Signaling Work In Connection With 1 Ukai Songadh-Jalgaon Section- Replacement Of Stone Slab Bridges By Providing Box Culverts .Total 21 Nos 2Churchgate-Jalgaon Sec. Repl. Of Corroded Steel Girders By Precast Rcc/Psc Slab On Bridges Total Bridge 11 Nos. & Span 50Nos.
Proposed Renewal Of Existing Culverts With Rail / Joist & Slab, Stone Slabs With Rcc Box - 8 Bridges . Qln - Tvc Section
Re-Building Of Existing 31M Long Br. No-14 I.E 1X0.61 H.P Culvert With 3.00M X 2.5M Size Rcc Box Culvert By Cast In Situ Method Including 120M Storm Water Drain In Both Side Of The Railway Boundary To Golaghat Municipal Sewage System.
Re-Construction Of Damaged Culvert With Rcc Box Culvert 6 Mtr X 5 Mtr Single Cell In Sh-14 At Chowkidar Nallah Ch 9.80 Km Under Sd-Iii, Cd, Apwd, Diglipur
Formation Of Industrial Layout Including Formation Of Road No.D-11 And Road No.D-12 Of 30M Wide Roads Of Flexible Pavement, Construction Of Rcc Side Drains, Rcc Box Culverts, Rcc Utility Ducts, Rcc Retaining Wall, Drain Crossings, Etc., At Sector-8 Of Phase-3
Formation Of Industrial Layout Including Formation Of Road No. E-10 Of 24M Wide Roads And 30M Wide Roads Of Flexible Pavement, Construction Of Rcc Side Drains, Rcc Box Culverts, Rcc Utility Ducts, Rcc Retaining Wall, Drain Crossings, Etc., At Sector-7 Of Phase-3
Formation Of Industrial Layout Including Formation Of Road No.D-10 Of 30M Wide Roads And 30M Wide Roads Of Flexible Pavement, Construction Of Rcc Side Drains, Rcc Box Culverts, Rcc Utility Ducts, Rcc Retaining Wall, Drain Crossings, Etc., At Sector-6 Of Phase-3
Formation Of Industrial Layout Including Formation Of Roadno.C-05 Of 32M Wide Roads Of Flexible Pavement, Construction Of Rcc Side Drains, Rcc Box Culverts, Rcc Utility Ducts, Rcc Retaining Wall, Drain Crossings, Etc., At Sector-5 Of Phase-3
Formation Of Industrial Layout Including Formation Of 32M Wide Roads And 30M Wide Roads Of Flexible Pavement, Construction Of Rcc Side Drains, Rcc Box Culverts, Rcc Utility Ducts, Rcc Retaining Wall, Drain Crossings, Etc., At Sector-4 Of Phase-3
Formation Of Industrial Layout Including Formation Of Road No C-06 Of 32M Wide Road And 60M Wide Road Of Flexible Pavement, Construction Of Rcc Side Drains, Rcc Box Culverts, Rcc Utility Ducts, Rcc Retaining Wall, Drain Crossings Etc At Sector-3 Of Phase-3
Formation Of Industrial Layout Including Formation Of Road No A-04 Of 60M Wide Road Of Flexible Pavement, Construction Of Rcc Side Drains, Rcc Box Culverts, Rcc Utility Ducts, Rcc Retaining Wall Etc At Sector-2 Of Phase-3
Formation Of Industrial Layout Including Formation Of 60M Wide Road Of Flexible Pavement, Construction Of Rcc Side Drains, Rcc Box Culverts, Rcc Utility Ducts, Rcc Retaining Wall Etc At Sector-1 Of Phase-3
Construction Of Rcc Box Culvert Bridge Over Horai River Near Bhanderhuli Within Para Block