Supply of 1 Cryogenic System Using Liquid Nitrogen Plc+ Hmi Based Control Panel Q3
Supply And Installation Of Plc Control Panel At 50 Ltr Drum Filling Machine
Engineering, Manufature And Supply Of Dc-Exx Drives Along With Plc Panel, Scada For Hmi, Operator Console, Crowd Limit Switch And All Accessories With Complete Cabiling And Wiring, Hoist Brake Assy P.N. 146300A, Swing Brake Assy P.N. 146222Ek, Propel Brake Assy P.N. 146222Em, Crowd Brake Assy P.N. 146222El, Tooth Adapter P.N. Pde55037 C, Wedge P.N. K.1450.01.17, C- Clamp P.N. K.1450.01.16, Tooth Point P.N. Pde53590 8, Dismantling Of Old . Existing System, Installation And Commissioning Of New System
supply of PLC BASED ELECTRODE REGULATION PANEL FOR VAR OF RSP Q3
Supply Of Electrical And Electronics Spares -Plug In Relay, Ssr Relay, Contactor 3Rt-1035-1Ap00, Contactor 3Rt-1024-1Al20, Over Load Relay 3Rv 1936 3Aa01, Over Load Relay 3Rv 2126 1Jb0, Over Load Relay 3Rv 2116 1Bb0, Contactor 3Rt-2026-1Al20, Contactor 3Rt-20235- 1Ap02, Smps, Timer, Panel Cooling Fan, Hmi Siemens 6Av6 647 0Aa113axo, Gts Head Motor Drive, 0.4Kw, Ahpm Ac Drive Vfd007m21a 0.75Kw 1Hp, Vsim Conveyor Drive Vfd-L 0.4Kw, Itc Of Hmi Drive Plc Display For Ahu Unit
Supply of Set Of Regenerative Type Test Benches For 4.5 Kw Alternator And Rru/Erru. Set Consists Of 02 Items- 01 No Each: 1 Manufacturing, Supply, Erection And Commissioning Of Load Testing Panel For 4.5 Kw Alternator With P Lc And Scada As Per The Technical Specification Enclosed.-01 No. 2 Manufacturing, Supply, Erection And Commissi Oning Of Load Testing Panel For 4.5 Kw Rru/Erru With Plc And Scada As Per The Technical Specification Enclosed-0 1 No. Warranty Period: 30 Months After The Date Of Delivery
Supply Installation And Commissioning Of Plc Cpu Module Upgradation In Existing Panel Supply Of Rio Panel 01 For Plant A Technical Specification And Ga Supply Of Rio Panel 02 For Plant A Technical Specification And Ga As Per Annexure Supply Of Rio Panel 01 For Plant B Supply Of Rio Panel 01 For Plant C Technical Specification And Ga As Per Annexure Installation Testing And Commissioning Of Rio Panel