Packing Set Tenders

(Select any tender from the list to send an email)
Ref. No #31643263 Central Government/Public Sector Live   GeM Tender

Supply Of Nut For Cap,, Gasket, Sleeve, Bearing Ball 6205, Seal Ring, O Ring For Bushing, Bushing, Washer For Feed Pump, Shear-Pin Coupling, Inch O Inch Ring Rub3034-71, Dia 4.35X39.7Dn 260124/14238, Washer Intermediate, O Ring Rub3034-71Dia6.3X124.7Artno69270drg260124, Screw Spanner, Ball Bearing, Seal Ring 2390, O Ring, Control Paring Disc, Seal Ring, Bolt, Screw Screw, O Ring, Pin, Snap Ring, Seal Ring, Oil Paper , Screw, Seal Ring, Lock Gravity Ring Mab 103/300, Interactive Washer, Spanner For Oil Drain, , Screw, Gange Glass, Gasket, O Ring,, O Ring, Bushing, , Gravity Disk, Impeller,, Impeller, Screen, Top Bearing, Nut, Gasket, Ball Bearing 6202, Pin, Stud Bolt, , Ball Bearing, Seal Ring, End Shield, Tooth Rim For Flexible Coupling, Spring, Seal Ring, Gauge Glass Oil, Of Spares Of O Ring & Gasket Diapharam Kit, Valve Cone For Mab205, Lock Washer, Worm Wheel, Socket 9/16Inch 1/2Inch, Bushing, Pipe Inlet, , , Worm, Ring Wear, Round Nut Skf Km5, Seal Ring, O Ring, O Ring, Seal Ring, Ring Joint Rulen Gasket, Fixing Plate, Nut For Feed Tube, Spring, Handle, Spanner Socket, Deflector, Bearing Housing, 3-Way Solenoid Valve Normally Closed Conn 1/4 Npt, Socket For Socket Spanner, Glass Level, Screw Lock, Seal Ring, O Ring, Gasket, Pin Taper, Ring Rubber Large For Separator Bowl, Gasket, O-Ring, Plate Elastic, O Ring, Valve Solenoid, Impeller, Gasket, O Ring, Rivet, Friction Pad, Pin, Bowl Spindle, , Bowl Disc, Worm Wheel With Pin, Spring, Buffer, O Ring, O Ring, Seal Ring, Frame Foot, Fan, Labyrinth Ring Holder, Spindle Pulley

Location
Andhra Pradesh
Due Date
09 May, 2024
Amount
Refer Document
Ref. No #31643626 Central Government/Public Sector Live

Supply of Switch Plate Assemblies For Lhb Eog Ac 3-Tier / Humsafar Coaches, As Per Dr Awing: Edml064, Rev-B, Am-4, Corr-1, Table-1B., Instruction: As Per Drawing Warr Anty Period: 30 Months After The Date Of Delivery Switch Plate Assembly Complete For Lhb Eog/Sg Ac 2-Tier Coaches, As Per Dr Awing: Edml064, Rev-B, Am-4, Table-1A, Corr-1, Instruction: As Per Standard . It S Hould Be Ensured That Item Should Not Rub During Transportation. The Item Should Be Packed With Adequate Strength. Transit Damage, If Any, Shall Be At The Cost Of S Upplier. Warranty Period: 30 Months After The Date Of Delivery Switch Plate Assembly Complete With Polycarbonate Cover Frame & Powd Er Coated Steel Plate., As Per Drawing: Edml064, Rev-B, Am-4, Table-8., Instruction: Packin G As Per Drawing Warranty Period: 30 Months After The Date Of Delivery Switch Plate Assembly Along With Mobile Charging Socket For Lhb Scn Co Aches For Wider Window Scn, As Per Drawing: Edml156, Rev-2 1 Comprising Item-110 N Os, Item-210Nos Item-3 10 Nos, Instruction: As Per Drawing Warranty Period : 30 Months After The Date Of Delivery Switch Plate Assembly Along With Mobile Charging Socket For Antyodya Coaches., As Per Drawing: Edml086, Rev-8, Table-2 1 Comprising Of 30 Switch Plates Ite M-110 Nos, Item-210Nos, Item-310Nos, Instruction: As Per Drawing Warrant Y Period: 30 Months After The Date Of Delivery Switch Plate Assembly Compplete Alongwith With Mobile Charging Socket For Lhb Non Ac Chair Car Lwsczcoaches., As Per Drawing: Edml125, Rev-6, Table-1 1 Co Mprising Of Item-1 18 Nos & Item-3 18 Nos, Instruction: As Per Standard . It Should Be Ensured That Item Should Not Rub During Transportation. The Item Shoul D Be Packed With Adequate Strength. Transit Damage, If Any, Shall Be At The Cost Of Supplier. Warranty Period: 30 Months After The Date Of Delivery

Location
Punjab
Due Date
10 May, 2024
Amount
Refer Document