Gem Bids For Vis, Mdbfp Foundation, Tdbfp Foundation, Frame For Pre-stressing, Hydraulic Jack System, Electric Pump, Highpressure Tubes, Manifold, Lifting Hook, Packing Plates, Supporting Stool, Steel Shims Etc, Hydraulic Jack Systemand Hand Operated Pump, Travel To Site From Outstationand Return After Completion Of Work, Supervision At Siteincluding Boarding, Lodging, Local Conveyance Etc Allcomplete
Gem bids for Customized Amc/Cmc For Pre-Owned Products -Comprehensive Operation, Maintenance For Medical Gaspipe Line System, Gas Manifold Plant And Modular Ots; --;Comprehensive Maintenance Contract Cmc; As Perrequirement; Yes /
Supply Of Venturi/ep Manifold Assly. 110 V Dc For E70 Brake System.
Gem Bids For Supply, Supply And Installation 316l 1x1 Cylinder Nitrogengas Manifolds Systems, Supply And Installation 316l1x1 Cylinder Caorbondioxide Gas Manifolds Systems, Supply And Installation 316l Of One Cylinder Argongas Manifolds Systems, Supply And Installation Of316l Stainless Steel Seamless Half Inch Tubing Withrequired Fittings Supports Clamps, Supply Andinstallation Of Half Inch Compression End Ss 316lball Valve Of 250 Bar Rated, Analog 316 Ss 4 Inchdial Vacuum Gauge For Nitrogen, Carbon Dioxideand Carbogen Gas, Vacuum Trap And Nrv, Supply Andinstallation Of Ss 316l Secondary Regulator Fornitorgen At Each Point Of Use, Supply Andinstallation Of Ss 316l Secondary Regulator Forargon At Each Point Of Use, Supply And Installationof Ss 316l Secondary Regulator For Carbon Dioxideat Each Point Of Use, Disconnection Of Existing 1 Inchmetal Gas Pipe Line, 4 Inch Pressure Guages For Co2 N2 Andargon Each 2, Installtion Testing Termination Andcommissioning Of Gas Line With All Joints Orbital Welding, Supply And Instalation Ptfe Ss Braided Cylinderonnection Hose For Carbon Dioxide Nitrogen Andcarbogen Gas Manifold System
Supply Of Ultra-high-pressure Injection System:2800 Bar For Hhp Loco Wdg4/wdp4 Traction Motor Pinion Extraction Consisting Of Following Items. 1. Two Speed Ultra High Pressure Hand Pump, Maximum Operating Pressure 2800 Bar 40000 Psi And Manifold Block Mounted On The Pump With 02 Nos. Control Valves For Injection: 01nos 2.ultra High Pressure Hose Pipe Of 03 Meters Long With Working Pressure 2800 Bar 40000 Psi - 02nos 3. Glycerin Filled Pressure Gauge 0-4000 Bar, Ss Contruction Dia 100 Mm Dial - Fitted On The Block : 01no 4. High Pressure Adaptors Suitable For Wdg4/wdp4 Pinions -02nos Make: Crimpwell, Skf, Enerpac Only..