Lift Shaft Tenders

(Select any tender from the list to send an email)
Ref. No #31665661 Central Government/Public Sector Live

Supply of Bolt Cylinder G.K. For Godrej Fork Truck Cap. 3-T & 5-Ton :Confor Ming To Part No. Mh49270549 Of M/S. Godrej. Warranty Period: 12 Months After The Date Of Delivery Uom 1 Each - Brake Shoe F.C. For Godrej Fork Trucks. Conforming To P Art No. Mh2368674 Of M/S. Godrej. Warranty Period: 12 Months After The Date Of Delivery F.C. Wheel Cylinder Assy. Rh For Godrej Fork Truck Capacity 03-Ton .C Onforming To Part No. Mh38700124 Of M/S. Godrej. Warranty Period: 12 Months After The Date Of Delivery Strainer Assy. For Godrej Fork Truck Capacity 03-Ton Conforming To Part No. Mh39600085 Of M/S. Godrej. Warranty Period: 12 Months After The Date Of Delivery Snap Ring For Godrej Fork Truck Cap. 3 Ton Conforming To Part No. M H02010124 Of M/S. Godrej & Boyce Warranty Period: 12 Months After The Date Of Delivery Bearing Needle For Godrej Fork Truck Cap. 03- Ton Conforming To Par T No. Mh54100343 Of M/S. Godrej & Boyce Warranty Period: 12 Months After The Date Of Delivery Idler Lock Plate For Godrej Fork Truck Cap. 03- Ton .Conformin G To Part No. Mh02010984 Of M/S. Godrej & Boyce Warranty Period: 12 Months After The Date Of De Livery Assy Brake Line Lh - Gx For Godrej Fork Truck Conforming To Part No. Mh02032498 Of M/S. Godrej & Boyce Mfg. Co. Warranty Period: 12 Months After The Date Of Delivery Piston Ring Set Kit For Godrej Fork Truck Capacity 03-Tonconformin G To Part No. Mh02093730 Of M/S. Godrej & Boyce Mfg. Co. Warranty Period: 12 Months After Th E Date Of Delivery Tp 3044 Convtr Pump Dowty - Gx For Godrej Fork Truck .Conforming T O Part No. Mh97545873 Of M/S. Godrej & Boyce Mfg. Co. Warranty Period: 12 Months After The Da Te Of Delivery Circlip External 16 Mm For Godrej Fork Truck Cap 3 Ton Conforming T O Part No. Mh53501653 Of M/S Godrej & Boyce Mfg. Co. Warranty Period: 12 Months After The Dat E Of Delivery Bush 02251741 For Godrej Fork Truck Cap 03 Ton .Conforming To Part No. Mh02525792 /Mh02234513 Of M/S. Godrej & Boyce Mfg. Co. Ltd. Warranty Period: 12 Months After The Date Of Delivery

Location
Punjab
Due Date
03 May, 2024
Amount
Refer Document
Ref. No #31647288 State Government Live

Procurement Of Rs Items. Fixture For Intermediate Gear Drive Unit Of Rs-2 Train Description: 1. Fixture: 1 No. 2. Stand For Fixtur E: 1 No. 3. ing Arrangement: 1 No. 4. Special Spanner Small: 1 No. 5. Special Spanner Big: 1 No. 6. I-Bolt: 1 N O. 7. Pinion Special Tool: 1 No. 8. Protection Cover For Pinion Gear: 1 No. Make-Ninethray, Tew Or Simil Ar Hydraulic Trolley For Battery Box Replacement In Rs-2 Trains. A Specification Of Hydraulic Trolley Dimensionlxb - 105X56 Cm, Load Capcity Staic & Moving -02 Ton Capacity, Minimum Time Upto Which Hydra Ulic Trolley May Kept On Load- 24X7 Hrs, ing Hight- 4 Ft., Material- Ms, Plate Thickness- 3 Mm Operation-Manual With Hydraulic Assembly Finishing- 01 All The Joints, Welding Etc Are Done With Good Finishing. 02 Trolley Shall Be Painted With High Quality & Durable Primer And Paint. Warranty Period- 01 Year Design Approval- Vendor Has To Ta Ke The Design Approval Before The Manufacturing Of Trolley. ing Table Shall Be Pallet Type Manual Operated, P Ainted With Primer And Paint Bminimum Accessories To Be Used In The Hydraulic Trolley Wheelhigh Quality, H Eavy Duty, Durable & Standard Make- 04 Set Front Two Set For Steering Purpose Brake Application On 2 Wheels Hydraulic Cylinder- As Per Design Requirement Brake Application By Hand Feature Should Be Provided. Manufact Urer Tag With All The Required Information Like Manufacturer Name, Year Of Manufacturing, Capacity, P.O No., Do S & Dont Any Others If Any- 01 Nos. Operating Assembly- At Suitable Height. Any Other Accessories- As Per Req Uirement

Location
Delhi
Due Date
02 May, 2024
Amount
Refer Document
Ref. No #31635757 Central Government/Public Sector Live   GeM Tender

Supply Of Ste Mode On Beml - Rotating Joint, Lv1 Wzt-3 170-33-158 Washer, Lv1 Wzt-3 170-33-032Sb-1 Float Valve, Lv1 Wzt-3 Kd247-26-01 Spanner Connector, Lv1 Wzt-3 Kd247-21-01Z Bracket Support Roller, Lv1 Wzt-3 170-70-071Sb Outer Starting Gp, Conductor L 7.5M, Lv1 Wzt-3 170-85-002 Washer, Lv1 Wzt-3 D35- 04-241 Washer, Lv1 Wzt-3 Gp-02-07 Medium Disc 105, Lv1 Wzt-3 170-105-266 Spring, Lv1 Wzt-3 Pn-90 M73092 113 Seal Ring Nbr 80-S-11, 3X2, 4, Lv1 Wzt-3 170- 45-251 Adjusting Washer, Lv1 Wzt-3 Pn-85 M-82105 14 Bolt M 6X12-8.8-A Fe Zn8c, Lv1 Wzt-3 Bn-77 5410-12 4 Gassket 2-16, 2X20x2, 5, Lv1 Wzt-3 170-102-014 Washer, Lv1 Wzt-3 170-104-068Sb-B Pipe, Lv1 Wzt-3 Pn 85 M82242 4 Bolt M 8X25-8.8-A Fe Zn8c, Lv1 Wzt-3 170.105.004 Toothed Wheel, Lv1 Wzt-3 Pn-86 M-82144 Nut M12x1.25-8-B Fe Zn8c, Lv1 Wzt-3 Sk-0.74.19 Rubber Pad 1X25x34, Lv1 Wzt-3 60-67-036 1 Washer, Lv1 Wzt-3 170-01-086-Sb-1 Assembly Line, Lv1 Wzt-3 Pn-90-M-73092 12 Seal Ring Nbr 90-S-110X7.5, X2 Wzt3 Misc-625-70-005Z Fuse Board, Lv1 Wzt-3 Kd247-07- 02 Thrust Disk Dia 76, Lv1 Wzt-3 170-105-085-1 Socket, Lv1 Wzt-3 Din-3017 2 Band Tarro 70-90 13- C10 W1, Lv1 Wzt-3 Td50-05-009 Closing Sleeve, Lv1 Wzt-3 Wt-86 95 Gasket 1-14, 2.20X2.5, Lv1 Wzt-3 Sk-O52-83 Tab Washer 10, Lv1 Wzt-3 Pn-85 M - 82242 Bolt M8x25-8.8-A Fe Zn8c, Lv1 Wzt-3 170-105-040Sb Or 624- 105-040Z Clutch Pressure Plate, Lv1 Wzt-3 170-04- 415 Right Frontal , Lv1 Wzt-3 Pn-77 M-82008 3 Spring Washer Z 20, 5 Fe Zn9c, Lv1 Wzt-3 Pn-78-M82005 1 Washer 10, 5 Fe Zn9c, Lv1 Wzt-3 170-52-002 Sb Bolck Of 1St Right Wheel, Lv1 Wzt-3 B71-43-009-2 Or A2fm28 61W-Vzb030 Pump Pnsz-40 0R Hydraulic Engine, Lv1 Wzt-3 170-03-030-Sb Mandrel Unit, Lv1 Wzt-3 Kd247-05-01 Spanner For Fan Hub Nut, Lv1 Wzt-3 D35-04-243 Ring, Lv1 Wzt-3 D35-04-221 Epicyclic Gear, Lv1 Wzt-3 B71-74-113 Washer, Lv1 Wzt-3 B71-29-112Z Pipe Assy, Lv1 Wzt-3 9683-0838 ing Sling, Lv1 Wzt-3 170-107-050Sb-A Switch With Bracket, Lv1 Wzt-3 170-01-247-2 Spring, Lv1 Wzt-3 170-105-056 Clutch Pressure Plate, Lv1 Wzt-3 170- 105-049 Gear, Lv1 Wzt-3 170-105-032 Clutch Pressure Plate, Lv1 Wzt-3 170-104-016-Sb-1 Distributor With Electro Limit Gauge

Location
Maharashtra
Due Date
07 May, 2024
Amount
Refer Document