Supply of Integerated Wtcc., As Per Drawing: Lg10344 Alt.A, Packing Instruction: 1. The Supplie R Shall Pack The Integrated Wtcc In A Suitably Designed Returnable Fixture In Such A Way That Integrated Wtcc Shall Not Get Scratched, Damaged, Twisted During Tran Sportation, Storage And Lifting And To Avoid Scratches On Outer Surface. It Shoul D Be Wrapped With Enviroment Friendly Material And It Should Have Standard Clampi Ng /Fastening Mechanism So That It Can Be Opened Easily. It Should Have Firms Identif Ication Mark. 2. First Returanable Fixture Along With Integrated Wtcc Be Retained B Y Rcf & This Fixture Shall Be Exchanged In The Second Lot Supply And So On. At The En D Of The Contact, The Firm Shall Collect The Remaining Returnable Packing Fixture F Rom Rcf. 3. The Packing Fixture/Frame To Be Fabricated Having Sufficient Strenght T O Bear Approximate 1 Tonne Load In Static & Moving Condition Of Two Coach Set Of In Tegrated Wtcc. 4. The Fixture /Frame/Pallet Should Be Designed So That The Packed Wtcc Remain Preferably In Horizontal Position To Minimize Surface Area. 5. It Should Also Be Suitable For Storage Of Integrated Wtcc Under Open Sky. Warranty Period: 30 Months After The Date Of Delivery
Supply of Hydraulic Platform Truck Sky Lift With Truck. As Per Attached Technical Specification Annexure Warranty Period: 30 Months After The Date Of Delivery
Supply of 1 Truck Mounted Sky Man Lifter Q3
Proposed Civil Works For The Provision Of Lift - 1No. At Pf No. 9 And 10 For Fob At Bnc End Of Ksr Bengaluru Station. Sw-Ii: Proposed Civil Works For The Provision Of Lift - 1No. At Pf No. 5 And 6 For Fob At Bnc End Of Ksr Bengaluru Station. Sw-Iii: Provision Of Lift To Fob Connecting Metro Sky Walk On Back Side Of Ksr Bengaluru Station. Sw-Iv: Ksr Mysore Section: Proposed Constructions Of Track Men Rest Room/Tool Room. - 7Nos. In Aden/Mya Section - Balance Work. Maintenance Period Is 3Months.