Suplly Of Items For Nmhs Project On High Altitude Wetland, 84 Sherman Animals Traps Camera Trap Song Meter Micro Laptop Digital Camera Camera Lens Double Beam Uv Vis Spectrophotometer Water And Soil Analysis Kit Deep Freezer Vertical Model Temperature Minus Forty Along With Voltage Stabilizer
Provn Of Three Phase Sub Main Wiring In Bldg, 290 Supply And Fixing Of Sub Main Wiring 3 Run Of 6 Sqmm Core Multi Std Pvc Insulated All As Per Ser No 1 Above But For Wiring With 2 Run Of 4 Sqmm And 1 Run Of 4 Sqmm M And L For Earthing Complete In Galvanished Iron Mild Steel Earth Plate Excavating In Trenches Not Exceeding 1 Point 5 Meter Wide And Depth Returning Filing In Including Spreading Levelling Watering Removing Excavating Material Soil Not Exceeding 50 Mtr Supply And Fixing Of Pipe In Trenches In Road Crossing Supply And Fixing In Replacement Of Security Light Fitting Led 45 Watt Bulb With Senson. Supply And Fixing Mccb Incomer Distribution Board Double Door Vertical Type
Supply of Pid Controller Wireless Daq Module Temperature Transmitter Ir Sensor Temperature Transmitter Air Velocity Sensor Humidity Cum Temperature Transmitter Soil Moisture And Humidity Sensor Handheld Digital Solar Power Meter Load Cell With Signal Transmitter
Supply, Installation And Termination Of 100 Pair Pijf 0 Point 5 Mm Armoured Telecom Cable, 50 Pair Pijf Ug Cable 0 Point 5Mm Armoured, 100 Plus 100 Pair Pillar Box Including 10 Pair Insulation Displacement Modules With Full Capacity, 100 Pair Jointing Kit, Route Marker And Joint Indicator, Digging And Back Filling Of Trench In Soil 3169 Meters, Digging In Tar Road Cutting Closing And Consolidation Of Trench 122 Meters, Laying Of Pijf Cable In Soil With Sand And Brick Protection 3500 Meters, Laying Of Pijf Cable In Culverts With Hdpe Pipes And Clamps 122 Meters, Laying Of Pijf Cable In Tar Road Cutting With 4 Inches Gi Pipe 87 Meters, Erection Of The Pillar Boxes 5 Nos, Erection Of The Route Markers And Joint Indicators 40 Nos