Supply of Gearless Hand Operated Pulling And Lifting Machine 3.2 Tonne Capacity Ti Rfor, Lifting 3.2 T And Pulling 5.2 T Capacity With Telescopic Operating Handle With 16 .3 Mm Rope Dia And 20 Mtr Rope Length Isi Marked With D Shackles, As Per Rdso Spec. No. Ti /Spc/Ohe/Toolpl/0991 Or Latest Warranty Period: 30 Months After The Date Of Delivery
Supply of Gearless Hand Operated Pulling And Lifting Machine Trifer 0.8 Tone, Pulling Capacity 1.2 Tone An D Lifting Capacity 0.8 Tone With 10 Mtrs Rope And Operating Handle As Per Rdso Spec.No-Ti/Spc/Ohe/Tool Pl/0990 With A&C Slip No 1 Or Latest Warranty Period: 30 Months After The Date Of Delivery
Supply of Gearless Hand Operated Pulling & Lifting Machine Capacity 5.2 Tone And Lifting 3.2 Tones With Steel Wi Re Rope 10 Mtrs With Operating Handle As Per Rdso Specification No. Ti/Spc/Ohe/Tool Pl 0990 With A&C Slip No. 1 & 2 Or Latest Warranty Period: 30 Months After The Date Of Delivery
Supply of Electrically Operated Wagon Pulling Machine Cap. - 05 Ton. As Per Attached Annexure - A. Warr Anty Period: 30 Months After The Date Of Delivery
Supply Of Universal Pulling & Lifting Machine 3/5-Ton Capacity, Pullift As Per Rdso Spec - Ti/Spc /Ohe/Toolpl/1991, Rev -1. As Per Core Item Id: 4200055
Supply Of Hand Operated Pulling And Lifting Machine Tirfor Lifting Capacity 1.6 Tonne And Pulling 2.6 T With Wire Rope 20Meter With D Shackle, With Test Certificate As Per Rdso Spec.Ti/Spc/Ohe/Toolpl/0992. Warranty Period : Up To 30 Months From The Date Of Supply As Per Core Item Id: 4200052
Supply of Refurbishing Of Hydraulic Power Pack System Of The Float Zone Silicon Crystal Pulling Machine Q3
Supply of Gearless Hand Operated Pulling And Lifting Machine 1.6 Tonne Capacity Tirfor, Lifting 1. 6 T And Pulling 2.6 T Capacity With Telescopic Operating Handle With 20 Mtr Rope Length Isi Marked, All A S Per Rdso Spec. No. Ti/Spc/Ohe/Toolpl/0991 Or Latest. Make- Core Approved Source Only. Note:- Material To Be Supplied A T Sse/Trd/Maliya Miyana Office, Near Maliya Miyana Railway Junction, Maliya Miyana, Gujarat 363670. Mob-6353532792 Warr Anty Period: 30 Months After The Date Of Delivery Gearless Hand Operated Pulling And Lifting Machine 3.2 Tonne Capacity Tirfor, Lifting 3. 2 T And Pulling 5.2 T Capacity With Telescopic Operating Handle With 16.3 Mm Dia And 20 Mtr Rope Lengt H Isi Marked With D Shackles, All As Per Rdso Spec. No. Ti/Spc/Ohe/Toolpl/0991 Or Latest. Make- Core Approved S Ource Only. Note:- Material To Be Supplied At Sse/Trd Railway Office, Samakhiyali Near Samakhiyali Railway Station, Samakhiyali, Bachhau Taluka-Kutch, 370150 Gujarat, Mob-6353532792 Warranty Period: 30 Months After The Date Of Delivery
Supply of Lifting Pulling Machine Chain Pulley 5 Ton Capacity Warranty Period: 12 Months After Th E Date Of Delivery
Supply of Pulling And Lifting Machine. Rdso Approved Isi Marked Portable Hand Operated Gearless Pulling And L Ifting Machine Tirfor Comlete Set Of Capacity 5.2 Tonne Pulling And 3.2 Tonne Liftin G 5.2/3.2T Weight Less Than 25 Kg, With Operating Handle And Wire Rope Of Min 16 Mm Di Ameter And 20 Meters Length With Dee Shackle At One End And Tappered And Fused At The Other End, As Per Rdso Specification No. Ti/Spc/Ohe/Tool Pl/0992 Rev. 2 Or Latest W Ith Test Certificate. Make: Tractel Or Similar Warranty Period: 30 Months After The Date Of Delive Ry