments For Configuration, Integration/ Hooking Up Of Additional Rtus Of Adjacent Section With Master Stations As Per Explanatory Notes F Or Schedule Of Quantities Enclosed With The Nit. Warranty Period: 30 Months After The Date Of Delivery