Breaking And Clearing Of Heavy Size Coal Boulders And Shale In Coal Rakes Received From M/S Mcl & M/S Sccl And Coal Clearing On Wagon Tipplers 5 & 6 Grid Hoppers In Operation Division/Chp/Stage- Iii & Iv /Dr.Nttps On Emergency Basis During The Period From 01.05.2024 Or From Commencement Of Work To 30.09.2024 Or Till The Exhaust Of Quantities
Supply And Stacking Of 50 Mm Gauge Hard And Durable Machine Crushed Stone Ballast At Washim Whm Ballast Depot And Loading The Same Into Hopper/Traffic Ballast Wagon By Mechanical Means Under Aden/Aks Jurisdiction For Completion Period 18 Eighteen Months Including 03Three Months Mobilization Period.
Supply Of 24000 Cum 50Mm Gauge Hard Stone Machine Crushed Track Ballast At Gundabihar Depot Including Loading Into Rly. Wagon/Hoppers And Unloading The Same
Supply of Fixed Glass For Hopper Window Of Lhb Coaches As Per Rcf Drawing No.Lw 54160 Alt.B. Material C Onforming To Rcf Specification Mdts 089 Rev. 03 Warranty Period: 30 Months After The Date Of Delivery
Supply of 3 Completely Assembled Uop Ccr Lock Hopper Regeneration Oxygen Analyser Ai424383 With Probe & Remote C Q3 Mandatory Spares For Ai424383 O2 Analyser Ccr# 2 Lock Hopper Regeneration Q3 Installation & Commissioning For Up Gradation Of Ccr# 2 Lh O2 Analyser Q3
Custom Bid For Services - Assistance For Removal Of Boulders Coal Cleaning Of Hopper Of Feeder Breaker Fb1516 Fb2021 And West Side Of Backup Cleaning Removing Loading Of Coal In Tippers Etc By Engaging Pc 210 Or Equivalent 3D Hydraulic Excavator Fo..
Sinter Plant Esps Hopper Modification
Water Proofing Of Hopper Bottom Tank
Supply of Hopper Door Pinion Bg To Irss Drg.No. W/Dw-201, Alt.No.1. Warranty Period: 30 M Onths After The Date Of Delivery
Supply of Cylinder For Clamp&Hopper With Vito Seal Q3 Viton Seal Kit For Clamp And Hopper- Q3 Cylinder For Clamp And Hopper Q3
The Work Of Repairing / Strengthening Work Of Damaged Seal Trough, Structure & Attending The Water Leakages Of Bottom Ash Hopper Of Unit No . 3, 4 And 5 At Gtps
The Work Of Complete Cleaning Of Empty Wagons At W/T No. 1 To 4, On Railway Tracks And Transporting Of Emptied Coal To Stack Yard Or Manual Hopper At Gandhinagar Tps, As And When Required Basis.
Supplying And Stacking Of Ballast At Nandgaon Ballast Depot, Loading Into Krcl Hoppers, Unloading, Spreading And Boxing Of Ballast In The Jurisdiction Of Senior Regional Engineer, And Senior Regional Engineer, Karwar Sections Rate Quoted Shall Be Excluding Gst. Gst Shall Be Payable As Applicable.
Supplying And Stacking Of Ballast At Sindhudurg Ballast Depot, Loading Into Krcl Hoppers, Unloading, Spreading And Boxing Of Ballast In The Jurisdiction Of Senior Regional Engineer, Ratnagiri And Senior Regional Engineer, Karwar Sections Rate Quoted Shall Be Excluding Gst. Gst Shall Be Payable As Applicable.
Supplying And Stacking Of Ballast At Nandikoor Station Yard And Loading Into Krcl Hoppers For Ctr Works Under Sen/Udupi Section In Senior Regional Engineer, Karwar Region Of Konkan Railway Rate Quoted Shall Be Excluding Gst. Gst Shall Be Payable Extra As Applicable.
Regular Repairing And Maintenance Work Of Damaged Grizzly, Hopper And Other Miscellaneous Work Of Trs-1, Trs-2 And Trs-3 Of Chp For A Period Of 365 Days.
Cleaning And Lifting Of Poked/Dumped Ash Beneath And Surrounding Of Esp Hoppers And Loading To The Open Trucks Of Brick Manufactures /Cement Companies During The Year 2024-25
Removal And Transportation Of Spilled Over Ash Under Esps, Silos, Under Hydrobins Bottom Ash Hopper Area, To The Designated Area As Of Unit-7 Boiler Or Designated Area Within The Plant Premises Of Dr.Nttps, By Trucks/Tractors/Trailers During The Year 2024-25
Supply of Double Sealed Fixed Glass Unit Size: 622X521x18.38 Mm For Hopper Window Of Lh B Coaches, Confirming To Rcf Specification No. Mdts-089 Rev.04 To Rcf Drg No. Lw54160 Alt : B War Ranty Period: 30 Months After The Date Of Delivery
Supply & Loading Into Railway Wagons/ Hoppers 60000 Cum Of 50 Mm Size Machine Crushed Hard Stone Track Ballast At Bakudih/Barharwa/Pinargaria/Pakur/Rajgram/Taljhari Quarry Siding For Rnc Division Measurement Will Be Done At Destination.