Single Stage Handling And Transport Work For Center Rampura
Construction Of 10 Block 1 Block 5 Nos Toilet Temporary Sanitary Arrangement In Connection With Capf/Spf For Loksabha Election 2024 Under Rcfa Division-I Phe Dte.Name Of Accomodation Centre 1.Natundanga Hostel 2.Gourbazar Rampada High Schoo
Transport Work At Wheat Purchase Centers District Rampur In Rigion
Replacing Tiles Into Cement Concrete Flooring And Replacing Old Rusted Grills, Irc Fabrics In 13 Kharjas, Connection Of Drinking Water, Raising Ramp From The Gallery To Kharjas, Porta Cabin For Computer Operators In Kkd Lockup, Delhi Dg. 2023-24
Electrical Work In Connection With At Narkatiaganj- Provision Of 12M Wide Fob With Ramp For Development Of Station Under Amrit Bharat Station Scheme.
Supply, Erection, Testing & Commissioning Of 25Kv A.C. Single Phase Overhead Equipment, Lt Supply Transformer And Switching Station Etc. In Connection With Construction Of A Bye Pass Line At Sita Rampur B Andal- Development Of Infrastructure Related To Infrastructure Deficiencies At Durgapur Steel Exchange Yard And Empty Yard/Andal
Supply of VEHICULAR HINGED RAMP ASSY / RAMP, RAMPLOADING VEHICLE HINGED TYPE, RAMP LOADING VEHICLE LOOSE TYPE, RELAY VALVE (LOT 3 & 4), SEAL PLAIN B115 X 150 X 12, etc
Temporary Electrification For Accommodating Capf For Loksabha Election 2024 At Different School Under Rampurhat Ps - Shyampahari Rk Sikshapith, Naisoregram High School, Poura Market Municipal Hall 2Nd Floor, Rishi Arabindaniketan, Mashra High Schoo Bired
Special Repair To Ramps And Footpaths At Certain Locations At Af Stn Digaru.
Sinking Of Rbtw By Direct Rotary Method Of Drilling 100 Mm X 102 Mtr Depth And Installation Of Pumping Machinery With Storage Tank At Different Schools And Others Places Of Rampurhat-I Block For Accomadation Centres Of Capf Icw Ensuing Lsge 2024
Sinking Of Rbtw By Dth Method Of Drilling 125 Mm X 115 Mm X 120 Mtr Depth And Installation Of Pumping Machinery With Storage Tank At Different Schools Of Nalhati-I And Rampurhat-I Block For Accommodation Centres Of Capf Icw Lsge 2024
Sinking Of Rbtw By Direct Rotary Method Of Drilling 100 Mm X 102 Mtr Depth And Installation Of Pumping Machinery With Storage Tank At Different Villages And Others Places Of Rampurhat-I Block For Accommodation Centres Of Capf Icw Ensuing Lsge 2024
Sinking Of Rbtw By Direct Rotary Method Of Drilling 100 Mm X 102 Mtr Depth And Installation Of Pumping Machinery With Storage Tank At Bataspur High School And Hazi Moulana Box Madrasha High School And Others Places Of Rampurhat-I Block For Accomadat
Sinking Of Rbtw By Dth Method Of Drilling 125 Mm X 115 Mm X 120 Mtr Depth And Installation Of Pumping Machinery With Storage Tank At Chandragati M.M High School, Kharbona High School And Shyampahari Rk Sikshapith And Others Places Of Rampurhat-I Bl
Sinking Of Rbtw By Direct Rotary Method Of Drilling 100 Mm X 102 Mtr Depth And Installation Of Pumping Machinery With Storage Tank At Sadashibpur High School Of Murarai Ii Block And Tarapith Taratirtha High School Of Rampurhat Ii Block And Others
Sinking Of Rbtw By Dth Method Of Drilling 125 Mm X 115 Mm X 120 Mtr Depth And Installation Of Pumping Machinery With Storage Tank At Panchra Girls School Of Khoyrasole Block And Ramprasad Roy Smriti High School Of Suri-I Block And Others Places
Cleaning Of Weighbridge Office, Weighbridge Ramp And Surrounding Area For A Period Of 6 Months Under Block-Ii Area
Improvement/Widening Of Cess And Formation In Lalkuan-Kashipur Section-32Km Of Izn Division Under Sanctioned Work Of Improvement/Widening Of Cess And Formation In Rampur-Lalkuan -Kashipur And Bhojipura-Pilibhit-Tanakpur-Total -171.79Km- Note-Earth Is From Private Land
Construction Of Viaduct Portion Of Elevated Corridor, Robs Except Steel Spans And Exit/Entry Ramps, Svup, Lvups, Vups, Pups, Construction / Reconstruction / Widening Of Culverts, Nhai Office Building, Other Miscellaneous Works, Including Electrification & Lighting Except Design, Supply, Fabrication & Launching Of Steel Bridge Spans, Re Wall, Road Work, Diversion, Intersections, Utility Shifting Etc, In Connection With Construction Of Six Lane Elevated Kona Expressway From Ch. 0.145 Km To 7.337 Km Of Nh 117 In The State Of West Bengal On Epc Mode
Electrification For Improvement To Water Supply Arrangement, Drainage System & Road Etc. At Dadar-Matunga Colony. B Rewiring And Improvement To Officers Club At Dadar- Matunga. C Rewiring And Improvement To Officers Club At Dadar-Parel. D Electrification For Modification Of Existing Stairs, Ramps On Pf.05 For Removal Of Infringement W.R.T. Dn Through Line At Dadar. E Electrification For Relocation Of Existing Over Head Offices And Dismantling Of Old Age Deck On Pf No.3/4 And Provision Of Staircase To Existing Fobs At Csmt End At Dadar. F Electrification For Relocation Of Existing Grp Office On Pf No. 3-4 For Decongestion At Csmt End At Dadar. G Electrification For Repair And Improvement Of Circulating Area Of Rest House At Parel And Construction Of 06 Bedded Rest House At Parel.