Procurement Of Hydraulic Insulator Testing Jig For Tensile Load Testing Of 25Kv Porcelain And Composite Insulator As Per Rdso Spec.No.Ti/Spc/Ohe/Instest/009002/2009 Rev.O Make/Brand: Self. Hsn Code 9024. As Per Clause No. 13.2 Of Rdso Specification No. Ti/Spc/Ohe/ Instest/ 0090 02/2009 Rev.0 With A&C Slip No.1, The Major And Other Critical Dimensions Of The Machine Shall Confirm To Th E Drawing Approved By D.G, Rdso/Lucknow, Or His Authorized Representative Warra Nty Period: 30 Months After The Date Of Delivery
Supply of Goods, Hydraulically Regulated Universal Door Closer, Tubular Type Type B, Size 2 As Per Is: 35 64/1995 Conforming To Icf Specification No. Icf/Md/Spec - 149, Issue Status -01, Rev-01, Supply Condition St Amping Particulars Of Month And Year Of Manufacturer Should Be Made Available On The Door Closer. Door Close R Should Be Made From Precise Aluminium Die Cast Alloy With Steel Arm. The Door Shall Be Tested For 500000 Five Lakhs Cycles Of Operation.And Shall Be Certified By Underwriters Lab. Incorporated, Usaul Or Any Other Lab A Ccredited By Nabl For Testing And Calibration. Only Oems Or Their Authorised Dealer/Agents Can Participate In The Tender. Warranty Period: 30 Months After The Date Of Delivery
Supply, Installation, Testing & Commissioning Of Hydraulically Operated L Ifting And Swivelling Platform For Overhead Equipment Inspection Car To Specn. No. Icf/Elec/Ohe/001, Rev-01, With Cs-01 And 03. Warranty Period: 30 Months After The Date Of Delivery
Supply, Erection, Testing, & Commissioning Of Hydraulic Spring Testing Machine For Compression Testing/Deflecting Testing And Cycle Testing Of Helical Spring With Respective Load For All Sizes Of Helical Spring Of Ele Ctric Locomotive Bogies. Wag-7 Along With Digital Load Indicator And Length Measurement Device Digital Liner Scal E C/W Readout Console And Data Retrievable And Storage Unit As Per Layout. Drg No. Phte/06/100042. Warrant Y Period: 30 Months After The Date Of Delivery
Supply of Hydraulic Cylinder Barrel Dia :120 Mm And Piston Rod Dia 60 Mm, Made As Per Drawing C&W/Lgd.S K No:1061. Stroke 360 Mm, Barrel Machining And Honing And Piston Rod Machining, Grinding And Plating Should Be D One. Operating Pressure :160 Bar, Testing Pressure 240 Bar. Warranty Period: 30 Months After The Date Of Delivery
Procurement Of 360 Mt Liquid Chlorine With Hydraulic Testing And Maintenance Of Chlorine Tonners At Sgtpp Procurement Of 360 Mt Liquid Chlorine At Sgtpp
Supply of 5207 M1060150203 Gas Chem Nitrogen 99.98 Percent Gr 1 Is1747 M1060950096 Gas Chem Zero Air 99.999 Percent M1060500206 Gas Chem Argon 99.999 Percent Gr 1 Is5760 M1060101007 Gas Chem Oxygen 99.9 Percent Is309 Replacement Of Cylinder Rings Hydraulic Testing Of Gas Cylinder Cylinder Cleaning Charges Painting Charges Of 7M3 Cylinders Replacement Of Valve Assembly Replacement Of Valve Spindle
Supply Of Sealing Ring 60.5 For Hp Control Valve - Drawing No 1122305000-0-4, Part No - 9, Sealing Ring For Hpcv Control Valve Testing Device - Drawing No 1140205600-1-2, Part No - 35, Sealing Ring For Ipcv Control Valve Testing Device - Drawing No 1140405600-0-4, Part No - 37, Sealing Ring For Electro Hydraulic Converter - Drawing No 11142211000-0-4, Part No - 9, Sealing Ring For Valve Block Assembly - Drawing No 1144005000-3-5, Part No - 53, Sealing Ring 11 For Pilot Valve - Drawing No 1323805000-0-5, Part No - 29, Sealing Ring A21x26 For Hp Shaft Sealing - Front - Drawing No 1050509000-0-17, Part No - 24, Sealing Ring A21x26 For Ip Outer Casing - Drawing No 1060136000-0- 9, Part No - 9, Sealing Ring A21x26 For Hp Front Bearing Pedestal - Drawing No 1160127000, Part No - 29, Sealing Ring Dia 25X48x11.5 For Tdbfp Hp Governing Valve Assembly Drawing No C03051900035-00 Part No 52, Sealing Ring A50x57 For Interceptor Valve - Iv - Drawing No 11132036000-1-0, Part No - 24, Sealing Ring A56x64 For Esv Servomotor - Drawing No 1140127000-2- 19, Part No - 40, Pin Cyl A40h8x95 For Hp Inlet Assembly - Drawing No 11051409000-0-7, Part No - 5, Etc
Supply And Commissioning Of Hydraulic Insulator Testing Jig With Digital Display For Tensile Load Testin G Of 25 Kv Porcelain And Composite Insulators As Per Rdso Spec.Ti/Spc/Ohe/Instest/009002/2009Rev.0 With A&C Slip No.110/16Or Latest. Warranty Period: 30 Months After The Date Of Delivery
Retender Supply, Installation, Commissioning And Testing Of Hydraulic Goods Lift For Yogurt And Paneer Section At Dudhmotisagar Dairy, Dharuhera.
Retender Supply, Installation, Commissioning And Testing Of Hydraulic Goods Lift For Uht Plant At Dudhmansagar Dairy, Manesar.
Hydraulic Testing Of Hydrogen Gas Cylinders 256 Nos. Along With Peso Petroleum And Explosives Safety Organization Certified Testing Certificate
Servo Hydraulic, Pneumatic Testing Machine With Integral Temperature Controlled Cabinet With Test Attachments
Supply Of Gas, Chem, Carbon Dioxide, 99.8 Percent, 25-35Kg, Gas, Chem, Nitrogen, 99.999 Percent, Is1747, Hydraulic Testing Charges For Co2 Cyld, Cylinder Valve Replacement For Co2, Spindle Replacement For Co2 Cyl, Gland Nut For Co2 Cyl, Cylinder Cap For Co2, Neck Ring For Co2 Cyl, Bottom Ring For Co2 Cyl, Hydraulic Testing Charges For N2 Cy, Cylinder Valve Replacement For N2 Cyl, Spindle Replacement For N2 Cyl, Gland Nut For N2 Cyl, Cylinder Cap For N2 Cyl, Neck Ring For N2 Cyl, Bottom Ring For N2 Cyl
Refilling, Hydraulic Testing & Pressure Filling Of Abc Type Stored Pressure Fire Extinguishers In C&W Depot For 02 Years
Supply of Concomitant Accessories As Per Clause 7 Of Specification. Computerized Universal Testing Machine, Servo Hydraulic Controlled With Provision Of Testing Mec Hanical Properties Of Various Samples Of Ferrous And Non-Ferrous Materials, Metals And Alloys. It Should Be Desi Gned To Carry Out Multifunctional Test As Per Rwf Specification No. Rwf/M&P/2023-24/Utm-20T, With Compreh Ensive Warranty Of 24 Months From The Date Of Commissioning. Annual Maintenance Contract For The Above Machine For A Period Of Five 5 Years Post Warranty As Per Clause 13 Of Specification. Warranty Period Is 24 Mon Ths From The Date Of Commissioning Warranty Period: 2 Years, Amc Period: 5 Years, Rate Of Discounting: 10 % Consumables For Two Years As Per Clause 9 Of Specification.
Procurement Of Servo-Hydraulic/Pneumatic Testing Machine
Work Of Comprehensive Annual Maintenance Contract Camc Of Servo Hydraulic Shock Absorber Testing Machine For Lhb Damper & Icf Shock Absorber Qty-02 At Tool Shop Of Judw/Nr For A Period Of Three Years I.E. 12 Quarters.
Supply of All Concomitant Accessories Of Computerized Universal Tensile Testing Machine Servo Controlled With Hydraulic Grips Of Capacity 60 Ton As Per Clause No.4.3 Of Specification No. Plw/Lab/M&P/Utm-60T Upl Oaded. Warranty Period: 30 Months After The Date Of Delivery Computerized Universal Tensile Testing Machine Servo Controlled With Hydraulic Grips Of Capacity 60 Ton As Per Specification No. Plw/Lab/M&P/Utm-60T Uploaded. Warranty Period: 30 Months After The D Ate Of Delivery
Supply Of Spare Parts For Shock Abzober Testing Machine Plant No-1034 1 Hydraulic Fix Pump Model No P Vr50-Ff51, Make -Yuken 2 Unloader Relief Valve ?Edg-01-V-H-1-Pn-T-11-50, Make -Yuken 3 Pressure Gaug E-210Kg/Cm2, Make- Mass 4 Solenoid Operated Dc Valve- Dsg-01-3C4-324-N1-50Make-Yuken 5 Pilot Oper Ated Check Mod Valve Mpw 01, Make-Yuken 6 Suction Stainer Model No-Sc3-70, Make-Epe 7 Pressure Line Filter-450Le0030, Make-Epe 8 Return Line Filter-Hfr-20-10B-025, Make-Hydorline 9 Transducer Model No-90 610-T-3Tf, 90Mm Dia, Make-Adi Artech One Set Consists 09 Item With Different Quantity As Per Annexure A & B Item Should Be Purchase From Oem Or Authorized Firm Only And Certificate Should Be Provide At The Time Of Su Pply. Items Guarantee/Warranty And Test Certificate Provide At The Time Of Supply. Warranty Period: 30 Months After The Date Of Delivery