Repair Or Replacement Of Desert Coolers - Replacement Of Water Pump, Replacement Of Water Pipe, Replacement Of Power Cable, Replacement Of Motor, Replacement Of Khus Panel, Replacement Of Capacitor, Replacement Of Grill, Replacement Of Fan Blade, Replacement Of 5 Amp Switch, Replacement Of Plug, Replacement Of Water Distributor Or Socket, Replacement Of Iron Net, Replacement Of Dried Grass, Labour Charge
Repair Or Replacement Of Desert Coolers, Replacement Of Water Pump, Replacement Of Water Pipe, Replacement Of Power Cable, Replacement Of Motor, Replacement Of Khus Panel, Replacement Of Capacitor, Replacement Of Grill, Replacement Of Fan Blade, Replacement Of 5 Amp Switch, Replacement Of Plug, Replacement Of Water Distributor Or Socket, Replacement Of Iron Net, Replacement Of Dried Grass, Labour Charge
Supply of LV7/TATA 4320-003982 PUMP ROTARY POWER DRIVEN,LV7/TMB 2786-1599-9905 STARTER MOTOR 12 V,LV7/TMB 2060-4232-0101 WHEEL CYLINDER REPAIR KIT (BI),LV7/LD CVD-F-4730300 TOOL KIT BAG CANVAS,LV7/TMB 2574-7052-0102 ASSY CANOPY
Repair And Overhauling Of Four 04 Numbers Aqua Make 150 Hp Drainage / Dewatering Submersible Pumps Of Tld-Iv Power Station
Shifting Of Existing Dg, Restoration Servicing Commissioning Of 20 15 Kva Dg Set, Shifting Of Existing 15 Kva Avr, Installation Testing And Commissioning Of 15 Kva 3 Phase 415 Volts Automatic Voltage Stabilizer, Installation Testing And Commissioning Of Bye Pass Cum Lt Panel, Supplying And Fixing 88 Ah Capacity Dg Starting Battery For Base Sanjy 2024 Sites, Shifting Of Dg Parts Of 10 Kva Water Cooled Silent Type Dg Set From Sheesh Mahal To Sanjy 2024 Bts Site Holy Cave, Shifting Of Dg Parts Of 10 Kva Water Cooled Silent Type Dg Set From Panjtarni To Sanjy 2024 Bts Site Sangam, Restoration Servicing Commissioning Of 10 15 Kva Dg Set Installed At Sh Amarnathji Yatra Upper Sites, Supplying And Fixing 88 Ah Capacity Dg Starting Battery For Upper Sanjy 2024 Sites, Supplying And Laying Of 2 Core 10 Sq Mm Pvc Insulated Pvc Sheathed Unarmoured Copper Conductor Cable, Supplying And Fixing Of 63 A Double Pole Side Handle Type On Load Type Change Over Switch, Supplying And Fixing Of Pendent Holder, Supplying And Fixing Of Power Strip Of 6 Amp Rating, S F Of 40 Amp Rating Mcb Type Double Pole Changeover Switch, Replacement Of Faulty 3 Pole Power Contactor, Providing Labour Charges For Repairs Top Overhauling To Faulty Diesel Engine Of 10 15 20 Kva Dea Set, Replacement Of Piston Ring Set For One Piston Required In Major Overhauling Top Overhauling Of 10 15 20 Kva Dg Sets Complete As Required At Sites, Replacement Of Piston Pin, Replacement Of Sleeve Cylinder, Replacement Of Gasket Cylinder Head, Replacement Of O Ring Sleeve Cylinder, Replacement Of Hose Outlet, Replacement Of Hose Inlet, Replacement Of Damaged Faulty Battery Charger, Replacement Of Faulty Stop Solenoid, Repairing Of Defective And Stuck Injector, Repairing And Servicing Of Defective And Stuck Fuel Pump, Repairing Of Defective Self Starter Motor, Repairing Of Defective Charging Alternator Dynamo, Replacement Of Defective Avr Of Alternator, Replacement Of Defective Coupling, Replacement Of Defective Moulded Rectifier In The Excitation Circuit, Supplying Filling Topping Up Of Transformer Oil, Replacement Of Damaged Faulty Burnt Servo Motor 3 Kg Cm, Replacement Of Damaged Faulty Burnt Control Card Of The Avr, Replacement Of Damaged Faulty Burnt Dimmer Coil 60 A, Replacement Of Damaged Faulty Burnt Buck Boost Transformer 5 Kva Rating, Supplying And Laying Of 3 5 X 25 Sq Mm, Round The Clock Operation And Comprehensive Maintenance Rangamore
Supply Of Fuel Feed Pump, Oil Seal, Drive Assy, Solenoid Switch, Brake Lining Rear Wheel, Master Cylinder Repair Kit, Minor Repair Kit Air Compressor, Pull Cable Accelerator, Miain Bearing Upper Normal, Cable Assy Control, Repair Kit Quadruple Sys, Air Compressor Repair Kit, Master Cyl Clutch, Ball Bearing, Nozzle, Valve Relay Air Pressure, Brake Lining Kit, Parts Kit Power Steering
Repair Of Tata Lpt , Front Shock Observer, Front Wheel Bearing, Rear Shock Observer, Rear Wheel Bearing, Break Liner, Wheel Balancing, Liner, Nuts And Bolts, Wheel Bearing Inner, Wheel Bearing Outer, Chamber Packing, Greasing, Wheel Fendor Right, Wheel Fendor Left, Labour Charges For Above Work, Srearing Bushes, Stearing Bearing, Power Stearing Oil, Lathe Work For Fixing, Stearing Liner, Spokes, Head Light Assay, Tail Light Assay, Worn Out Wire, Indicator Lamp, Air Filter, Oil Filter, Rubber Kit, Gear Level Kit, Engine Oil 20W40, Gear Oil, Coolant, Spring Bushes, Break Shoe, Governor Kit, Nozzle Kit, Dove Bush, Mechnical System Of Door Glass Lifting, Battery Cells, Battery Terminals, Battery Leads, Recharging Of Battery Including Refilling Of Electrolyte Solution Having Required Specific Gravity, M And L For Patch Repair Of Body By Denting And Making Good Of Broken And Teared Body Surfaces Including Painting Same Colour Of The Vehicle, Cleaning And Washing Of Vehicle By Pressure Pump And Polishing Of Vehicle
Mechanical Workshop-Carrying Out Zone No. 9-A Area Mechanical Workshop Cwm Complete Building, Cmt Office, Motor Section, Btc Office Complete Building, Shatabdi Gate, I.C. Gate, Model Room, Prs Office, Stationary Room, All Union Office, Cib Office, Main Rpf Post Gate, Pump No.-8, Power House, Andhra Bank, Co-Operative Bank, Saw Mill Shop, New Paint Shop, New Furnishing Shop, Trimming Section, Paint Shop, A.C. Coach Repair Shop, Furnishing-I Shop, Ger Shop, Battery Section, Manufacturing Shop, Coach Wiring Train Lighting Shop & West Traverser, Rcc Tank, Sse/Works Office, General Toilet No. 01 To 05 And 11 To 14, Health Unit, Planning Building Expect Sheds Work All Civil Engineering Work For Maintenance For P.E. 30.06.2025