Protection Relay Tenders

(Select any tender from the list to send an email)
Ref. No #31665389 Central Government / Public Sector Live   GeM Tender

Supply of 6 Motor Abb Rem 615 Q3 Tripping Vajhm23 110Vdc Q3 Vajs13 Q3

Location
Bihar
Due Date
15 May, 2024
Amount
Refer Document
Ref. No #31661509 Corporations/Associations/Others Live   GeM Tender

Supply of 20 Numerical Over Current And Earth Fault Q3

Location
Tamil Nadu
Due Date
13 May, 2024
Amount
Refer Document
Ref. No #31655489 Central Government / Public Sector Live   GeM Tender

Supply of 25 Heavyduty Angle Grinders With Overload With Grinding Wheels Q3

Location
Uttar Pradesh
Due Date
13 May, 2024
Amount
Refer Document
Ref. No #31650177 Corporations/Associations/Others Live

Procurement Of Power Card For Bus Bar , Make-Siemens

Location
Jharkhand
Due Date
01 May, 2024
Amount
24.87 Lacs
Ref. No #31646163 Central Government/Public Sector Live   GeM Tender

Retrofitting Of 30 Nos Of L&T Make Motor Immr Q3

Location
Tamil Nadu
Due Date
08 May, 2024
Amount
Refer Document
Ref. No #31638398 Central Government/Public Sector Live

Supply, Installation, Testing And Commissioning Of Smps Based Integrated Power Supply Ips Sys Tem As Per Rdso Spec. No.Rdso/Spn/165/2012 Ver.-3.0 Along With Surge Device, Status Monitorin G Panel, Spares, Tool Kit, Lmla Battery Consisting Of 55 Plus 5 Cells Cells As Per Rdso Spec. Irs:S-88/2004 Alo Ng With Battery Stand.The Configuration Of Ips Should Be As Per Ncr/Hq Drawing No. Typ/2017 /0002-10 For Ibs With Lc Gate .This Includes Transporation To Consignee Depot, From Consignee Depot To Site. Warranty Period: 3 0 Months After The Date Of Delivery Supply, Installation, Testing And Commissoning Of Smps Based Integrated Power Supply Ipssys Tem As Per Rdso Spec. No. Rdso/Spn/165/2012 Ver 3.0 Aiong With Surge Device, Status Monitoring Panel, Spares, Tool Kit, Lmla Battery Consisting Of 55 Plus 5 Sells Cellsas Per Rdso Spece.Irs:S-88/2004 Along With Battery Stand . The Configuration Of Ips Should Be Per Ncr/Hq Drawing No. Typ/2017/0002-11 For Hu T /Lsc With Aftc, Axle Counter And Lc Gate.This Includes Transportation To Consignee Depot, From Consignee Dep Ot To Site, Installation And Commissioning Of Integrated Power Supply System After Duly Filling Precommissioning C Heck List Jointly By Rdso Approved Vendor And Railway Representative.Item Shall Be Procured Though Store Wi Th Gst, Frieght And Commissioning Charges.This Includes Transporation To Consignee Depot, From C Onsignee Depot To Site. Warranty Period: 30 Months After The Date Of Delivery Supply And Comissioning Of Smps Based Integrated Power Supply System For Interlocked Lc Gate In Re Section As Per Rdso Specn.No. Rdso/Spn/165/2023 Ver. 4. 0 Amdt.1 As Per Drawing Attached Of Along With Battery Set Of 110V/300Ah.This Includes Tr Ansporation To Consignee Depot, From Consignee Depot To Site. Warranty Period: 30 Months After The Date Of Del Ivery Supply Installation Testing And Commissioning Of Smps Based Integrated Power Supply Ips Syst Em, As Per Rdso Spec. No. Rdso/Spn/165/2012 Ver.3.0 Along With Surge Device, Status Monitorin G Panel, Spares, Tool Kit, Lmla Battery Consisting Of 55 Plus 5 Cells Cells As Per Rdso Spec. Irs:S-88/2004 A Long With Battery Stand. The Configuration Of Ips Should Be As Per Ncr/ Hq Drawing No. Typ/2017/0002-06 For Ei Station Up To 04 Lines With Block Panel And Lc Gate. This Includes Transportation To Consignee Depot From Consi Gnee Depot To Site, Installation And Commissioning Of Integrated Power Supply System After Duly Filing Pre Commi Ssioning Check List Jointly By Rdso Approved Vendor And Railway Representative.This Includes Transporation To C Onsignee Depot, From Consignee Depot To Site. Warranty Period: 30 Months After The Date Of Delivery Supply, Installation Testing And Commissioning Of Smps Based Integrated Power Supply System I Ps , As Per Rdso Spec. No. Rdso/Spn/165/2012 Ver.3.0 Along With Surge Device, Status Monitori Ng Panel, Spares, Tool Kit, Lmla Battery Consisting Of 55 Plus 5 Cells Cell As Per Rdso Spec. Irs-S-88/2004 Al Ong With Battery Stand. The Configuration Of Ips Should Be As Per Ncr/Hq Drawing No. Typ/2017/0002-08 For Ei Station Up To 6 Lines With Block Panel And Lc Gate.This Include Transporation To Consignee Depot To Site, Installatio N And Commissioning Of Integrated Power Supply System After Duly Filling Pre Commissioning Checklist Jointly By Rdso Approved Vendor And Railway Representative.This Includes Transporation To Consignee Depot, From Consig Nee Depot To Site. Warranty Period: 30 Months After The Date Of Delivery

Location
Uttar Pradesh
Due Date
15 May, 2024
Amount
Refer Document
Ref. No #31630829 State Government Live

Procurement Of Numerical Under Voltage s

Location
Andhra Pradesh
Due Date
30 Apr, 2024
Amount
Refer Document
Ref. No #31628034 Central Government/Public Sector Live

Supply Of Electrically Operated Lifting Barrier Complete Set Suitable For 24V Dc, Supply With Hand G Enerator Back Up & Motorized Boom Locking Arrangements As Per Rdso Spec. Spn/208/2012 With Latest Amend Ment. One Set Consisting Of 2 Nos. Of Lifting Barrier Pedestals, Each With 8 Contact Circuit Controller With Top Roller T Ype Limit Switches, Hand Crank, 2 Electric Motors, 24Vdc Of Capacity Suitable To Operate Barriers Upto 32 Long Boo Ms, 2 Nos. Of Steel Octagonal Booms Of 32 Feet Length With 2 Nos. Stop Boards, Boom Light Boxes, Ms Counter Wei Ghts And 2 Nos. Of Boom Support With Motorised Boom Locking But Without Fringes Along With Control Panel With But Tons And Indicating Lamps, Motor Connectors And Mcb And Hand Generator 24Vdc To Operate 2 Barriers Of 1 Set . This Includes Supply And Installation Of Gate Hooter - 1 No And Dual Tone Bell /Buzzer With Flasher Arrangement And 20 Watt Horn Working On 24 V Dc/ 110 V Ac- 1 No With All Fixing Arrangements. All Of The Above Items Includi Ng Supply Of Nuts & Bolts, Foundation As Required & Supply Of Cement, Civil Work Materials Etc. Shall Be Done By Th E Contractor For Commissioning Of Gate. Only 230Vac Supply Shall Be Arranged By The Railway In Nearby Roo M. The Complete Electric Lifting Barrier Set Shall Confirm To Rdso Spec No. Rdso/Spn/208/2012 With Latest A Mendment. Inspection - Rdso. Along With Spares & Tool Kit Mentioned In Rdso Spec. Spn/208/2012 Clause 10. 1 & 10.2 As Below - Following Spares Shall Be Supplied Alongwith Each Set 02 Nos. Of Electriclifting Barrier.I Stee L Boom - 1 No. Complete.Ii Belt - 1 No.Iii Crank Handle - 1 No.Iv Motor Contactor - 1 No.V Motor Mcb- 1 No.Vi Push Button Complete- 2 Nos.Vii Limit Switch - 3 Nos. 1 Lever Type And 2 Top Roller Typeviii Fuses Used - 2 Sets- Tool Kit Consisting Of Standard Sizes Of Wrench/ Spanner And Allen Keys Shouldalso Be Supplied With Each Set 02 Nos. Of Electric Lifting Barrier. Warranty Period: 30 Months After The Date Of Delivery

Location
West Bengal
Due Date
06 May, 2024
Amount
Refer Document
Ref. No #31616968 Central Government/Public Sector Live   GeM Tender

Supply of Buchholz Q3 Water Flow Indicators Q3 Conservator Cpr Q3 Hv Ct Terminal Box Q3

Location
Himachal Pradesh
Due Date
01 May, 2024
Amount
8.62 Lacs