Earthwork In Filling With Good Earth In Low Land Near Hayat Within The Campus Of Vivekananda Yuba Bharati Krirangan Saltlake, During The Year 2025-26
Work Of Sluice Well Gate Change And Jacketing, Earthwork In Main Dam And Canal, Main Canal Lining, Canal Sectioning, Repairing Of Existing Structures And Construction Of Vrb Etc. Work Of Khaniamba Tank Project
Execution Of Earthwork In Formation, Minor Bridges, Execution Of P.way Linking Works Including Workshop, Supply Of Ballast And Other Allied Works In Connection With Setting Up Of Electric Loco Periodical Over Hauling Poh Workshop At Kalahandi Norla Under Sambalpur Division Of East Coast Railway.
Construction Of Pcc /pever Block Road With Earthwork Form Gobinda Sarkar S House Towords Nikhil Das S House At Kasbamohosh Sansad
Construction Of Pcc /pever Block Road With Earthwork Form Jagen Urao House Towords Bakha Mahammad House At Sushihar Uttar Sansad
Estimate For Restoring Non Patrol Bank By Earthwork Of Minor 5 Of Budhlada Branch From Rd 5000-11300
Construction Of Donli To Punialla Link Road From Km 1st Rd 0 To Km 9th Rd 500 By Way Of Earthwork 1000 Mm Dia Hp Culvert 5 00 Mtr Height Semi Pucca R Wall 15 0 Mtr Height Pucca Edge Wall 2 5 Mtr Height Semi Pucca B Wall And Create Wall
Construction Of Pcc /pever Block Road With Earthwork Form Sushil Oraw House To Gopal Oraw House At Kamalabari Sansad Under Kamalabari-ii Gp
Construction Of Pcc /pever Block Road With Earthwork Form Doli Barman House Towords Noukatu Barman House At Dangapara Sansad Under Kamalabari-ii Gp
Construction Of Donli To Punialla Link Road From Km 1St Rd 0 To Km 9Th Rd 500 By Way Of Earthwork 1000 Mm Dia Hp Culvert 5 00 Mtr Height Semi Pucca R Wall 1 50 Mtr Height Pucca Edge Wall 2 5 Mtr Height Semi Pucca B Wall And Create Wall
Construction Of Earthwork And Murum Blanketing Road From Sewagram Road To Ambadas Zade Farm At Pawanar Tah
Engineering, Procurement And Construction Epc Document For Construction Of New Railway Line From Km 124/400 To 165/380 In Between Bahari And Gondawali Stations Including Earthwork, Minor Bridges, Major Bridges, Important Bridges, Viaduct, Rob Rcc Box Type, Rub/Lhs, Station Building, Tunnels, Track Work And Other Miscelllaneous Works In Connection With Sidhi-Singrauli New Rail Link Project In The State Of Madhya Pradesh.
Work For Construction Of 05 Nos. Major Bridges Br. No. 105/1 Ch.105055.871, 1x30.5 C.g., Br.no. 108/2 Ch. 108604.024m, 2x18.3m C.g., Br.no. 109/2 Ch. 109897.535, 1x12.2m C.g., Br.no.113/1 Ch.113304.815m, 1x12.2m C.g. And Br.no. 113/3 Ch. 113924.665, 3x30.5m C.g. Including Earthwork In Filling, Blanketing Work & Other Ancillary Works B/w Km 103.100-103.233, Km 105.00- 105.180, Km 108.500-108.700, Km 109.800-110.000, Km 113.200-113.400 And Km 113.840-114.040 Of Panna-khajuraho Section Of Lalitpur-singrauli New Bg Rail Line Project.
Construction Of Link Road From Jodhpur Mohalla Road To Lower Jatheli By Way Of Earthwork Cross Drainages Protection Works Gsb Wbm Giii Wmm Bm Pc Crash Barriers And Road Marking Under Nabard Ridf-xxx
Execution Of Gcw Consisting Of Piling Work Earthwork In Excavation Filling Rcc Work In Fdn And Superstructure Etc In Connection With Establishment Of Critical Care Block And Communicable Disease Centre At Agmc, Gbp Hospital Complex Agartala Tripura W