Custom Bid For Services - Supply Installation Of Retractable Flap Barrier Type Turnstile Gates
Cnb-Rrh Providing And Erecting W Metal Cattle Barrier Along The Track Including Gate To Prevent Cro In Connection With Increasing Speed Up To 160 Kmph In Cnb-Rrh Section
Providing And Erecting W Metal Cattle Barrier Along The Track Including Gate To Prevent Cro In Connection With Increasing Speed Upto 160 Kmph In Ddu-Pryj Section
Supply Of Electrically Operated Lifting Barrier Complete Set Suitable For 24V Dc, Supply With Hand G Enerator Back Up & Motorized Boom Locking Arrangements As Per Rdso Spec. Spn/208/2012 With Latest Amend Ment. One Set Consisting Of 2 Nos. Of Lifting Barrier Pedestals, Each With 8 Contact Circuit Controller With Top Roller T Ype Limit Switches, Hand Crank, 2 Electric Motors, 24Vdc Of Capacity Suitable To Operate Barriers Upto 32 Long Boo Ms, 2 Nos. Of Steel Octagonal Booms Of 32 Feet Length With 2 Nos. Stop Boards, Boom Light Boxes, Ms Counter Wei Ghts And 2 Nos. Of Boom Support With Motorised Boom Locking But Without Fringes Along With Control Panel With But Tons And Indicating Lamps, Motor Connectors And Mcb And Hand Generator 24Vdc To Operate 2 Barriers Of 1 Set . This Includes Supply And Installation Of Gate Hooter - 1 No And Dual Tone Bell /Buzzer With Flasher Arrangement And 20 Watt Horn Working On 24 V Dc/ 110 V Ac- 1 No With All Fixing Arrangements. All Of The Above Items Includi Ng Supply Of Nuts & Bolts, Foundation As Required & Supply Of Cement, Civil Work Materials Etc. Shall Be Done By Th E Contractor For Commissioning Of Gate. Only 230Vac Supply Shall Be Arranged By The Railway In Nearby Relay Roo M. The Complete Electric Lifting Barrier Set Shall Confirm To Rdso Spec No. Rdso/Spn/208/2012 With Latest A Mendment. Inspection - Rdso. Along With Spares & Tool Kit Mentioned In Rdso Spec. Spn/208/2012 Clause 10. 1 & 10.2 As Below - Following Spares Shall Be Supplied Alongwith Each Set 02 Nos. Of Electriclifting Barrier.I Stee L Boom - 1 No. Complete.Ii Belt - 1 No.Iii Crank Handle - 1 No.Iv Motor Contactor - 1 No.V Motor Protection Mcb- 1 No.Vi Push Button Complete- 2 Nos.Vii Limit Switch - 3 Nos. 1 Lever Type And 2 Top Roller Typeviii Fuses Used - 2 Sets- Tool Kit Consisting Of Standard Sizes Of Wrench/ Spanner And Allen Keys Shouldalso Be Supplied With Each Set 02 Nos. Of Electric Lifting Barrier. Warranty Period: 30 Months After The Date Of Delivery
Part Supply Of Material And Execution Of Indoor-Outdoor Work Related To Provision Of Electronic Interlocking And Msdac Based Automatic Block Signalling System Between Bhiwani City-Dobh Bahali In Connection With Doubling Of Bnw-Dbhl Section Of Bikaner Division Of North Western Railway. The Work Involves Provision Of New Electronic Interlockings At Bamla, Kalanaur Kalan, Lahli Stations And At Seven Auto Signalling Huts For Controlling Of Auto Signals And Interlocking Of 14 Nos Of Mid-Section Lc Gates. The Work Includes Modification In Existing Ei Of Bhiwani City M/S Kyosan Make Centralized Ei And Dobh Bahali M/S Medha Make Distributed Ei. The Work Also Includes Provision Of Dual Msdac And Other Associated Works Like Trenching & Laying Of Signalling And Telecom Cables In Pre-Fabricated Ducts/Dwc/Gi Pipes, Supply-Installation Of Point Machines, Apparatus Cases, Electric Lifting Barrier Gate, Signals, Track Circuit Equipment, Earthing Material, Data Loggers, Eld, Facs, Afdas, Iot Based Rdpms, Passenger Amenity Telecom Items Etc
Providing And Erecting W Metal Cattle Barrier Along The Track Including Gate To Prevent Cro In Connection With Increasing Speed Upto 160 Kmph In Rrh-Tdl Section
Provision Of 4 Units Rb-Iv And 2 Units Rb-Ii Quarters On Replacement Account At Itarsi Passenger Yard Including Electrical Work. B Den/South/Bhopal Section - Improvement To Road Surface And Gate Lodges And Rehabilitation Of Mechanical Boom Barriers At Lc No. 195, 196, 197, 198, 202, 204, 208, 213, 216, 218, 223 In Khandwa-Itarsi Section, Lc No. 225 In Itarsi-Nagpur Section And Lc No. 226, 228, 230 In Itarsi
Provision Of Additional Wire Arrangement At Level Crossing Gates For Preventing Ohe Breakdown Caused By Barrier Boom Breakage.
Telecom Work In Connection With 1. Vadodara Division: Replacement Of Mechanical Lifting Barriermlb With Electrical Lifting Barrier Elb At Lc Gate No. 248, 251 And 253 Brc- Ger Section. 2. Vadodara Division: Replacement Of Mechanical Lifting Barriermlb With Electrical Lifting Barrier Elb At Lc Gate No. 262, 266 And 267 Brc-Ger Section. 3. Vadodara Division: Replacement Of Mechanical Lifting Barriermlb With Electrical Lifting Barrier Elb At Lc Gate No. 268, 270 And 271 Brc-Ger Section. 4. Vadodara Division: Replacement Of Mechanical Lifting Barriermlb With Electrical Lifting Barrier Elb At Lc Gate No. 272, 278 And 282 Brc-Ger Section.
Execution Of Work Of Civil Engineering In Connection Replacement Of Old And Worn-Out Electric Lifting Barrier At Interlocked Lc Gate No. 14, 15, 19 & 23 In Hwh-Kgp Section Under The Jurisdiction Of Sr.Den/East/Kgp.