Design, Manufacturing, Supply, Installation, Testing And Commissioning Of Lot-1 Heavy Duty Machine Room Less Elevators, Lot-2 Escalators For Phase-2 Of Metro Rail Project
Supply of Test Sequence Switch As Per Metro Railways Drg. No. Mr/Poh/Ac 7-5-0200 W Arranty Period: 30 Months After The Date Of Delivery Load Weighing Switch As Per Metro Railways Drg. No. Mr/Poh/Ac 7-5-0201 W Arranty Period: 30 Months After The Date Of Delivery
Ms Railing Work For Parking Area And Lawn Area At Ground Level In Benniganahalli Jtpm, K.R.Puram Kram, Singayyanapalya Mdvp, Garudacharpalya Gdcp, Hoodi Junction Dkia And Seetharampalya Vwia Kundanahalli Kdnh, Nallurahalli Vdhp, Satya Sai Hospital Sshp, Pattandura Agrahara Itpl, Kadugodi Kdgd, And Hopefarm Channasandra Uwvl Of Reach-1 Extension Metro Stations Of Line-1
Development And Operation Of Part Of Bare Shell Structure Demarcated For Property Development At Final Plot No. 499 Of Parvati Tp Scheme At Swargate Metro Station Of Pune Metro Rail Project On Public Private Partnership Basis.
Miscellaneous Civil Works And Annual Maintenance Contract For Civil Works Of Orange Line From Aiims To Subhash Nagar Stations Including Viaduct And Depot For Bhopal Metro Rail Project
Infrastructure Development Works Of Surrounding Kmda Lands In Connection With Removal Of 10 Nos Hutments From The Land Dag No 901, Rl No. 27, Briji Mouza Allotted To Rvnl For Construction Of Metro Railway Station.
Standardisation Of Guard Rail In Dum Dun - Tollygunge Section Of Metro Railway, Kolkata.
Operation And Maintenance Of Sewage Treatment Plant Stp & Effluent Treatment Plant Etp, Gyaspur Depot For Ahmedabad Metro Rail Project – Phase-1
Preparation Of Feasibility Study Report For Construction As Double Decker Flyover Cum Metro For I Corridor-1 From Jp Nagar 4Th Phase To Hebbal Of 29.20 Km Length Ch:0.400 Km To Ch:29.600 Km Approx. Of Phase-3, Ii Corridor-2 From Hosahalli To Kadabagere Of 11.45 Km Length Ch:0.600 Km To Ch:12.050 Km Approx. Of Phase-3 And Iii From Sarjapur To Ibbalur Orr Junction Of 14 Km Length Ch:0.500 Km To 14.500 Kmapprox. And From Agara To Koramangala 3Rd Block Of 2.45 Km Length Ch:16.900 Km To Ch: 19.350 Km Approx. In Phase-3A Corridor Of Bangalore Metro Rail Project
Design, Manufacture, Supply, Installation, Integration, Testing And Commissioning Of Automatic Fare Collection System Including 15 Years Of Comprehensive Maintenance After 2 Years Of Defect Liability Maintenance Period Of Line 4 And Extension Corridor4a Wadala-Kasarvadavali-Gaimukh Of Mumbai Metro Rail Project Of Mmrda.
General Civil Maintenance Work Of Ew R1 Corridor Including Apparel Park Depot, 6 Stations And Viaduct From Apparel Park Ramp To Vastral Gam Dead End Of Ahmedabad Metro Rail Corporation Ltd Phase-1
Supply & Installation Of Wind Ties On Roof Sheet Of Platform, Entry/Exit Structures, Interchange Gallery And Concourse Gallery On Stations Of Ahmedabad Metro Rail Project Phase -1
Supply of 110V Ac Yellow Led Signal Aspect Miniature Type, Including Built In Current Regulator And Additio Nal Circuit For Ecr Operation Retrofittable In Existing Cls Housing Used In Tunnel Used In Kolkata Metro ; Spec R Dso/Spn/153 2023 Rev 5.0, Str: Siq 0204 Ver 0, Yellowsub Item Id: 3100194003 Warranty Period: 30 Months After The Date Of Delivery Supply Of Green Aspect Miniature Type Led For Used In Tunnels In Metro Railway, Kolkata For Rail Way Signalling Pl No: 3100194, Spec: Rdso/Spn/153/2023 Rev 5.0, Str: Siq 0204 Ver 0, Images: Metro Tu Nnel Signal, Sub Item Id: 3100194003 . Warranty Period: 30 Months After The Date Of Delivery Supply Of Green Aspect Miniature Type Led With In Built Current Regulator For Used In Tunnels In Metro Railway, Kolkata For Railway Signalling, Spec: Rdso/Spn/153/2023 Rev 5.0, Metro Tunnel Signal, Sub Item Id: 3100194003 Warranty Period: 30 Months After The Date Of Delivery Red Aspect Led, Miniature Type With In Built Current Regulator For Tunnel Spec R Dso/Spn/153 2023 Rev 5.0, Sub Item Id: 3100194003 Warranty Period: 30 Months After The Date Of Delivery
Consultancy Work For Insurances For Maharashtra Metro Rail Corporation Ltd
Consulting Services Under The Accompanying Measure For The Surat Metro Rail Project, Phase - I
Height Raising Of Existing 110Kv Lonavala Khadki Pune Single Circuit Se1 Overhead Railway Transmission Line Between Metro Pier Location P444.P445, Work Includes Engineering, Supply, Erection, Testing, Commissioning `And Dismantling Of Existing Towers.
Canal Oriented Development Cod From Edachira To Brahmapuram Bridge As Part Of Phase Ii Of Kochi Metro Rail Project
Licensing Of Co-Branding And Inside Advertising Rights Of Taj East Gate And Captain Shubham Gupta Metro Station Of Agra Metro Rail In Upmrc Network As Per Scope Of Work Mentioned In Tender Document.