Execution Of Retaining Wall And Rcc Box With Allied Associated Works In Connection With Provision Of Future Rur Line Of Vedanta Ltd Passing Under Ib Fly Over
Rcc Retaining Wall And Drain Work Alongside Of Railway At Kspp Khurja Project Of Thdc
Execution Of Minor Bridge, Toe Wall/Retaining Wall, Fob, Pf, Rcc Road, Station Building, Type-Ii Quarter Etc. In Connection With Deshpran-Nandigram New B.G Rail Line Under The Jurisdiction Of Dy Ce/Con/Garden Reach, West Bengal. Sanctioned Estimate No. 1941W/2023.
Provision Of Rcc Retaining Wall Near Battery & Equipment Rooms In C/W Provision Of Sectioning & Paralleling Sp Post In Between Pky-Tpz Section For Feeding Arrangement Over Umb Division.
Construction Of Rcc Retaining Wall At Fore Bay Of Intake Pump House
Supply of 2123 Rcc Svl Bkr, 6 Construction Materials Comma B And R Items E And M Items Including Lightening Conductor Constructioin Materials For Retaining Wall Constructioin Materials For Drain And Sump Fire Alarm Furniture
Supply of 2078 Rcc Pd, 6 Construction Materials Comma B And R Items E And M Items Including Lightening Conductor Constructioin Materials For Retaining Wall Constructioin Materials For Drain And Sump Fire Alarm Furniture
Construction Of Rcc Retaining Wall For New Crushing And Screening Plant At Sitapatore Mine.
Improvement To Ballast Retainer, Inspection Steps And Bridge Protection Works In Various Bridges Between Baradwar-Raigarh Sections And Execution Of Balance Work Of Elimination Of Rail Opening Bridges By Rcc Box For Bridge No.44Dn, 56Up&Dn, 61A Up&Dn, 148 Dn, 191Up & Other Miscellaneous Repair Work Of Retaining Wall, Floor & Drain Etc
Supply of 01 X Ug Ops Room, 11 Supply And Constr Pre Cast Rcc Structure Of Ug Ops Room Aluminium Door Window And Ventilator For Ug Ops Room Pre Cast Retaining Wall For Ug Op Room Joineries For Ug Ops Room Electrical Fitting Complete Lighting Conductor Complete Sanitary Fitting Complete Earthing Set Complete Fire Alaram And Extinguisher Double Sleeping Bunks Furniture Items
Formation Of Industrial Layout Including Formation Of Road No.D-11 And Road No.D-12 Of 30M Wide Roads Of Flexible Pavement, Construction Of Rcc Side Drains, Rcc Box Culverts, Rcc Utility Ducts, Rcc Retaining Wall, Drain Crossings, Etc., At Sector-8 Of Phase-3
Formation Of Industrial Layout Including Formation Of Road No. E-10 Of 24M Wide Roads And 30M Wide Roads Of Flexible Pavement, Construction Of Rcc Side Drains, Rcc Box Culverts, Rcc Utility Ducts, Rcc Retaining Wall, Drain Crossings, Etc., At Sector-7 Of Phase-3
Formation Of Industrial Layout Including Formation Of Road No.D-10 Of 30M Wide Roads And 30M Wide Roads Of Flexible Pavement, Construction Of Rcc Side Drains, Rcc Box Culverts, Rcc Utility Ducts, Rcc Retaining Wall, Drain Crossings, Etc., At Sector-6 Of Phase-3
Formation Of Industrial Layout Including Formation Of Roadno.C-05 Of 32M Wide Roads Of Flexible Pavement, Construction Of Rcc Side Drains, Rcc Box Culverts, Rcc Utility Ducts, Rcc Retaining Wall, Drain Crossings, Etc., At Sector-5 Of Phase-3
Formation Of Industrial Layout Including Formation Of 32M Wide Roads And 30M Wide Roads Of Flexible Pavement, Construction Of Rcc Side Drains, Rcc Box Culverts, Rcc Utility Ducts, Rcc Retaining Wall, Drain Crossings, Etc., At Sector-4 Of Phase-3
Formation Of Industrial Layout Including Formation Of Road No C-06 Of 32M Wide Road And 60M Wide Road Of Flexible Pavement, Construction Of Rcc Side Drains, Rcc Box Culverts, Rcc Utility Ducts, Rcc Retaining Wall, Drain Crossings Etc At Sector-3 Of Phase-3
Formation Of Industrial Layout Including Formation Of Road No A-04 Of 60M Wide Road Of Flexible Pavement, Construction Of Rcc Side Drains, Rcc Box Culverts, Rcc Utility Ducts, Rcc Retaining Wall Etc At Sector-2 Of Phase-3
Formation Of Industrial Layout Including Formation Of 60M Wide Road Of Flexible Pavement, Construction Of Rcc Side Drains, Rcc Box Culverts, Rcc Utility Ducts, Rcc Retaining Wall Etc At Sector-1 Of Phase-3
Earthwork & Blanketing In Embankment /Cutting In Formation Of Bg Line Including Yards, Bridge Approaches Etc., Construction Of Bridge Work Major/Minor, Sub Structure And Super Structure As Per Railways Approved Design And Drawing, Construction Of Retaining/Boundary/Toe Wall/Diversion Drain, Construction Of Station Buildings, Covering Shed At Badiya Station, Passenger Amenities, Foot Over Bridge, Yard Drain, Supply & Spreading Of Machine Crushed Stone Ballast, Laying And Linking Of Bg Track For Main Line, Loop Lines And Points & Crossing Etc. In Section/ Yards, Transportation Of P.Way Materials, Welding Of Rails, And Other Incidental Miscellaneous Works Etc. Between Patalpani Station Excluding - Portal 01 Of Tunnel T1 Ch:7440, Circulating Area, Rcc Road, Rcc Over Head Tank And Other Misc. Works At Badiya Stations In Connection With Gauge Conversion Of Dr. Ambedkar Nagar Mhow - Sanawad Section