Providing And Fixing One No. Portable Cabin With Rcc Platform For Loading Line No. 03 At Sardega Railway Siding Under Mahalaxmi Area
Construction Of Boundary Wall At Nelamangala Nmga At Km 13/300-14/000, Kunigal Kigl At Km 58/200-550 On Lhs And Rhs, Yediyuru Yy At Km 75/800-76/200 On Lhs And Rhs And B G Nagar Bgnr At Km 90/000-550 On Lhs Stations In Aden/Kunnigal Sub-Division. Sw Ii : Shravanabelogala Sbga Station : Proposed Construction Of Platform Toilet At Pf-1. Sw Iii : Construction Of Rcc Drain For A Length Of 1500M In Connection With The Work Of Bengaluru-Salem Sec : Through Ballast Recoupment Of Points And Crossings 10 Nos At Hosur Hsra Yard In Aden/Dharmapuri Section. Maintenance Period Is 6 Months