Railway Item Tenders

(Select any tender from the list to send an email)
Ref. No #31648086 Central Government/Public Sector Live

Manufacturing, Supply, Testing And Commissioning Of The Long Rail Exchange Unloading And Loadi Ng Systems On Existing Eur With Modification Described Herein As System. Eur Shall Be Supplied By Indian s Including All Accessories, Hardware And Software As Per Requirement Of Tender. Warranty Period: 24 Months After The Date Of Delivery Comprehensive Annual Maintenance Contract For A Period Of 5 Five Years, Beyond The Warranty Pe Riod Of 24 Months. The Scope Of Annual Maintenance Contract Amc Will Include Complete Cost Of Consumables And Spares Required For Maintenance Of The Supplies Made Vide Sor Number 1 Including All Hardware And Software. Amc Will Include Minimum Two Preventive Maintenances In A Year And Break-Down Maintenance, As A Nd When Required, To Maintain And Keep The System Operational During 05 Year Period, Beyond The Warranty Period Of 24 Months. Payment Of Maintenance Charges As Mentioned Above Will Be Made On Half Yearly Basis. During T He Warranty & Annual Maintenance Contract Amc Period, The Contractor Shall, At His Own Cost And Expense, Re Place And Install Materials Which Get Consumed Or Wear Out Beyond Serviceable Limits The Consumables. And Also Replace Any Part Or Equipment Of A System, Which May Be Defective Or Worn Out, By A Substitute Thereof The Spares, Which May Be Necessary For The Efficient Operation And Maintenance Of The System. The Contractor Sh All Maintain A Sufficient Inventory Of Consumables And Spares For Timely Repair And Maintenance Of The System. This Also Includes The Required Supply Of Spares For The Maintenance Of System During The Contract Period. T His Includes Spares Required For Successful Commissioning As Per Enclosed Technical Specification Of System An D Spares Required For The Contract Period For System. A Comprehensive List Of Spares Comprising All The Parts U Sed In Manufacturing Of The System And The Cost Of All Spares Along With Their Part Numbers And Rate Of Each Spar E Part, Hsn* Code, Applicable Indian Gst Rates Should Be Prepared By The Successful Bidder. The Part Number O F Spares, And Their Numbers Used In Manufacturing Of The System Should Be Provided So As To Make The List A Co Mprehensive One, And The Total Cost Of Such Comprehensive List Of Spares Should Approximately Be Matching Reasonably, With The Total Cost Of Sor Number 1. Approximate Annual Consumption Of Consumables And Sp Ares Shall Also Be Advised In Accordance With Good Industry Practices. Such Comprehensive List Of Spares Sh Ould Be Submitted Post The Signing Of Contract Agreement But Before The Supply Of The First System. Warranty Period: 2 Years, Amc Period: 5 Years, Rate Of Discounting: 0 %

Location
Chhattisgarh
Due Date
12 Jun, 2024
Amount
Refer Document
Ref. No #31638398 Central Government/Public Sector Live

Supply, Installation, Testing And Commissioning Of Smps Based Integrated Power Supply Ips Sys Tem As Per Rdso Spec. No.Rdso/Spn/165/2012 Ver.-3.0 Along With Surge Protection Device, Status Monitorin G Panel, Spares, Tool Kit, Lmla Battery Consisting Of 55 Plus 5 Cells Cells As Per Rdso Spec. Irs:S-88/2004 Alo Ng With Battery Stand.The Configuration Of Ips Should Be As Per Ncr/Hq Drawing No. Typ/2017 /0002-10 For Ibs With Lc Gate .This Includes Transporation To Consignee Depot, From Consignee Depot To Site. Warranty Period: 3 0 Months After The Date Of Delivery Supply, Installation, Testing And Commissoning Of Smps Based Integrated Power Supply Ipssys Tem As Per Rdso Spec. No. Rdso/Spn/165/2012 Ver 3.0 Aiong With Surge Protection Device, Status Monitoring Panel, Spares, Tool Kit, Lmla Battery Consisting Of 55 Plus 5 Sells Cellsas Per Rdso Spece.Irs:S-88/2004 Along With Battery Stand . The Configuration Of Ips Should Be Per Ncr/Hq Drawing No. Typ/2017/0002-11 For Relay Hu T /Lsc With Aftc, Axle Counter And Lc Gate.This Includes Transportation To Consignee Depot, From Consignee Dep Ot To Site, Installation And Commissioning Of Integrated Power Supply System After Duly Filling Precommissioning C Heck List Jointly By Rdso Approved Vendor And Representative. Shall Be Procured Though Store Wi Th Gst, Frieght And Commissioning Charges.This Includes Transporation To Consignee Depot, From C Onsignee Depot To Site. Warranty Period: 30 Months After The Date Of Delivery Supply And Comissioning Of Smps Based Integrated Power Supply System For Interlocked Lc Gate In Re Section As Per Rdso Specn.No. Rdso/Spn/165/2023 Ver. 4. 0 Amdt.1 As Per Drawing Attached Of Along With Battery Set Of 110V/300Ah.This Includes Tr Ansporation To Consignee Depot, From Consignee Depot To Site. Warranty Period: 30 Months After The Date Of Del Ivery Supply Installation Testing And Commissioning Of Smps Based Integrated Power Supply Ips Syst Em, As Per Rdso Spec. No. Rdso/Spn/165/2012 Ver.3.0 Along With Surge Protection Device, Status Monitorin G Panel, Spares, Tool Kit, Lmla Battery Consisting Of 55 Plus 5 Cells Cells As Per Rdso Spec. Irs:S-88/2004 A Long With Battery Stand. The Configuration Of Ips Should Be As Per Ncr/ Hq Drawing No. Typ/2017/0002-06 For Ei Station Up To 04 Lines With Block Panel And Lc Gate. This Includes Transportation To Consignee Depot From Consi Gnee Depot To Site, Installation And Commissioning Of Integrated Power Supply System After Duly Filing Pre Commi Ssioning Check List Jointly By Rdso Approved Vendor And Representative.This Includes Transporation To C Onsignee Depot, From Consignee Depot To Site. Warranty Period: 30 Months After The Date Of Delivery Supply, Installation Testing And Commissioning Of Smps Based Integrated Power Supply System I Ps , As Per Rdso Spec. No. Rdso/Spn/165/2012 Ver.3.0 Along With Surge Protection Device, Status Monitori Ng Panel, Spares, Tool Kit, Lmla Battery Consisting Of 55 Plus 5 Cells Cell As Per Rdso Spec. Irs-S-88/2004 Al Ong With Battery Stand. The Configuration Of Ips Should Be As Per Ncr/Hq Drawing No. Typ/2017/0002-08 For Ei Station Up To 6 Lines With Block Panel And Lc Gate.This Include Transporation To Consignee Depot To Site, Installatio N And Commissioning Of Integrated Power Supply System After Duly Filling Pre Commissioning Checklist Jointly By Rdso Approved Vendor And Representative.This Includes Transporation To Consignee Depot, From Consig Nee Depot To Site. Warranty Period: 30 Months After The Date Of Delivery

Location
Uttar Pradesh
Due Date
15 May, 2024
Amount
Refer Document