Day-To-Day Works For Shifting Of Pump Motor Sets, Extension/ Shifting Of Pipelines, Laying And Jointing Of Pipelines And Other Associated Works Related To Lk-2E And Lk-2W Quarry Sump On As And When Required Basis For A Period Of One Year At Dep
Supplying And Laying Of Water Supply Distribution Line Accross Street No. 353 Near Tank No 17 And Back Up Line From Distribution Pipe Line Of Cbd For Supply Of Drinking Water To Plot No. 11A/25 11A/25/1 For Haj Pilgrims In Respect Of Haj Operatio
Laying / Fitting Of Pipes / Any Other Type Of Work In Case Of Urgent Exigency Part-B By Way Of Supplying / Fixing Of Ros And Gensets From Pahalgam Sub-Divisional Store To Different Stations By Way Of Engagement Of Labs And Ponies And Back To Su
Laying U/G Pipeline Of Outlet Rd 51850/R Of Raika Feeder Disty
Repair & Maintenance – Infrastructure Assets During The Year 2023-24., Sub-Head- Supplying & Laying Of Dwc Pipe & Lt Cable Of 16Sqmm/4C For Street Light Poles In Jor Bagh Inner Area
Supply And Installation Of Network Switches And Routers - 48 Port Edge Switch Lot Of 29 Nos., 24 Port Edge Switch, Network Routers, 12-Core Outside Plant Cable, 48F Liu, 1U, Lc Mm, 24F Liu, 1U, Lc Mm, 12F Liu, 1U, Lc Mm, Lc-Lc Style Multimode Duplex Patch Cord, Lc-Lc Multimode Duplex, 10G Sfp Plus Mm Fiber Modules, Cat 6 Utp Cable Box 300M, Cat-6 Mounting Cords 7 Feet, Cat-6 Mounting Cords 4 Feet, 24 Port Loaded Jack Panel Straight, 15U Wall Mount Rack With Accessories, 1U Pvc Cable Manager, 25 Mm Pvc Pipe, 40Mm Hdpe Pipe, 32 Mm Reinforced Gi Flexible Pipe, Route Marker Cast Iron, Maintenance Pit With Cover, Pvc Accessories, 9U Wall Mount Rack With Accessories, Fiber Cable Laying, Fiber-Multi Point Termination, Soft Soil Digging Upto 3 Feet, Hard Soil Digging Upto 3 Feet, Installation Of 40 Mm Hdpe Pipe, Installation Of 25 Mm Pvc Pipe, Installation Of 32 Mm Gi Pipe, Installation Of Route Marker, Fixing Of Maintenance Pit, Rack Dressing And Labelling, Installation Of Rack And Replacement, Jack Panel Termination
Construction And Commissioning Of 200Mm Dia Tubewell 06 Nos And Laying, Jointing Of Pipe Line, At Uwss Including All Material With 1 Year Defect Liability Period
Steel Pipeline Laying And Associated Works
Providing And Fixing Of 4 Inch Dia Heavy Duty Gi Flange To 2000 Mtrs. 334 Nos. Gi Pipes At R-6 Mines, Ncph Colliery, Ncph Sa. ,Transportation, Laying And Installation Of 4 Inch Dia Gi/Ms Pipes 3800 Mtrs. From Surface To Cm Panel At R-6, Ncph Sa
Laying And Jointing Of M.S/G.I. Pipelines Of Nominal Dia. 6Inch, 8Inch And 10Inch For Dewatering Of Sumps At Sec.-I And Sec.-Iipatches Of Rajrappa Project For Upcoming Monsoon Preparation
Supply & Installation Of Foot Operated Ss-304 Emergency Eye / Face Wash Including Laying Of Cpvc Internal Or External Pipeline In Required Dia Along With El Bow, Bend, Tee, Labour For Masonary Work Including Etc Complete As Per Site. Pipe L Ength Up To 6 Mtr. Warranty Period: 30 Months After The Date Of Delivery
Implementation Of Centralised Internet Based Network For Biometric Attendance System - L2 Managed Switch With 8 X Ge Ports, 2 Sfp Ports, Supporting Poe, 8Xrj-45, Sfp Sm Module Transceiver, 13.56 Mhz Contactless Rfid Smart Card, 32 Channel Nvr With 4K Support And Hdd Slots, 5 Mp Ir Dome Camera 4.0 Mm Lense, 8 Tb Internal Hard Drive Sata 6 Gbs 256 Mb Cache 3.5, Ethernet Lan Surge Protector For Camera, 4 U Network Rack, 6 U Network Rack, Fiber Patch Cord Sc-Lc, Fiber Patch Cord Sc-Sc Upc, Cat 6 Utp Cable, Conduit Pipe 1, 43 Hd Display, Hdmi Cable 5 Mtrs, Laying Charges Of Cat 6 Utp Cable, Laying Charges Of Conduit Pipe, Network Implementation And Configuration Boq Title/?????????% Implementation Of Centralised
Laying Of M.S.Pipe Line 12 Inch 300 Mm Dia In Tunnel And M.S. Pipe Line 20 Inch 500 Mm Dia From Service Shaft Winder To Mines Change House In Kcc Plant Area And Sump No.2 In Magzine Area
Supply of Dwc Pipe With One Snap Fit Coupler&Oring Cinfirming To Is-14930 Part 2:2001Non Metalik, Norma L Duty, Piliable, Without Protection Against Chemical Attack And Fire Resistant, Anti Rodent, In 6 Meter Length Of Size 120 Mm Outer Dia& 100Mm Innerdia Warranty Period: 30 Months After The Date Of Delivery Plb Hdpe Telecomm Ducts 40/33Mm Dia For Each 200Mtr Coil In Gray Colour With Preinstalled Rop Es For Using Optic Fibre Cable Laying Outer Dia-40Mm, Inner Dia- 33Mm, Wall Thickness-3.5Mm Warranty Peri Od: 30 Months After The Date Of Delivery
Installation Of Pump-Motor Set Along With Laying And Jointing Of Pipeline For Dewatering Purposes At Shriram Coal Face At Dipka Expansion Project.
Replacing The Faded Glass Panels And Its Corroded Frames Surrounding The Capsule Lift And Laying Gi Pipe For Cctv Network And Connected Works General High Court
Supply And Laying Of 150Mm, 100Mm Dia C Class Ms Pipes Line For Extension To The Present Fire Fighting Line From Switchyard Entrance To 33Kv Transformers Yard, Stores Godowns And Scrap Yard Area, Providing 65Mm Ms Single Hydrant Posts, Stand Mounting Type Ms Hose Cabinets With 2Nos Rrl Fire Delivery Hose & 1 No. Ss Branch Pipe With Nozzle Ss-304, Gate Valves, Support Structures Etc At Pches.
Laying Of Pipeline From Existing Bore Well Along Gouraram Raod To 90Kl Ohsr In Manganoor V & Gp Of Bijnapally Mandal
Supply of Installation Of 40 Nos Split Ac In Bsnl Dktd 591 Dismantling Of Faulty 1.5 Tr Split Ac Transportation Of 1.5Tr Sac Units 40 Nos Installation Of 1.5 Tr Ac Supplying And Fixing Outdoor Stand For 1.5 Tr Ac Supplying And Fixing 2Way Db With Mcb Supplying And Fixing Refrigerant Pipe Supplying And Laying 3Core 2.5 Sqmm Chord Wire Supplying And Fixing 63 Mm Rigid Pvc Pipe Supplying And Fixing 20 Mm Pvc Pipe Supplying And Fixing 63 Mm Reinforced Pvc Pipe
Empanelment For Lmc Including Gi Installation Works, Laying Of Pe Pipeline Including Associate Works For City Distribution